Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

West Coast · California

Steel buildings shipped to the Port of Los Angeles

The San Pedro Bay gateway is the shortest ocean leg from our plant in Vietnam to the US mainland. Your frame, cladding and bolts arrive in containers sorted by erection sequence, clear customs at Los Angeles and move inland by the Alameda Corridor or by truck.

Channel depth
16.2 m (53 ft) main channel
Rail
UP and BNSF via the Alameda Corridor
Ocean route
Direct across the Pacific
Our plant → Los AngelesWest Coast
Illustrative sea route from the World Steel plant in Vietnam to the Port of Los Angeles, across the Pacific. World Steel plant · Vietnam Los Angeles
  • Made in our IAS AC472 plant, Vietnam
  • Port of Los Angeles
  • Illustrative route; set per booking
Location
San Pedro, California
Port authority
Port of Los Angeles (City of Los Angeles Harbor Department)
Highways
I-110, I-710, SR-47, I-405

Made in Vietnam, landed at Los Angeles

Why ship your building through Los Angeles

The Port of Los Angeles sits on San Pedro Bay next to the Port of Long Beach, and the two together form the busiest container gateway in the country. Transpacific services from southern Vietnam call here directly, which is why Los Angeles is the default discharge port we quote for jobs in Southern California and the desert Southwest.

Everything in the shipment is made in World Steel’s own plant in Vietnam: primary frames, secondary members, roof and wall panels, trims and fasteners, from steel sourced mainly from mills in Vietnam. Containers are loaded at Cat Lai or Cai Mep and discharged at a Los Angeles terminal for your customs broker to clear.

  • One package, one plant

    Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.

  • Accredited fabrication

    World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.

  • Designed to US codes

    IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.

  • Packed for this port

    Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.

Port facts

Terminals, channel and connections at Los Angeles

Channel

16.2 m (53 ft) main channel

Rail

UP and BNSF via the Alameda Corridor

Highways

I-110, I-710, SR-47, I-405

TerminalWhere / operatorCargo
APM Terminals PacificPier 400, Berths 401–406Containers
Fenix Marine ServicesPier 300, Berths 302–305Containers
TraPacBerths 136–147, WilmingtonContainers
Yusen TerminalsBerths 212–225, Terminal IslandContainers
EverportBerths 226–236, Terminal IslandContainers
West Basin Container TerminalBerths 100–103 and 121–127Containers
Pasha Stevedoring & TerminalsBreakbulk at Berths 206–209; steel handling with on-dock rail at Berths 174–181Breakbulk

Source: Port of Los Angeles: container terminals, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.

From our plant to Los Angeles

How your steel gets here

Direct transpacific service from Cai Mep or Cat Lai, across the North Pacific to San Pedro Bay. No canal transit is involved.

Your shipment to Los Angeles, leg by leg

Run the full simulation →
Our plantTay Ninh, Vietnam

By road

About 2 hours

World Steel pays

Cai Mep / Cat LaiPort of loading

By sea

≈ 7,100 nmi illustrative lane

Split between us

Los AngelesSan Pedro, California

Customs, truck or rail

Planned with your trucker

You pay

Your siteErected by the US contractor
Under FOB explained

Risk passes to you when the steel is on board the vessel at the named Vietnamese port.

Inland reach

Where steel goes from Los Angeles

Containers clear the terminal and either dray to a transload yard, where steel is moved onto flatbeds, or ride the Alameda Corridor to the UP and BNSF rail yards for longer hauls. Most Southern California sites take containers or flatbeds straight from the harbor.

Map of the United States with the Port of Los Angeles, California highlighted, and the states it also serves: Arizona, Nevada, Utah and New Mexico. AZ NM CA UT NV
Port stateAlso served from Los AngelesPort of Los Angeles

Designed for the region

Site conditions we design for around Los Angeles

Seismic Design

Coastal Southern California is mostly Seismic Design Category D or higher, so bracing and connections are detailed to AISC 341 where required.

How we design for it

Coastal Corrosion Protection

Sites near the harbor see salt air; coating systems are chosen for the exposure.

How we design for it

Energy Code Building Envelopes

California Title 24 energy rules shape insulation and roof finish choices.

How we design for it

On arrival

Receiving your steel at Los Angeles

Book drayage early

Terminal appointment systems govern pickups. Give your trucker the booking as soon as we forward it.

Plan for California truck rules

California Air Resources Board rules apply to drayage trucks serving the ports; use a compliant carrier.

Match containers to the crane day

PEB Studio shows which containers carry which erection step, so you can pull them in order.

Documents sent ahead to your broker

  • Commercial invoice and packing list per container
  • Bill of lading and certificate of origin
  • Container packing report with seal number and VGM
  • EN 10204 3.1 mill certificates
  • Shipping marks with a QR link to each member’s passport

What the quote states for Los Angeles

  • The Incoterm, for example FOB Vietnam, CFR or CIF Los Angeles
  • Who acts as importer of record
  • Containers, flat racks or breakbulk for oversize members
  • Delivery to the port or to a named US place, if offered

No prices, freight rates or duty estimates are published.

PEB Studio · real-time tracking

Follow every bundle from our shop floor to Los Angeles

Watch production stage by stage, open the container packing report when the seal goes on, and scan a member’s QR tag at the port or on site to see what it is and where it goes.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Built near Los Angeles

Industries and buildings this port serves

World Steel in the US

Projects we have shipped to the United States

All projects

Asked by US buyers

Los Angeles shipping questions

Is Los Angeles or Long Beach better for my job?

They share San Pedro Bay and the same rail corridor, so the choice usually follows the carrier and terminal on your booking rather than the site. We quote the one that fits the sailing and tell you which terminal to send your trucker to.

Can steel for Arizona or Nevada come through Los Angeles?

Yes. It is the usual gateway for the desert Southwest: containers are trucked or railed inland from the harbor, or transloaded onto flatbeds near the port.

Who clears customs at Los Angeles?

Your customs broker, acting for the importer of record named in the quote. We send the commercial invoice, packing lists, bill of lading and mill certificates ahead of arrival.

Keep reading

Related pages

Other West Coast ports

Building within reach of Los Angeles?

Send the site address and what the building is for. Our engineers confirm the design basis, suggest the gateway port and Incoterm, and return a written scope for steel made in our Vietnam plant.