Products · Multi-storey steel framing

Multi-storey steel framing, delivered piece by piece, ready to bolt

The columns, girders, floor beams, braces and connections that hold up a two-storey office or a mid-rise building. World Steel details every piece in one Tekla model, fabricates it in our own IAS AC472-accredited plant in Vietnam and ships it to your US port in the order your crew will set it.

World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, and 100% of the steel comes from mills in Vietnam. Westminster, California is our US office, not a plant. We supply the steel; your US contractor, our customer, erects it.

Mobile crane lifting a member into a multi-story steel frame

Real photo: World Steel’s own multi-storey office going up beside our plant in Vietnam.

Proof of capacity

The frames on this page are frames we have already made

11
multi-storey steel frames on record
1,500 t
of steel in one phase of one tower job (Tongwei Tien Giang)
2,500 t
of structural steel a month from our own plant in Vietnam
2 plants
for one repeat customer, Haid Group
See all 11 multi-storey projects
Product data sheetQuoted per project · no stock sizes or prices
Made in
World Steel’s own plant, Tay Ninh Province, Vietnam
Members
W-shape and built-up columns, girders, composite beams, braces
Design and detailing
AISC 360, AISC 341 where the seismic system needs it
Shop welding
AWS D1.1, with AWS D1.8 for seismic welds
Site connections
Bolted to the RCSC Specification wherever the design allows
Materials
ASTM grades, mainly Vietnamese mills, 3.1 certificates by heat
Tracking
Every piece mark live in PEB Studio
Scope
Steel supply only; erection by the US contractor

What you are buying

Eight member families make up the frame

Pick a family to see where it sits in a typical frame, which sections we use and what arrives already welded on. Every piece is detailed for your building; there is no stock size list.

Elevation of a four-level steel frame Columns on base plates spliced above the second floor, girders at each level with floor beams framing in, a braced bay on the right, a moment frame bay on the left, a stair in the second bay, slab edges, and equipment framing on the roof. The selected member family is drawn in red. TIER 1 TIER 2 BASE PLATES ON ANCHOR RODS SPLICES ABOUT 1.2 M (4 FT) ABOVE FLOOR

Columns

Carry every floor down to the foundation and set the grid the whole building follows.

Typical sections
W-shapes to ASTM A992, or built-up I-sections welded from ASTM A572 Grade 50 plate when the load or size calls for it.
Arrives already attached
Base plates, cap plates, splice plates, beam seats and shear tabs, erection aids and safety cable holes on perimeter columns.
Product details

Girders and transfer girders

Collect the floor beams and take their load to the columns; a transfer girder picks up a column that stops above an open space.

Typical sections
Rolled W-shapes for typical bays; deep built-up plate girders for transfers and long spans.
Arrives already attached
Shear tabs, stiffeners at concentrated loads, web openings for services where the design allows them.
Product details

Composite floor beams

Act with the concrete slab on metal deck through shear studs, so the floor can be shallower and lighter.

Typical sections
Rolled W-shapes, cambered in the shop where your engineer specifies camber.
Arrives already attached
Coped ends, end connections, camber, and the stud layout marked on the drawings for installation on site.
Product details

Braced frames

Diagonal members in chosen bays that carry wind and earthquake load to the foundation.

Typical sections
HSS or W-shape braces with gusset plates; special concentrically braced frames detailed to AISC 341.
Arrives already attached
Gusset plates welded to beams and columns, brace slots and end plates, protected zones marked where required.
Product details

Moment frames

Rigid beam-to-column joints that resist sideways load by bending, leaving the bay open for storefronts and lobbies.

Typical sections
Deeper W-shape beams and heavier columns, with connections from AISC 358 when the seismic system needs prequalified details.
Arrives already attached
Continuity plates, doubler plates, end plates, bevels and weld access holes prepared for any field welds.
Product details

Edge angles and pour stops

Form the slab edge, support the deck at columns and openings, and give the curtain wall a line to attach to.

