- Consulting
- System choice, scope, budget and Value Engineering
- Design basis
- IBC 2024 · ASCE 7-22 · AISC 360 · AISI S100
- Fabrication
- Own IAS AC472-accredited plant
- Delivery
- Erection-order bundles · West, Gulf and East Coast ports
One PO · one project manager
Four stages under one contract
On many US metal building jobs the owner or GC juggles a designer, a fabricator, a detailer and a freight forwarder. Here all four sit with one supplier, and every stage closes with a document you can review before the next one opens.
-
Consult
Consulting
We help settle the building type, framing system and scope while changes are still cheap.
Hands overScope letter and proposal drawings
-
Design
Demonstration data US code design
Engineered to IBC 2024, ASCE 7-22, AISC 360 and AISI S100, or your Engineer of Record’s basis.
Hands overApproved drawings, submittal set and IFC model
-
Fabricate
Complete fabrication
Primary frame, secondary steel, panels and trims made and inspected in our IAS AC472 plant.
Hands overInspected members, traceable by piece mark
-
Deliver
Shipping to a US port
Packed in erection sequence and shipped in containers or breakbulk to the port that suits your site.
You receiveLocked packing list and erection drawings
Tay Ninh factory→Cat Lai / Cai Mep→West, Gulf or East Coast port→Your jobsite
Consulting
Get the scope right before you price it
Most of a metal building’s cost is locked in by early decisions: clear span versus interior columns, eave height, roof pitch, door sizes, crane loads and the coating system. Our estimators and engineers review your request while those decisions can still move.
Send what you have, from a full architectural set or IFC model to a napkin sketch with dimensions and an address. The proposal that comes back names the framing system, the products supplied, the exclusions, the Incoterm and who acts as importer of record.
Photo
Photo
-
Framing system choice
Clear span, modular or multi-span, lean-tos, mezzanines, crane runways and canopies, matched to how the building will be used.
-
Scope across 16 building systems
Frame, roof and wall envelope, doors, windows, insulation and accessories, each marked as World Steel made, partner made or optional.
-
Value Engineering review
Tapered built-up members and repeatable connections where they reduce steel, always submitted to your Engineer of Record.
-
Exposure and durability advice
Coatings, fastener finishes and panel choices for coastal air, de-icing salt, humidity or livestock environments.
US code design
Designed to the code your building department enforces
Our default basis is the 2024 International Building Code with ASCE 7-22 loads, AISC 360 for hot-rolled and built-up steel, AISI S100 for cold-formed purlins and girts, AISC 341 where seismic detailing applies, AWS D1.1 for welding and MBMA practice for metal building systems. If your state runs an earlier IBC edition, or your Engineer of Record sets a different basis, we design to that instead and write it down before analysis begins.
Frames are analyzed in SAP2000 and modeled in Tekla Structures. You receive approval drawings, an anchor rod plan and base reactions for your foundation engineer, a submittal package for the building department, and an IFC model for BIM coordination with your architect and MEP trades.
- IBC 2024
- ASCE 7-22
- AISC 360
- AISI S100
- AISC 341
- AWS D1.1
Demonstration data
Photo
-
Wind and snow
Panels, fasteners, purlins, doors and anchorage designed as one load path for the site’s wind speed, exposure and ground snow load.
-
Seismic
Bracing and connection details chosen for the Seismic Design Category of your address.
-
IAS AC472 Part C
World Steel’s metal building design process is part of its IAS accreditation.
-
Your Engineer of Record
Calculations and drawings are prepared for your engineer, who reviews, approves and seals them for the permit.
Complete fabrication
The whole building from one plant, inspected before it ships
World Steel fabricates in its own plant in Tay Ninh Province, Vietnam. Built-up members are welded on automatic submerged-arc lines, shot-blasted and coated in the shop, and each piece mark gets a QR label linked to its record.
A complete package means more than the frame. Purlins, girts, roof and wall panels, trims, flashings and accessories come from the same order, so the parts are detailed to fit each other. Doors and windows are supplied through World Steel partners, and optional systems are sourced per project.
- products made by World Steel
- 114products made by World Steel
- made by World Steel partners
- 6made by World Steel partners
- optional systems sourced per project
- 13optional systems sourced per project
Photo
Photo
-
Traceable material
Mill test reports are logged by heat number and tied to each member in PEB Studio.
-
Witness inspections
Hold and witness points are announced ahead; attend, send your special inspector or join by video.
