Wisconsin · Machinery

Structural steel for Wisconsin machinery plants

Wisconsin is one of the most manufacturing-heavy states in the US. Milwaukee, Racine, Kenosha, Oshkosh and the Fox Valley build engines, heavy trucks, mining and construction equipment, controls and power tools. Their assembly halls are long and wide, with cranes for heavy parts and floors for offices and lines.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.

Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Clusters
Milwaukee, Racine, Oshkosh
Products
Engines, trucks, equipment
Halls
Long-span assembly
Inside
Cranes and mezzanines

Why it matters

Assembly halls that keep growing

An equipment plant moves heavy parts from bay to bay on cranes, so the crane class sets the columns and runways. Lines change with each new product, mezzanines carry offices and sub-assembly, and plants add bays as orders grow, often next to a hall that keeps working.

Our plant built 5,000 t of structural steel for the Sunpro Steel factory in Vietnam. We design or detail long-span frames, crane runways and mezzanines, keep the model for the next bay and release the steel area by area.

What we design and fabricate

Steel for machinery plants

Long-span halls

Rigid frames and trusses for wide assembly halls.

Crane bays

Runways and crane columns for heavy parts.

Mezzanines

Floors for offices and sub-assembly.

Roof plant

Platforms and dunnage for air handling.

Who does what

Plant steel, split clearly

World Steel supplies

  • Frame, runway and mezzanine design or detailing
  • Packages released area by area
  • A model kept for the next bay
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Crane classes and loads from the owner
  • Engineer of Record approval and PE seal
  • Plan approval, permit and inspections
  • Cranes and production equipment
  • Erection and site work

Wisconsin

What we do not claim

World Steel names no machinery, truck or equipment maker as a customer and claims no completed Wisconsin plant. Sunpro Steel is a project in Vietnam.

Wisconsin ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Wisconsin contractors

Wisconsin contractors: let’s win the next project together

If your next bid involves machinery plants, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.

Two welders operating a submerged-arc welding station on a member
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.

Q&A

What Wisconsin buyers ask

Can the plant grow later?

Yes. We design end walls to come off and keep the model so the next bay matches.

Do you supply crane runways?

Yes. Runway beams, brackets and crane columns for the crane classes the plant specifies.

How large a plant can you supply?

Our plant fabricates 2,500 t a month; Sunpro Steel used 5,000 t of our steel.

Official sources: Wisconsin Economic Development Corporation: manufacturing

Wisconsin solutions

Every Wisconsin guide

Related pages

Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Wisconsin?

Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.