Data center steel · The data hall

Data hall frames that leave the white space to the racks

A data hall is a long, open room whose real tenant is the equipment. The frame has to stay out of the rack rows, carry everything that hangs from the roof and go up quickly. We design and fabricate it around your white space layout, not the other way round.

Start from the rack grid

The white space sets the column grid

Rack rows, hot and cold aisle containment, power distribution and the path of the cooling air all come before the steel. When the column grid is drawn from that layout, columns land in the service zones between pods instead of in the middle of a row, and the hall can be refitted later without moving the frame.

For a single-story hall we compare a clear-span frame against wider bays with interior columns. Clear span gives the most freedom for future rack layouts; interior columns can reduce steel tonnage and roof depth. Both are designed to AISC 360 for the loads in your design criteria, and your Engineer of Record approves the choice.

Members are built up from plate in our own plant where it saves steel: tapered columns and rafters put material only where the bending is, and deep plate girders or trusses carry the widest spans. Hot-rolled sections are used where they are the better answer.

Three frame types

Which frame fits your hall

Tapered built-up rigid frames

Efficient for single-story halls with moderate hung loads. Fast to erect, bolted end-plate connections, clear interior.

Long-span trusses

For the widest clear spans and heavy hung loads. Depth gives room to route cable tray and ducts through the roof zone.

Braced frames with hot-rolled members

Where the hall sits in a multi-story block or the roof carries heavy plant. Braced bays placed in walls and service zones.

Coordinated before fabrication

What the hall frame has to make room for

SystemWhat it needs from the steelHow we handle it
Cable tray and buswayHanger points on a regular module, limits on deflectionHanger steel and purlin spacing set out from your electrical model
Containment and ceilingsA flat, level support grid at the right heightSecondary steel detailed in Tekla with the frame
Cooling air pathsNo beams across supply or return openingsOpenings and headers framed where your mechanical design puts them
Fire protection mainsSupport for sprinkler mains and pre-action pipingLoad allowance agreed with your fire protection engineer
Future refitsSpare capacity and repeatable hanger positionsHung load allowance stated on the calculations, as set in your criteria

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Frame design to US codes for your EOR’s review
  • Tekla model with hanger steel set out from your MEP model
  • Shop drawings at no extra charge
  • Built-up members welded from plate in our plant

The US contractor, our customer, and others

  • Rack layout, containment and power distribution design
  • Foundations and anchor rod setting
  • Erection and field connections
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a data center.

Rows of columns, rafters and purlins inside a large steel building Photo
Inside a finished World Steel frame on a job abroad (location not stated).
Curved long-span trusses being set during erection Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Data hall frames: questions we hear

Can you design a clear-span data hall?

Yes. We compare clear-span frames and trusses with interior-column layouts for your hall, then design the option your Engineer of Record approves. The span that makes sense depends on the loads and the roof you need.

Can the frame take heavier racks later?

The frame carries the hung and floor loads in your design criteria. If your owner wants spare capacity for future density, it goes into those criteria and onto the calculations from the start.

Do you supply the roof and walls too?

Yes, when you want them. Roof and wall panels, insulation and trims are made in Vietnam and can ship with the frame, or we supply the frame only.

Does World Steel provide shop drawings for data center steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and the owner’s design criteria govern, and your Engineer of Record confirms them for each project.

Talk to our data center steel team

Send the campus plan, the owner’s design criteria and the phase you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.