-
Visible production
Your team logs in to PEB Studio and follows its own order, with regular production reports.
-
One project manager
A named project manager tracks drawings, approvals, production and shipping for your order.
Shipping
Packed for your erector, shipped to a US port near your site
Member lengths and splices are planned during detailing so the package fits 20 ft and 40 ft containers, flat racks or breakbulk. Bundles are grouped by area and erection sequence, separated with ISPM 15 dunnage and scanned into their container; an uninspected member cannot be packed.
Cargo sails from Cat Lai or Cai Mep to a West Coast, Gulf or East Coast port chosen with you, and inland trucking to the jobsite is coordinated with you or your broker. Each quote names the Incoterm and the importer of record. Imported steel can be subject to US duties, and schedules are confirmed at booking rather than promised up front.
Photo
Photo
-
Erection sequence
The first loads to reach site carry the first columns and rafters your crew will set.
-
Locked packing list
Frozen when the container is sealed, so your receiving check matches what was loaded.
-
Documents with the steel
Packing lists, erection drawings and quality records travel with the building.
-
Site support
Remote support answers erector questions against the model, and site supervision can be arranged on request.
Across the US
One process, tuned to the hazards of your region
The four stages are the same in every state. What changes is which load governs and which code edition your jurisdiction has adopted, and both are written into the design basis before engineering starts.
Hurricane and high-wind coasts
From Texas to Florida and up the Atlantic seaboard, wind uplift, components and cladding pressures and, in wind-borne debris regions, opening protection usually govern. Florida projects also follow the Florida Building Code.
Snow country
Across the northern tier, the Great Lakes and mountain states, ASCE 7-22 ground snow loads, drift at steps and parapets and rain-on-snow often size the rafters and purlins.
Seismic regions
On the West Coast, in the Intermountain West and in the New Madrid zone, the Seismic Design Category sets the permitted frame systems and whether AISC 341 detailing applies.
Clear scope
Who does what
Every contract spells out the scope. This is the typical split on a US project.
| Task | World Steel USA | You, your engineer or your erector |
|---|---|---|
| Concept advice, framing system and scope letter | World Steel USA | You sign off the brief and the site information |
| Design basis, calculations, submittal package | World Steel USA | Your Engineer of Record reviews, approves and seals |
| Foundations and anchor rods | Anchor rod plan and base reactions | Your engineer and general contractor |
| Fabrication, coating and quality records | World Steel USA | You or your special inspector may witness |
| Packing, loading and export documents | World Steel USA | You approve the shipment |
| Ocean freight, customs entry, duties and trucking | Per the Incoterm and importer of record on the quote | Per the Incoterm; inland trucking coordinated with you |
| Erection on site | Erection drawings, remote support, supervision on request | Your erector or general contractor |
| Building permit | Documents for the submittal and plan review answers | You or your contractor apply locally |
Your engineer already stamped the drawings?
Buy only the stages you are missing. We check the set, fabricate to it and ship the steel to the US port that suits your site.
Delivered
Delivered under this model
140 published projects in 14 countries, with US work listed first.
Asked by US owners and GCs
End-to-end supply: your questions
Can one company take my steel building from concept to delivery?
Yes. World Steel USA advises on the concept, designs the building to the applicable US code, fabricates it in its own plant in Vietnam and ships it to a US port. Foundations, erection, permits and inland work are handled by your local contractor unless the contract says otherwise.
Which codes do you design to?
By default IBC 2024 and ASCE 7-22, with AISC 360, AISI S100, AISC 341 where seismic detailing applies, AWS D1.1 and MBMA practice. If your jurisdiction uses another edition or your Engineer of Record sets a different basis, we follow it.
Do you have a US office or crew?
World Steel has a US office at 7302 Emerson Ave, Westminster, CA 92683, but no erection crew. Projects are run from World Steel’s engineering office and factory in Vietnam by a named project manager, using video meetings and PEB Studio. Your GC or erector builds the structure locally.
Are there import duties on the steel?
Imported steel can be subject to US duties. Each quote states the Incoterm and who is importer of record. Federal buyers should confirm any foreign-steel requirements with their contracting officer before ordering.
What do you need to prepare a quote?
Anything from architectural drawings or an IFC model to a sketch with the size, use and address of the building. One of our engineers reads it and answers with either a list of questions or a proposal for your US site.
How long does shipping take?
It depends on the carrier, the US port and the season. We confirm the schedule at booking and do not promise transit times in advance.
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.