North Carolina · Food and cold storage
Steel for North Carolina’s food plants and cold stores
Eastern North Carolina is one of the biggest pork and poultry regions in the US and the leading producer of sweet potatoes, and food plants line the Piedmont from Charlotte to the Triad. Refrigerated cargo moves through Wilmington. These buildings wash down daily, run cold and humid, and need steel and envelopes built for those conditions.
- Market
- Eastern NC, the Piedmont, Wilmington
- Rooms
- Washdown, chilled, frozen, curing
- Envelope
- Insulated panels, sealed joints
- Coatings
- Galvanizing or epoxy where wet
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to Wilmington, Norfolk or Charleston.
Why it matters
Cold, wet and clean
A meat or poultry plant combines chilled processing floors washed down every shift, freezers, dry packaging and offices under one roof. Sweet potato storage needs curing rooms held warm and humid, then long cool storage. Each room has its own temperature, humidity and cleaning regime, and the steel and envelope must suit all of them.
In the coastal plain these buildings also face hurricane wind, and many sit on flat sites near flood zones. We frame for the refrigeration equipment, the insulated envelope and the wind as one design.
What we fabricate
Steel for North Carolina food buildings
Insulated envelopes
Insulated metal panels for walls, roofs and internal partitions, with sealed joints.
Washdown coatings
Hot-dip galvanizing or epoxy systems where steel is exposed to daily cleaning.
Refrigeration supports
Framing for evaporators, condensers and roof-mounted refrigeration equipment.
Tall racked cold stores
Clear-span frames for high-bay cold stores with racking loads coordinated.
Curing and storage rooms
Insulated storage buildings for sweet potatoes, produce and grain.
Condensation control
Vapor control layers and details at every penetration.
What we do not claim
We name no food or farm company as a World Steel customer and claim no federal food-safety approval for a building. Food-safety design is set by the owner’s team; we fabricate the steel and envelope to the approved design.
North Carolina ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · North Carolina contractors
North Carolina contractors: let’s win the next project together
If your next bid involves food and cold storage, World Steel wants to be your long-term, win-win steel partner in North Carolina. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your North Carolina project is cut, welded, inspected and packed.
Q&A
What North Carolina buyers ask
Can you supply the insulated panels with the frame?
Yes. We supply frames with insulated roof and wall panels, partitions and trims as one package, or the frame alone if your panels come from elsewhere.
Which coating suits a washdown room?
Usually hot-dip galvanizing or an epoxy system on exposed steel, following your specification and the cleaning chemicals used.
Do you have cold storage experience?
Yes. New Era cold storage in Vietnam, about 1,000 t of World Steel steel, is one of our reference projects.
Official sources: NC Department of Agriculture and Consumer Services
North Carolina solutions
Every North Carolina guide
Related pages
Code facts on this page summarize North Carolina rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in North Carolina?
Send the drawings or the site address, size and use. We set the North Carolina design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.