Typical sections
Bent plate and angles sized to the slab thickness and edge loads on your drawings.
Arrives already attached
Shop-welded or bolted to the spandrel beams, set to the slab edge dimension on the drawings.
Product details

Stairs and shaft framing

Stair towers, landings and the framing that boxes in elevator hoistways and shafts.

Typical sections
Channel or plate stringers, landing beams and hoistway support members.
Arrives already attached
Treads, landing frames, handrail and guardrail posts, and hoistway divider beams.
Product details

Roof and equipment framing

Roof beams, rooftop equipment dunnage and screen wall posts above the top floor.

Typical sections
W-shapes, channels and HSS sized for the roof loads and the equipment weights you send.
Arrives already attached
Curb support angles, dunnage frames and screen post base plates.
Product details

Connection library

Welded in our shop, bolted on your site

A multi-storey frame repeats a small set of connections hundreds of times. Here is each one, split into what we do in the plant and what the contractor does in the field.

Single-plate shear connections

Beam to column and girder to column on gravity framing; the most repeated connection in the building.

In our plantShear tab welded to the column or girder, holes drilled to the shop drawing.

On site, by the contractorBeam set on the tab and bolted.

Designed to: AISC 360 Chapter J · RCSC

Beam-to-girder connections

Infill floor beams framing into girders, with coped flanges where the tops align.

In our plantCopes cut, tabs or clip angles attached, holes drilled.

On site, by the contractorBolted as each bay is set.

Designed to: AISC 360 Chapter J · RCSC

Bolted end-plate moment connections

Moment frames for wind, and seismic frames where an end-plate connection is prequalified.

In our plantEnd plate welded to the beam with stiffeners; column continuity plates fitted.

On site, by the contractorPretensioned high-strength bolts installed and inspected.

Designed to: AISC Design Guides 4 and 16 · AISC 358 · RCSC

Field-welded moment connections

Seismic moment frames where your engineer selects a welded prequalified connection such as a reduced beam section.

In our plantFlange cuts, bevels, weld access holes, backing and shear tabs prepared; protected zones marked.

On site, by the contractorComplete-joint-penetration flange welds made by the contractor’s certified welders, then inspected.

Designed to: AISC 358 · AISC 341 · AWS D1.8

Column splices

Joining column tiers above a floor, as bolted flange and web splice plates.

In our plantSplice plates attached to the lower tier; ends finished where bearing is specified.

On site, by the contractorUpper tier landed and bolted.

Designed to: AISC 360 · AISC Code of Standard Practice

Base plates and anchor rods

Where every column meets the foundation.

In our plantBase plate welded, holes and shear lug if required, anchor rod plan issued early.

On site, by the contractorAnchor rods cast in, leveling, grout and column set.

Designed to: AISC Design Guide 1 · ASTM F1554

Brace gussets

Where braces meet the beam-column joint or the middle of a beam in chevron bracing.

In our plantGussets welded to beams and columns; brace ends slotted or plated.

On site, by the contractorBraces bolted into the gussets.

Designed to: AISC Design Guide 29 · AISC 341

Embeds and concrete interfaces

Steel beams landing on a concrete core, podium or shear wall.

In our plantEmbed plates with headed studs supplied for the concrete contractor; matching beam seats on the steel.

On site, by the contractorEmbeds cast in place; beams bolted or welded to them as detailed.

Designed to: AISC 360 · ACI 318 by your engineer

Column tiers and splices

Planned in the model before the first plate is cut

A multi-storey column is not one piece. It is a stack of tiers, each usually two storeys tall, joined by splices just above a floor. Where those splices sit, how heavy each tier is and how long it runs decide how fast the frame goes up, how many crane picks it takes and whether the pieces fit a 40-foot container.

We plan the tiers in the Tekla model before any steel is ordered, with your Engineer of Record and the contractor’s erection team, and then draw every splice, seat and erection aid so the crew finds the frame already planned for them when it arrives.

  • Splices at working height

    About 1.2 m (4 ft) above the finished floor, clear of the beam connections below.

  • Tiers sized for the container

    Two storeys per tier for most buildings, checked against the 12 m (39 ft 5 in) inside length of a 40-foot container.

