Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Hawaii · Building code

Structural steel and Hawaii county building codes

Hawaii adopts a state building code based on the IBC, and each county, Honolulu, Maui, Hawaii and Kauai, adopts it with its own amendments and runs its own permits. A design professional licensed in Hawaii seals the drawings. We confirm the edition your county enforces before we model.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
State code
IBC based
Adopted by
Four counties
Permits
County by county
Our part
Code stated on sheet one

Why it matters

Four counties, four reviews

A warehouse in Kapolei is reviewed by the City and County of Honolulu, while the same building in Hilo is reviewed by Hawaii County with different amendments and different seismic values.

We confirm the edition and county amendments with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.

Design basis

What the steel design states

The items we confirm with your Engineer of Record before modeling.

ItemWhat we state
CodeThe state code edition and amendments your county enforces
WindASCE 7 wind speed, exposure and risk category
SnowGround snow, drift and the roof shape
SeismicSite class and Seismic Design Category
EnvelopeGirt and purlin details for the adopted energy code

Who does what

Code work, split clearly

World Steel supplies

  • Steel design or detailing to the stated code basis
  • Calculations and drawings for plan review
  • Answers to reviewer comments on the steel
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The permit application
  • Engineer of Record approval and PE seal
  • Geotechnical report and site class
  • Special inspections and local inspections
  • Foundations and erection

Hawaii

What we do not claim

World Steel holds no Hawaii approval and no Hawaii engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.

Hawaii ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Hawaii contractors

Hawaii contractors: let’s win the next project together

If your next bid involves county building codes, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.

Fitter grinding a cut steel edge, sparks flying, on the shop floor
Cut edges are dressed before fit-up, World Steel plant in Vietnam.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.

Q&A

What Hawaii buyers ask

Does every county use the same code?

The same state code base, adopted by each county with its own amendments.

Who seals the drawings?

A design professional licensed in Hawaii, on your team. World Steel designs and fabricates only.

Can you answer plan review comments?

Yes. We answer comments on the steel and revise drawings through your Engineer of Record.

Official sources: Hawaii State Building Code Council

Building in Hawaii?

Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.