Drone view across the World Steel plant: office block in front, fabrication halls behind

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Total solution · United States

Consult. Design. Fabricate. Deliver. One supplier answers for all of it.

World Steel USA carries a metal building from the first scope call to a US port near your jobsite. The same company helps shape the concept, engineers it to US codes, fabricates every part in its own accredited plant and ships it, with one project manager accountable at each stage.

Consulting
System choice, scope, budget and Value Engineering
Design basis
IBC 2024 · ASCE 7-22 · AISC 360 · AISI S100
Fabrication
Own IAS AC472-accredited plant
Delivery
Erection-order bundles · West, Gulf and East Coast ports

Consulting

Get the scope right before you price it

Most of a metal building’s cost is locked in by early decisions: clear span versus interior columns, eave height, roof pitch, door sizes, crane loads and the coating system. Our estimators and engineers review your request while those decisions can still move.

Send what you have, from a full architectural set or IFC model to a napkin sketch with dimensions and an address. The proposal that comes back names the framing system, the products supplied, the exclusions, the Incoterm and who acts as importer of record.

Gate of the World Steel plant with the office block and two of its fabrication halls Photo
Fitter comparing a built-up beam with its shop drawing Photo
  • Framing system choice

    Clear span, modular or multi-span, lean-tos, mezzanines, crane runways and canopies, matched to how the building will be used.

  • Scope across 16 building systems

    Frame, roof and wall envelope, doors, windows, insulation and accessories, each marked as World Steel made, partner made or optional.

  • Value Engineering review

    Tapered built-up members and repeatable connections where they reduce steel, always submitted to your Engineer of Record.

  • Exposure and durability advice

    Coatings, fastener finishes and panel choices for coastal air, de-icing salt, humidity or livestock environments.

US code design

Designed to the code your building department enforces

Our default basis is the 2024 International Building Code with ASCE 7-22 loads, AISC 360 for hot-rolled and built-up steel, AISI S100 for cold-formed purlins and girts, AISC 341 where seismic detailing applies, AWS D1.1 for welding and MBMA practice for metal building systems. If your state runs an earlier IBC edition, or your Engineer of Record sets a different basis, we design to that instead and write it down before analysis begins.

Frames are analyzed in SAP2000 and modeled in Tekla Structures. You receive approval drawings, an anchor rod plan and base reactions for your foundation engineer, a submittal package for the building department, and an IFC model for BIM coordination with your architect and MEP trades.

  • IBC 2024
  • ASCE 7-22
  • AISC 360
  • AISI S100
  • AISC 341
  • AWS D1.1
PEB Studio: 3D model colored by status, demonstration data Demonstration data
Quality inspector taking dimensions on a finished steel member Photo
  • Wind and snow

    Panels, fasteners, purlins, doors and anchorage designed as one load path for the site’s wind speed, exposure and ground snow load.

  • Seismic

    Bracing and connection details chosen for the Seismic Design Category of your address.

  • IAS AC472 Part C

    World Steel’s metal building design process is part of its IAS accreditation.

  • Your Engineer of Record

    Calculations and drawings are prepared for your engineer, who reviews, approves and seals them for the permit.

Complete fabrication

The whole building from one plant, inspected before it ships

World Steel fabricates in its own plant in Tay Ninh Province, Vietnam. Built-up members are welded on automatic submerged-arc lines, shot-blasted and coated in the shop, and each piece mark gets a QR label linked to its record.

A complete package means more than the frame. Purlins, girts, roof and wall panels, trims, flashings and accessories come from the same order, so the parts are detailed to fit each other. Doors and windows are supplied through World Steel partners, and optional systems are sourced per project.

products made by World Steel
114products made by World Steel
made by World Steel partners
6made by World Steel partners
optional systems sourced per project
13optional systems sourced per project
Welder beside a deep built-up girder running through the automatic line Photo
Coated members drying in rows on stands in the paint hall Photo
  • Traceable material

    Mill test reports are logged by heat number and tied to each member in PEB Studio.

  • Witness inspections

    Hold and witness points are announced ahead; attend, send your special inspector or join by video.

  • Visible production

    Your team logs in to PEB Studio and follows its own order, with regular production reports.