  • Weight per pick

    Tier weights listed on the erection drawings so the contractor can plan crane capacity.

  • Elevations that add up

    Splice and seat elevations taken from one model, so floor levels hold from the base plate to the roof.

Column tiers inside a container Left: a column made of two tiers, each two storeys tall, joined by a bolted splice about 1.2 metres above the third floor. Right: a 40-foot container with the tiers laid inside its 12 metre length. GROUND LEVEL 2 LEVEL 3 LEVEL 4 ROOF 1.2 M (4 FT) TIER 1 · 2 STOREYS TIER 2 · 2 STOREYS 40 FT CONTAINERABOUT 12 M INSIDE
Diagram for illustration, not to scale. Tier lengths and splice levels come from the model for your building.

Detailed with US erection safety in mind

OSHA Subpart R items drawn into every set of shop drawings

The erection plan and site safety are the contractor’s. What we can do is detail the steel so the crew gets what the federal steel erection rule expects.

  • Four anchor rods per columnEvery column is detailed with at least four anchor rods, as OSHA 1926.755(a) requires.
  • Double connections kept safeWhere two beams share a bolt line through a column web, a seat or clip holds the first beam while the second is fitted (OSHA 1926.756(c)).
  • Perimeter safety cablePerimeter columns extend 1,219 mm (48 in) above the floor with holes or attachments for safety cables at 1,067 to 1,143 mm (42 to 45 in) (OSHA 1926.756(e)).
  • Clear top flangesNo shear studs shipped on top flanges, so they are installed through the deck after it is down (OSHA 1926.754(c)).

Made in our own plant in Vietnam

How a multi-storey frame is made, piece by piece

Every column, girder and brace for a US job is cut, welded, checked and coated in World Steel’s plant in Tay Ninh Province under our IAS AC472 accreditation. Tap a photo to enlarge it.

  • Plate and coil strip racked by grade and heat number in the store Photo

    Steel traced by heat

    Shapes and plate from mills in Vietnam are checked against their 3.1 certificates and stored by grade and heat number, so every column can be traced to its mill.

  • Shop worker taking a measurement on a steel plate in the yard Photo

    Plates cut and drilled by CNC

    Shear tabs, gussets, splice and base plates are cut and drilled straight from the Tekla files, so the hole patterns match the drawings piece for piece.

  • Welder beside a deep built-up girder running through the automatic line Photo

    Built-up columns and transfer girders

    Heavy columns and deep girders are welded from plate on our automatic submerged arc lines when a rolled shape is not the best fit.

  • Fitter comparing a built-up beam with its shop drawing Photo

    Fit-up to the shop drawing

    Seats, tabs, continuity plates and splice plates are tacked in place and checked against the drawing before final welding.

  • Welder looking over the stiffeners and end plate of a heavy column Photo

    Welds by qualified welders

    Every weld follows a written procedure, made by welders qualified to AWS D1.1, and to AWS D1.8 for the seismic force-resisting system.

  • Quality inspector taking dimensions on a finished steel member Photo

    Dimensional release

    QC checks length, camber, sweep and hole positions on each piece and logs the result against its piece mark before it moves on.

  • Primed column with its bolted end plate set on painting stands Photo

    Blast and coat

    Members are shot blasted and primed with a system compatible with your fireproofing; slip-critical faying surfaces are masked or coated as specified.

  • Gray members stacked and strapped together on a packing rack Photo

    Bundled by tier

    Finished pieces are tagged, bundled in erection sequence and staged by tier, ready for the container or flat rack.

Photos: World Steel plant, Vietnam. No steel is fabricated in the US.

Tolerances

Small errors stack up over many floors, so we measure them

A column that is long by a few millimetres on the second floor is a floor out of level by the fifth. These are the published shop tolerances we fabricate to, unless your specification is tighter.

