New Jersey · Pharma and life sciences
Structural steel for New Jersey pharma and life sciences
New Jersey has long been called the medicine chest of the world, with pharma, biotech and medical device companies along the Route 1 corridor from Princeton to New Brunswick and across Central Jersey. Lab and production buildings need stiff floors for sensitive equipment, deep floors for services and a lot of steel for mechanical plant.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Newark–Elizabeth, a short drive from your New Jersey site.
- Corridor
- Route 1, Princeton to New Brunswick
- Floors
- Stiff, vibration-checked
- Services
- Interstitial and roof plant
- Release
- Phase by phase
Why it matters
Floors that do not move, and room for services
Lab and production floors carry sensitive equipment, so they are designed for vibration as well as strength, which often means deeper beams and shorter spans than an office. Air handling, process piping and utilities take up interstitial floors and the roof, adding heavy steel for platforms, duct and pipe supports.
We design or detail composite floor framing to your Engineer of Record’s vibration criteria, platforms and supports for the mechanical plant, and release the steel phase by phase as the campus grows.
What we design and fabricate
Steel for pharma and life sciences
Stiff floors
Composite floor framing for vibration criteria.
Mechanical plant
Platforms and dunnage for air handling.
Service supports
Duct, pipe and cable tray support steel.
Multi-story frames
Columns and girders for lab buildings.
Who does what
Lab steel, split clearly
World Steel supplies
- Floor, frame and platform design or detailing
- Service support steel coordinated with the model
- Packages released phase by phase
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Vibration and process criteria from the owner
- Engineer of Record approval and PE seal
- Fire protection and municipal permit
- Clean rooms, process and MEP systems
- Erection and site work
New Jersey
What we do not claim
World Steel names no pharma, biotech or medical device company as a customer, holds no GMP certification for buildings, and claims no completed New Jersey lab.
New Jersey ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Jersey contractors
New Jersey contractors: let’s win the next project together
If your next bid involves pharma and life sciences, World Steel wants to be your long-term, win-win steel partner in New Jersey. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Jersey project is cut, welded, inspected and packed.
Q&A
What New Jersey buyers ask
Can you meet vibration criteria for lab floors?
Yes. We design or detail the floor framing to the vibration criteria your Engineer of Record sets.
Do you supply mechanical support steel?
Yes. Platforms, dunnage, duct, pipe and cable tray supports can be part of the package.
Can a campus be released in phases?
Yes. We keep the model and release each building or phase as the owner is ready.
Official sources: Choose New Jersey: life sciences
New Jersey solutions
Every New Jersey guide
Related pages
Code facts on this page summarize New Jersey practice, the New Jersey Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Jersey?
Send the drawings or the site address, size and use. We set the New Jersey design basis with your Engineer of Record, design or detail the steel to the Uniform Construction Code and to wind, snow and flood, and quote it made in our plant in Vietnam, packed in erection order for Port Newark and a short drive to your site.