The calendar
What to inspect, and when
Three planned checks a year, adjusted for your region, plus one after every severe event.
Last row: no fixed month. Check after any severe storm, heavy snow or earthquake.
Inspection log
Seven checks that prevent most damage
Print this sheet (it prints without the menus) and keep it with your closeout records.
| When | Inspect | Why it matters | Date | OK |
|---|---|---|---|---|
| Each spring | Roof screws, laps and sealant, starting with corners and edges | Wind and water damage nearly always begins at a loose or missing screw | ||
| Each spring | Gutters, downspouts and overflow scuppers | Clogged drains overload gutters, pond water and cause leaks | ||
| Each spring | Chipped coating and rust on exposed steel, base plates and hardware | A touch-up costs little; spreading rust costs a lot | ||
| Before hurricane season | Door tracks, wind locks, seals and loose trims | One failed door pressurizes the entire building | ||
| Before winter | Roof access, a snow removal plan, heat tape and drains | Improvised snow removal can damage panels and overload drift zones | ||
| After a storm, heavy snow or earthquake | Roof edges, purlins, doors, brace tension, base plates, any water entry | Hidden damage gets worse with the next event | ||
| Yearly in salt-exposed areas | Rinse sheltered steel near docks or the shore that rain never washes, yearly | Salt left in place keeps corroding the steel |
Planning a change?
Four steps before you alter the building
Start with the drawings
Anything new on or in the frame, from a solar array to a hoist or a mezzanine, adds weight the original design may not carry. Begin with the as-built set.
Get it engineered
A licensed engineer should check the change against the original criteria, and your building department may require a permit.
Do not touch the bracing
Never cut or remove a brace to fit a door or duct unless an engineer has designed its replacement.
Keep the file current
File the new drawings with the originals so the next owner or engineer sees the whole history.
Closeout documents
Records to keep for maintenance
Everything a future engineer, insurer or buyer will ask for, handed over at closeout and kept in PEB Studio.
As-built erection drawings
Every member, piece mark and bolted joint as supplied, with the braced bays marked.
Manufacturing Data Record
Material certificates by heat number, weld and inspection results, coating readings.
Coating specification
Products and coats applied, plus the step-by-step field touch-up method.
Design loads and zones
Design snow loads, drift zones and the roof fastener zone plan for wind.
Opening ratings
Design pressure ratings for doors and windows from their manufacturers.
Your inspection log
Season by season, what was checked, found and fixed.
After handover
A project manager who stays with your building
A World Steel project manager stays assigned to your building after handover. Send photos of damage and we match the parts to the drawings and PEB Studio records, then quote replacements made in our plant. Your contractor does the repair on site.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
The same plant fabricates 2,500 metric tons of structural steel a month for jobs like these. Large-project program.
Asked by US project teams
Maintenance questions
10 answers from our engineers, grouped by topic.
Routine upkeep 3 answers
How often should a metal building be inspected?
A walk-down each spring, a season-specific check before hurricane season or winter depending on your region, and a check after any severe storm, heavy snow or earthquake. Busy industrial or coastal buildings may justify more.
Which part of a metal roof needs the most attention?
Corners and edges, where wind suction peaks, plus laps, penetrations and the gutters. Most leaks and most wind damage begin at a loose or missing screw or a clogged drain.
Do we need to repaint the steel on a schedule?
Not on a fixed schedule. Touch up chips and rust as you find them, using the method in the coating specification. Exposed steel near the shore or docks needs a closer look and a yearly rinse where rain never reaches.
After storms and quakes 4 answers
Our building was damaged. Can World Steel help?
Yes. A project manager stays assigned to your building after handover; send them photos and we match the damaged parts to the drawings and component records, then quote replacements. Your contractor does the repair on site.
Should we shovel snow off the roof?
Only with a plan. Clearing one area and not another can overload parts of the frame, and shovels puncture panels. Work from the design snow loads in your records and hire a contractor who knows metal roofs.
What should we check after an earthquake?
Brace tension and connections, base plates and anchor rods, door frames that may have racked, and any cracking at the slab around columns. If anything looks wrong, have a licensed engineer inspect before the building is fully reused.
Can replacement parts be matched exactly?
Yes. Every member carries a piece mark linked to the drawings and the PEB Studio records, so a damaged purlin, girt, trim or brace is fabricated again to the same detail.
Changing the building 3 answers
Can we add solar panels to the roof?
Often, but only after an engineer checks the extra dead load, wind on the array and any snow drift it creates against the original design criteria. Start from the as-built drawings and design loads in your records.
Can we cut a new door into a wall?
Possibly, if no brace sits in that bay or the bracing is redesigned. Never remove a brace or a girt without an engineer's design; your building department may also require a permit.
Can World Steel supply an expansion of our building?
Yes. We design the addition to match the existing frame, check drift on the old roof against the new step, and fabricate it in the same plant, which turns out 2,500 metric tons of structural steel a month.
Keep reading
Related engineering guides
Each one goes deeper on a part of the design this page touches.
- Hurricane coast buildings
- Snow load steel buildings
- Coastal corrosion protection
- Connections & load path
- Project management
- Site Durability Advisor
All eight US site-condition guides, the standards we design to and the IAS AC472 program are on the engineering & standards hub.
Proof at scale
Photo
Photo
Get an engineer’s eyes on your US building
Share drawings, a sketch or the footprint and site address. We agree the design criteria with your Engineer of Record, then send a written scope and the list of submittals, from a plant that fabricates 2,500 metric tons of structural steel a month.