CheckRequirement we fabricate toReferenceHow it is checked
Length, ends finished for contact bearing±1 mm (1/32 in)AISC Code of Standard PracticeMeasured on every column tier with a bearing splice
Length, members framed to other steel±2 mm (1/16 in) up to 9 m (30 ft); ±3 mm (1/8 in) over 9 mAISC Code of Standard PracticeTape and square on each piece, recorded by piece mark
Column straightness1/1000 of the length between lateral supportsAISC Code of Standard Practice · ASTM A6String line or laser along both axes
Specified beam camber−0 / +13 mm (+1/2 in) on members up to 15 m (50 ft)AISC Code of Standard PracticeMeasured at midspan with the beam laid flat
Bolt holesStandard holes 2 mm (1/16 in) larger than the bolt, at drawing positionsAISC 360 Table J3.3Gauge and template check against the shop drawing
WeldsVisual acceptance of every weld; UT, MT or PT to the extent your specification setsAWS D1.1 · AWS D1.8Inspection and NDT reports by piece mark
Coating thicknessDry film thickness to the specified systemSSPC-PA 2Gauge readings recorded per lot

Your submittal binder

Records for every piece mark, ready for review

Plan reviewers and special inspectors ask for paper. You get it for each column, girder and brace, filed the way a US submittal expects, and online in PEB Studio.

  • EN 10204 3.1 mill certificates matched to each piece by heat number, with Charpy values where your specification asks for them.
  • Welding procedure specifications and qualification records, and welder qualification records for AWS D1.1, plus AWS D1.8 for seismic welds.
  • Visual and NDT reports, dimensional reports and QC releases for every piece mark.
  • ASTM F3125 bolt, nut and washer certificates by lot when the bolts are in our supply.
  • Surface preparation and dry film thickness records, with the faying surface treatment for slip-critical joints.
  • Approval drawings, shop drawings, anchor rod plan, column schedule, framing plans by level and the Tekla model or IFC on request.
  • Protected zones marked on the members and demand-critical weld records where AISC 341 applies, with Charpy values as specified.
  • Packing lists by tier and container, loading photos and the piece mark QR tags.

PEB Studio · real-time tracking

Open any piece mark from the US and see its whole history

Find a column in the 3D model, open its digital passport with heat numbers, welds and checks, and on site scan its QR tag to see where it goes. Screens use demonstration data.

PEB Studio digital passport for a steel member with engineering, shop and logistics data (demonstration data) Demonstration data

Passport

Scan the label, read the member’s history

The QR label opens a read-only passport with identification, drawings, shop stages, bundle, container and site status. Reading it needs no login, and the code itself stores no data.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Vietnam to your US port

Packed in the order it goes up

The first container to open on site holds the first tier to set. Every bundle carries a packing list keyed to the erection drawings.

  1. Early lot

    Anchor rods, templates and base plates, when agreed, so foundations are ready first.

  2. Tier one

    Ground-level columns with their braces, girders and floor beams for the first levels.

  3. Tier two and up

    Each next tier with its framing, packed so the top of a container holds what goes up first.

  4. Roof and finishing steel

    Roof framing, dunnage, stairs, edge angles and loose bolts by connection type.

Clear responsibilities

Who does what on a multi-storey steel job

World Steel designs, fabricates and supplies the steel structure. The US contractor, our customer, erects it; the Engineer of Record and the building official approve it.

TaskWorld SteelUS contractor, our customerEngineer of Record and building official
Design criteria and loads ——Sets them
Member and connection design Designs, or details your engineer’s design—Reviews and approves
Calculations and approval drawings Prepares for review—Reviews and approves
PE seal and permit submittal —Through their engineerPermit decision by the building official
Shop drawings and Tekla model Included at no extra chargeReviews for fit and erectionReviews as the contract sets
Fabrication, shop welding and QC In our plant in Vietnam——
In-plant inspection Hosts it, in person or by live videoMay witnessSpecial inspector may witness
Shipping to the US port Under the Incoterm in the quoteInland delivery as agreed—
Anchor rods cast in, erection, bolting —Their scopeField inspection
Deck, shear studs and any field welds Drawn on our drawingsTheir scopeField inspection

