Caribbean steel designed for earthquakes and hurricanes together

Kingston in 1907, Haiti in 2010, southern Puerto Rico in 2020: the Caribbean plate moves, and many islands that see hurricanes also shake. A light steel roof is usually ruled by wind, a heavy floor or a crane building can be ruled by the earthquake, and the earthquake also sets how the frame must be detailed. We check both and design to whichever governs, member by member.

Windgoverns light roofsQuakegoverns heavy floorsAISC 341seismic detailingAWS D1.8demand-critical welds

Plate boundaries

Where the Caribbean shakes

A broad public picture of seismic hazard around the Caribbean plate. Your engineer of record sets the design values for the site from the island's code.

Northern boundary

Jamaica, Haiti, Dominican Republic

Strike-slip faults along the north of the plate; the 1907 Kingston and 2010 Haiti earthquakes.

Puerto Rico and Virgin Islands

Puerto Rico, USVI, BVI

Trench and faults north and south of the islands; the 2020 sequence in southern Puerto Rico.

Lesser Antilles arc

Leeward and Windward islands

Subduction under the island arc, with volcanoes from Montserrat to St Vincent.

Southern boundary

Trinidad and Tobago

Faults where the plate slides past South America.

Cayman Trough

Cayman Islands, west of Jamaica

Spreading and strike-slip zone; the 2020 M7.7 earthquake between Jamaica and Cuba.

Stable platform

The Bahamas, Turks and Caicos, Guyana, Suriname

Low seismic hazard; wind and salt lead the design.

Which load governs

Light buildings follow the wind, heavy ones the ground

Wind load depends on the area the building shows to the wind. Earthquake load depends on the mass the building carries. The lighter and larger the building, the more wind wins.

Wind governs

Warehouse with a metal roof

Light roof, tall walls, big area: wind governs frames, purlins, bracing and anchor bolts.

Earthquake governs

Resort block with concrete floors

Heavy floors on a steel frame: earthquake often governs the bracing and columns.

Both checked

Crane building or plant

Crane and equipment mass with large walls: both checked, and the crane case added.

Both checked

Shelter or hospital

Highest risk category for both hazards; the frame must stay usable after either event.

Frame systems

Frames that answer both hazards

Concentrically braced frames

Rods or tubes in X, V or chevron patterns; efficient for wind, detailed as special or ordinary braced frames for seismic duty.

Moment frames

Open bays without bracing; prequalified connections where the seismic system demands them.

Seismic detailing

Designed to AISC 341 where required, with demand-critical welds to AWS D1.8 by qualified welders and procedures.

Connections for reversal

Both hazards reverse the load. Bolted connections are sized for the worst direction of each.

What your inspector gets from our plant

Seismic frames are only as good as their welds and their steel. These are in place in our plant for jobs that need them.

  • AWS D1.8-qualified welding procedures and welders in our plant
  • Mill certificates to EN 10204 3.1 with Charpy values on request
  • Protected zones marked on the steel where the design calls for them
  • Remote access for your inspector during fabrication

Welding in our plant

Heavy members, checked welds

Real World Steel photos from our plant in Vietnam. None is shown as a Caribbean site.

Welder looking over the stiffeners and end plate of a heavy column
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Stiffened heavy plate girders resting on shop supports
Crew assembling a large steel truss on the shop floor

Questions

Questions on earthquakes and hurricanes

Which Caribbean islands need seismic design?

Most islands on the plate boundaries: Jamaica, Haiti, the Dominican Republic, Puerto Rico, the Virgin Islands, the Leeward and Windward arc and Trinidad and Tobago. The Bahamas, Turks and Caicos, Guyana and Suriname have low seismic hazard. Your engineer of record sets the values for the site.

If wind governs, can seismic detailing be skipped?

Not always. Where the code places the building in a higher seismic design category, the frame must still follow the seismic detailing rules even if wind sets the member sizes.

Do you design to AISC 341?

Yes, where the seismic system requires it. Our plant has AWS D1.8-qualified welding procedures and welders for demand-critical welds, and we mark protected zones when the design calls for them.

Is steel a good choice for both hazards?

Steel is light, so earthquake forces are lower than for a heavy structure, and ductile, so it bends instead of breaking. Designed for the wind as well, it handles both hazards well.

Who sets the seismic values?

Your engineer of record, from the code the island uses. We state the values in the calculations and design the steel to them.

On an island that blows and shakes?

Send the drawings and the site. We check wind and earthquake cases with your engineer of record, detail the frame to the governing case and fabricate it in our plant with the welding records your inspector needs.