Yard by yard
What each yard needs from the steel
Generator yards
Maintenance platforms around stacked generator sets, stairs and catwalks, supports for fuel piping and exhaust, screens for noise and sight lines.
Electrical yards
Platforms and cable support steel around transformers and switchgear, plus canopies where equipment needs shelter from sun and rain.
Cooling yards
Elevated platforms that lift chillers or dry coolers for airflow and piping below, with access for maintenance crews.
Screen walls
Framed screens around yards and on roofs, designed for wind and detailed for the cladding or louver you choose.
Access
Stairs, ladders, handrails and guardrails detailed with the platforms, so they fit the first time.
Equipment shelters
Small steel buildings for electrical rooms, pump rooms and storage around the yard.
Galvanized for outdoors
Yard steel lives outside, so it is protected for that
Yard steel sits in rain, sun and, on many sites, salt air or de-icing salts. We hot-dip galvanize platforms, grating supports and stairs, or apply a coating system picked for the exposure, and detail connections so water drains out instead of pooling.
Platforms are bolted together and sized for the container, so a yard arrives as kits marked by area and goes together without field welding.