Large-project capacity
2,500 t of structural steel a month
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
How large jobs run- Sunpro Steel Factory · Steel industry 5,000 t
- CPV Food Processing Factory · Food processing 2,500 t
- Long Son petrochemical complex · Oil and gas 2,000 t
- M&D (MD Factory) · Warehouse and industrial 2,000 t
- Tongwei Tien Giang feed factory, phase 1 · Animal feed 1,500 t
- New Era cold storage · Cold storage, phase 1 tonnage 1,000 t
Where jobs get stuck
What developers tell us goes wrong
- A budget before the drawingsLenders and partners want a building number while the design is still a concept.
- Thin trade marketsLocal steel and envelope trades are booked out, and every extra vendor adds risk.
- Loads that change by countyWind, snow and seismic criteria move from one site to the next.
What changes with World Steel
How we take those problems off your desk
- Framing options at concept stageClear span, multi-span and modular frames compared on steel weight per square meter for your footprint.
- One package, one scopePrimary frame, secondary steel, roof and wall panels, trims and accessories quoted line by line.
- Every exclusion in writingFoundations, erection, permits and site work are listed as your contractor’s scope, so nothing surprises the budget.
- Progress you can seeYour team follows fabrication in PEB Studio from cutting to packing, piece by piece.
The scope sheet
The scope sheet your pro forma can lean on
Every World Steel quote is laid out like this, so your cost consultant can drop it straight into the budget.
The scope sheet your pro forma can lean on
Framing options we compare on your footprint
- Clear spanOpen floor for retail, sports and storage; heavier frames.
- Multi-spanInterior columns save steel on wide footprints and distribution space.
- Multi-storySteel framing for offices and mixed use over a smaller footprint.
Request a quotation · Developers
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Become our partner in the US
Developers planning several buildings or phases get one engineering team that already knows the program, and repeat-project terms agreed in writing.
See the Contractor Partnership ProgramYour scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that developers use most, each with its own page to read before you call.
Ecosystem for Developers
Photo
Photo
Photo
Photo
Engineering guides
- Complete Building SolutionsFrame, envelope and openings engineered as one US-code building.
- Value EngineeringLeaner steel options, decided by your Engineer of Record
- Snow Load Steel BuildingsGround snow, drift and sliding snow, designed in
How we work
- Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
- Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
- PEB Studio trackingYour own login to follow fabrication, inspections, packing and shipping of your structure in real time.
Buildings to look at
- NYT WarehouseUnited States
Photo
- Apache Camper CenterUnited States · 2023
3D model
- AddarioUnited States · 2024
Photo
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What developers ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
Can we get a building budget before the design is finished?
Yes. Send the footprint, eave height, location and use. We return framing options with steel quantities and an itemized scope, so your cost consultant can budget the building package before the drawings are complete.
What is in a World Steel building package?
The primary frame, secondary steel, roof and wall envelope, trims, openings and accessories listed in the quote, plus shop drawings and design calculations. Foundations, erection and permits are by your US contractor.
Who is our contact once the building is under contract?
Your general contractor buys the steel from us and manages erection. Your development team can follow fabrication and shipping in PEB Studio and join inspections by video.
Can the same building be repeated on other sites?
Yes. A frame engineered once can be adjusted to each site’s wind, snow and seismic loads, which keeps drawings and fabrication efficient across a program.
How large a development can World Steel supply?
The plant fabricates about 2,500 metric tons of structural steel a month. Our largest single job, Sunpro Steel, was 5,000 t.
Where is the steel made?
In World Steel’s own IAS AC472-accredited plant in Vietnam. It is shipped to the US port or delivery point named in the quote.
Similar roles
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.