Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Gate of the World Steel plant with the office block and two of its fabrication halls

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Contact World Steel USA

Let’s build your next US project

Our office in Westminster, California answers US owners, contractors, dealers and engineers. Your steel is engineered and fabricated in our own plant in Vietnam, the first and only fabricator there accredited under IAS AC472, and shipped to the US port that suits your job.

Westminster, California

Plant & engineering, Vietnam

Vietnam is 14 or 15 hours ahead of California, depending on daylight saving time. Tell us your time zone and we schedule calls inside your working day.

  • Email

    Drawings, questions and quote requests, read by our sales and engineering team.

    dang.victor@worldsteelgroup.com
  • Phone & WhatsApp

    International calls reach our head office in Vietnam. Ask for a call in your US time zone.

    +84 902 881 833 WhatsApp +84 902 881 833
  • Video call

    Walk through drawings with an engineer on Zoom or Microsoft Teams, or watch an inspection live at the plant.

    Ask for a call
  • US office

    7302 Emerson Ave, Westminster, CA 92683, USA. Sales and coordination only: every building is made in Vietnam.

    Open in Google Maps

Send us a message

Tell us about your project

A few lines are enough to start. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.

Who reads your message

Your World Steel USA sales team

Six people answer US contractors, owners and engineers. Write to us through the form above and the right person picks up your message.

Meet the full team

One team, two countries

An office in California, a plant in Vietnam

You talk to World Steel USA in the United States. Your steel is engineered, fabricated, inspected and packed by the same company in Vietnam, then shipped to your US gateway port, and you follow every step in real time in PEB Studio.

  • United States

    US office

    7302 Emerson Ave, Westminster, CA 92683, USA

    Quotes, coordination and support for US buyers. No fabrication in the United States.

    Directions
  • Vietnam

    Head office & engineering

    55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

    Design to US codes in SAP2000 and Tekla Structures, project management and the PEB Studio platform.

    +84 902 881 833
  • Vietnam

    Plant, IAS AC472 accredited

    Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam

    Fabrication, QC, painting and export packing. Visits and witnessed inspections by arrangement.

    Tour the plant

Getting here

Coming to see us in Vietnam?

Two short drives take you from the runway to the shop floor. Step-by-step directions with photos of each stop.

Book a plant visit

Before you write

Questions US buyers ask first

Is there a US phone number?

Not yet. World Steel USA answers by email, through the form on this page, and on calls placed to our head office in Vietnam. Tell us when you are free and in which time zone, and we set up a phone or video call that suits your working day.

Where is my building made?

In World Steel’s own plant at Hai Son Industrial Park, Tay Ninh Province, Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472. The steel comes mainly from mills in Vietnam. The Westminster, California office handles quotes and coordination; nothing is fabricated in the United States.

Can I visit the plant or watch an inspection?

Yes. You can witness hold points in person at the plant, send a third-party inspector, or join an inspection live on Zoom or Microsoft Teams with a recording afterward. Pick “Visiting the plant or witnessing QC” in the form and say what you would like to see.

Do you publish prices?

No. Every steel building is engineered for its site and code basis, so each quote is written for its project. Send a footprint, drawings or a sketch and the site address, and you receive a scope of supply with the price, the Incoterm and the US gateway port we suggest.

What should I send with my first message?

The site address or at least the state, what the building is for, a rough size in meters or feet, and any drawings you already have. Files up to 50 MB each can be attached to the form.

Made in Vietnam. Shipped to your US port.

Send a footprint, a sketch or a full drawing set with your site address. You get a technical review and a scope of supply for the frame and the freight.