How to order

What to send, and what you get back

Send us

  • Structural framing plans and column schedule, or architectural plans if design is not started
  • Member sizes, typical details and connection forces from your Engineer of Record
  • Floor-to-floor heights, slab thickness and deck type
  • Lateral system, Seismic Design Category and any AISC 341 requirements
  • Coating, fireproofing and special inspection requirements
  • Site address and the US port you want the steel delivered to

You receive

  • A written scope of every member family and connection type we supply
  • The code basis and the connection design responsibility in writing
  • Proposed column tiers and splice levels, checked against container lengths
  • The list of records you receive with the steel
  • The delivery basis under your chosen Incoterm
  • Any Value Engineering options, offered in writing for your engineer to decide

No prices or standard sizes are published: every frame is detailed and quoted for its own building.

Frame register

Multi-storey steel frames we have made, photographed bare

Every frame below was designed, fabricated and supplied by World Steel from our own plant in Vietnam, which makes 2,500 t of structural steel a month. The photos show the skeleton before cladding, so you can see the members, bracing and floors you would be buying. Projects outside the US are shown for the structure type, not as US sites.

Red-primed multi-storey steel tower frame of the Haid Vinh Long feed factory with diagonal bracing on every face Photo
Feed mill process tower

Haid Vinh Long feed factory

Where
Vinh Long Province, Vietnam
Year
2024

Red-primed columns and beams with diagonal bracing on every face, metal deck on the floors, next to the plant it serves.

Open the project
Welded box columns and plate girders for the New Hope Dong Nai feed factory on the shop floor of World Steel’s plant in Vietnam Photo
Box columns for a feed factory

New Hope Dong Nai feed factory

Where
Chon Thanh, Vietnam
Year
2026

Welded box columns with bolted connection plates and plate girders, laid out on our shop floor before blasting and painting.

Open the project
Red-primed multi-storey steel frame of the World Steel office in Tay Ninh with floor beams, metal deck and steel stairs Photo
Office building

World Steel office, Tay Ninh

Where
Tay Ninh Province, Vietnam
Year
2023

Our own office: red-primed columns, floor beams, metal deck and steel stairs, framed beside the plant that made them.

Open the project
Dark multi-storey steel frame at the Nam Long Warehouse with metal deck on every floor, seen from below Photo
Multi-storey frame beside a warehouse

Nam Long Warehouse

Where
Tay Ninh Province, Vietnam
Year
2019

Columns and floor beams with metal deck on every level, bolted splices visible on the columns.

Open the project
Aerial view of the multi-storey Nitto Denko factory in Ho Chi Minh City under construction, wrapped in scaffolding and safety net, with a tower crane Photo
Multi-storey factory

Nitto Denko factory

Where
Ho Chi Minh City, Vietnam
Year
2023

A large multi-storey factory block under construction, wrapped in scaffolding and safety net, with a tower crane on site.

Open the project

In our plant

Box columns for the New Hope feed factory, before they ship

Welded box columns with the beam connection plates already on: every weld made in the shop, every bolt hole drilled to the shop drawing, then blast cleaned and painted. This is the multi-storey column work the frames above stand on.

See the New Hope project
Welded box columns and plate girders laid out on the shop floor of World Steel’s plant for the New Hope Dong Nai feed factory Rows of welded box columns with connection plates for the New Hope feed factory, a welder working beyond them Box column ends with stiffener plates and bolted beam connection plates, New Hope feed factory steel in fabrication Close view of two welded box columns with bolted shear tabs and cap plates for the New Hope feed factory Box columns with gusset tabs welded on, waiting for blasting in World Steel’s plant in Vietnam Box column end plate with anchor holes and a quality-control sticker, New Hope feed factory Square hollow sections 400 mm by 14 mm cut to length for New Hope feed factory box columns Blast-cleaned welded box column with bolted connection plates, ready for painting, New Hope feed factory

Buying steel from outside the US

Buying a multi-storey frame from outside the US?

