Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Montana · Building code

Structural steel and the Montana building code

Montana adopts the IBC statewide with state amendments through the Department of Labor and Industry. Certified cities and counties enforce it inside their jurisdictions, and the state Building Codes Program reviews commercial work everywhere else. We confirm the reviewer and edition for your site before we model.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your Montana site.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Statewide code
IBC with amendments
Adopted by
Labor and Industry
Enforced by
Certified locals or state
Our part
Code stated on sheet one

Why it matters

One code, two review paths

A warehouse in Billings is reviewed by the city, while a shop outside Sidney may be reviewed by the state. Seismic, snow and wind values change sharply between the western valleys and the eastern plains.

We confirm the edition and reviewer with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.

Design basis

What the steel design states

The items we confirm with your Engineer of Record before modeling.

ItemWhat we state
CodeThe Montana building code edition and the reviewing office
WindASCE 7 wind speed, exposure and risk category
SnowGround snow, drift and the roof shape
SeismicSite class and Seismic Design Category
EnvelopeGirt and purlin details for the adopted energy code

Who does what

Code work, split clearly

World Steel supplies

  • Steel design or detailing to the stated code basis
  • Calculations and drawings for plan review
  • Answers to reviewer comments on the steel
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The permit application
  • Engineer of Record approval and PE seal
  • Geotechnical report and site class
  • Special inspections and local inspections
  • Foundations and erection

Montana

What we do not claim

World Steel holds no Montana approval and no Montana engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.

Montana ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Montana contractors

Montana contractors: let’s win the next project together

If your next bid involves Montana building code, World Steel wants to be your long-term, win-win steel partner in Montana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Montana project is cut, welded, inspected and packed.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Labeled stacks of steel plate under a gantry crane
Raw plate stock waiting in the World Steel yard, Vietnam.
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.

Q&A

What Montana buyers ask

Is the Montana code statewide?

Yes. The IBC is adopted statewide with state amendments.

Who reviews my plans?

A certified city or county, or the state Building Codes Program. We confirm it early.

Can you answer plan review comments?

Yes. We answer comments on the steel and revise drawings through your Engineer of Record.

Official sources: Montana Building Codes Program

Building in Montana?

Send the drawings or the site address, size and use. We set the Montana design basis with your Engineer of Record, design or detail the steel to the Montana building code, western seismic belts and mountain snow, and quote it made in our plant in Vietnam, packed complete in erection order and delivered by rail or truck to your site.