Start from the rack grid
The white space sets the column grid
Rack rows, hot and cold aisle containment, power distribution and the path of the cooling air all come before the steel. When the column grid is drawn from that layout, columns land in the service zones between pods instead of in the middle of a row, and the hall can be refitted later without moving the frame.
For a single-story hall we compare a clear-span frame against wider bays with interior columns. Clear span gives the most freedom for future rack layouts; interior columns can reduce steel tonnage and roof depth. Both are designed to AISC 360 for the loads in your design criteria, and your Engineer of Record approves the choice.
Members are built up from plate in our own plant where it saves steel: tapered columns and rafters put material only where the bending is, and deep plate girders or trusses carry the widest spans. Hot-rolled sections are used where they are the better answer.
Three frame types
Which frame fits your hall
Tapered built-up rigid frames
Efficient for single-story halls with moderate hung loads. Fast to erect, bolted end-plate connections, clear interior.
Long-span trusses
For the widest clear spans and heavy hung loads. Depth gives room to route cable tray and ducts through the roof zone.
Braced frames with hot-rolled members
Where the hall sits in a multi-story block or the roof carries heavy plant. Braced bays placed in walls and service zones.
Coordinated before fabrication
What the hall frame has to make room for
| System | What it needs from the steel | How we handle it |
|---|---|---|
| Cable tray and busway | Hanger points on a regular module, limits on deflection | Hanger steel and purlin spacing set out from your electrical model |
| Containment and ceilings | A flat, level support grid at the right height | Secondary steel detailed in Tekla with the frame |
| Cooling air paths | No beams across supply or return openings | Openings and headers framed where your mechanical design puts them |
| Fire protection mains | Support for sprinkler mains and pre-action piping | Load allowance agreed with your fire protection engineer |
| Future refits | Spare capacity and repeatable hanger positions | Hung load allowance stated on the calculations, as set in your criteria |