These are the questions US contractors ask first. Each one is answered in full, with proof, on our multi-story buildings page.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

Asked by US engineers, detailers and erectors

Multi-storey framing questions and answers

12 technical answers on ordering, connections, tiers and records. Building-level questions are on the multi-story buildings page.

Specifying and ordering the frame 3 answers

Can you fabricate from our Engineer of Record’s framing plans alone?

Yes. Framing plans, column schedules, member sizes and typical connection details are enough for us to model the frame in Tekla Structures, detail every piece and return shop drawings for approval. Where a connection is not shown, we design it to the forces on the drawings and send the calculation with the shop drawings.

Who designs the connections on a multi-storey frame?

That is set in your contract documents, following the AISC Code of Standard Practice. Either your Engineer of Record designs the connections and we detail them, or our engineers design them from the reactions on your drawings and send calculations for the Engineer of Record’s review and approval. If your specification calls for a sealed delegated connection design, the seal is provided by the US contractor’s engineer, not by World Steel.

Which steel grades do you supply for multi-storey members?

Wide-flange shapes to ASTM A992, plate to ASTM A572 Grade 50 or A36, and hollow sections to the ASTM grade your drawings name, all from mills in Vietnam with EN 10204 3.1 certificates traced to each piece by heat number. Charpy impact values for heavy sections or seismic members are tested and reported when your specification asks for them.

Connections and bolting 3 answers

Can field welding be avoided completely?

On most braced and gravity frames, yes: every weld is made in our plant and the frame bolts together on site. Some seismic moment connections prequalified in AISC 358 need complete-joint-penetration flange welds made in place; there we prepare the bevels, weld access holes and backing in the shop, and the contractor’s certified welders make the field welds.

Do you supply the structural bolts?

Yes, as an option. ASTM F3125 bolts with matching nuts and washers are packed by connection type with their certificates, so the erector has the right assemblies at each level. Installation, pretensioning and the inspection of field bolting are the contractor’s scope under the RCSC Specification.

How do you treat faying surfaces of slip-critical joints?

Faying surfaces are masked and left bare, or coated with a primer qualified as Class A or Class B under the RCSC Specification, exactly as your drawings specify. The treatment is shown on the shop drawings and recorded in the coating report.

Column tiers, splices and floors 3 answers

Where do you put the column splices?

Typically about 1.2 m (4 ft) above the finished floor, every second level, which keeps the splice clear of the beam connections and at a comfortable working height for the erection crew. Splice locations are confirmed with your Engineer of Record and the contractor before detailing.

Why do the beams arrive without shear studs?

Because US erection rules keep shear studs off the top flanges until the deck is in place (OSHA 1926.754(c)), so the flanges are safe to walk. We show the stud layout and any camber on the drawings, and the studs are welded through the deck on site by the contractor.

How long can a column tier be?

Tier lengths are planned against the inside length of a 40-foot container, about 12 m (39 ft 5 in), which suits two storeys of most office and school buildings. Longer or heavier pieces are planned as flat rack or breakbulk cargo before detailing starts.

Records, inspection and delivery 3 answers

What does the foundation contractor get before the steel arrives?

An anchor rod plan with column base elevations and rod projections comes first, and anchor rods, setting templates and base plates can travel in an early lot when that is agreed in the quote, so foundations are ready when the frame lands.

Can our special inspector review the steel in the plant?

Yes. Hold points are agreed in advance, and your inspector or owner’s representative can witness them in our plant in Vietnam or remotely over live video, with the inspection records and photos logged against each piece mark in PEB Studio.

How is a frame packed so that it goes up level by level?

Members are bundled by erection sequence, tier by tier, and every bundle and container has a packing list keyed to the erection drawings. The piece mark is painted on and carried on a QR tag, so the crew can find any column, girder or brace in the laydown area.

US codes and standards we design and fabricate to

Talk to a detailer or engineer

Send the framing plans. We send back the tiers, the connections and the scope.

Our engineers and project managers work in English and answer on WhatsApp too.

Pricing the steel for a multi-storey building?

Send the framing plans or the architect’s set. We detail the frame in one model, make it in our plant in Vietnam and ship it to your US port in erection order.