  • One project manager

    A named project manager tracks drawings, approvals, production and shipping for your order.

Shipping

Packed for your erector, shipped to a US port near your site

Member lengths and splices are planned during detailing so the package fits 20 ft and 40 ft containers, flat racks or breakbulk. Bundles are grouped by area and erection sequence, separated with ISPM 15 dunnage and scanned into their container; an uninspected member cannot be packed.

Cargo sails from Cat Lai or Cai Mep to a West Coast, Gulf or East Coast port chosen with you, and inland trucking to the jobsite is coordinated with you or your broker. Each quote names the Incoterm and the importer of record. Imported steel can be subject to US duties, and schedules are confirmed at booking rather than promised up front.

Painted members strapped into bundles and stacked for the voyage Photo
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air Photo
  • Erection sequence

    The first loads to reach site carry the first columns and rafters your crew will set.

  • Locked packing list

    Frozen when the container is sealed, so your receiving check matches what was loaded.

  • Documents with the steel

    Packing lists, erection drawings and quality records travel with the building.

  • Site support

    Remote support answers erector questions against the model, and site supervision can be arranged on request.

Across the US

One process, tuned to the hazards of your region

The four stages are the same in every state. What changes is which load governs and which code edition your jurisdiction has adopted, and both are written into the design basis before engineering starts.

Hurricane and high-wind coasts

From Texas to Florida and up the Atlantic seaboard, wind uplift, components and cladding pressures and, in wind-borne debris regions, opening protection usually govern. Florida projects also follow the Florida Building Code.

Snow country

Across the northern tier, the Great Lakes and mountain states, ASCE 7-22 ground snow loads, drift at steps and parapets and rain-on-snow often size the rafters and purlins.

Seismic regions

On the West Coast, in the Intermountain West and in the New Madrid zone, the Seismic Design Category sets the permitted frame systems and whether AISC 341 detailing applies.

Clear scope

Who does what

Every contract spells out the scope. This is the typical split on a US project.

TaskWorld Steel USAYou, your engineer or your erector
Concept advice, framing system and scope letterWorld Steel USAYou sign off the brief and the site information
Design basis, calculations, submittal packageWorld Steel USAYour Engineer of Record reviews, approves and seals
Foundations and anchor rodsAnchor rod plan and base reactionsYour engineer and general contractor
Fabrication, coating and quality recordsWorld Steel USAYou or your special inspector may witness
Packing, loading and export documentsWorld Steel USAYou approve the shipment
Ocean freight, customs entry, duties and truckingPer the Incoterm and importer of record on the quotePer the Incoterm; inland trucking coordinated with you
Erection on siteErection drawings, remote support, supervision on requestYour erector or general contractor
Building permitDocuments for the submittal and plan review answersYou or your contractor apply locally

Asked by US owners and GCs

End-to-end supply: your questions

Can one company take my steel building from concept to delivery?

Yes. World Steel USA advises on the concept, designs the building to the applicable US code, fabricates it in its own plant in Vietnam and ships it to a US port. Foundations, erection, permits and inland work are handled by your local contractor unless the contract says otherwise.

Which codes do you design to?

By default IBC 2024 and ASCE 7-22, with AISC 360, AISI S100, AISC 341 where seismic detailing applies, AWS D1.1 and MBMA practice. If your jurisdiction uses another edition or your Engineer of Record sets a different basis, we follow it.

Do you have a US office or crew?

World Steel has a US office at 7302 Emerson Ave, Westminster, CA 92683, but no erection crew. Projects are run from World Steel’s engineering office and factory in Vietnam by a named project manager, using video meetings and PEB Studio. Your GC or erector builds the structure locally.

Are there import duties on the steel?

Imported steel can be subject to US duties. Each quote states the Incoterm and who is importer of record. Federal buyers should confirm any foreign-steel requirements with their contracting officer before ordering.

What do you need to prepare a quote?

Anything from architectural drawings or an IFC model to a sketch with the size, use and address of the building. One of our engineers reads it and answers with either a list of questions or a proposal for your US site.

How long does shipping take?

It depends on the carrier, the US port and the season. We confirm the schedule at booking and do not promise transit times in advance.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.