Factory paint system
ISO 12944-5 type systems
Abrasive blasting followed by zinc-rich primer, an epoxy mid-coat and a polyurethane topcoat, with the number of coats and film builds set by the exposure and the durability your specification names.
Best for: Most buildings, any color, interior and exterior steel
