Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Montana structural steel solutions

Structural steel for large Montana projects, from Billings to the Bitterroot

Montana builds refinery and energy plants in Billings and the Bakken, mine and mill structures around Butte and the Stillwater, warehouses and labs in Bozeman and Missoula and wheat and cattle buildings across the plains. As a structural steel fabricator with our own plant in Vietnam, we design the steel to the Montana building code, western seismic belts and mountain snow, and deliver it complete by rail and truck.

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam

Light gray warehouse roof beside process plants, seen from above
Drone view of a World Steel warehouse on an overseas industrial site.

Six brands on the range

Where Montana builds big, and what each place needs

From the refineries of Billings and the growth of Bozeman to the mines of Butte and the wheat of the Hi-Line, Montana’s large projects gather in six places. Each has its own buildings and its own weather.

  • Billings

    Yellowstone County

    Refineries, energy and distribution.

  • Bozeman and Belgrade

    Gallatin Valley

    Fast growth, labs and warehouses.

  • Missoula

    Western Montana

    Plants, warehouses and seismic design.

  • Butte and Anaconda

    Southwest Montana

    Copper and metal mines and mills.

  • Great Falls and the Hi-Line

    North central Montana

    Wheat, grain and defense work.

  • Eastern Montana

    Sidney and the Bakken

    Oil field shops and yards.

Billings

Yellowstone Valley

Billings refineries and energy.

Gallatin

Gallatin Valley

Bozeman growth and labs.

West

Western valleys

Missoula, Kalispell and faults.

Mines

Mining country

Butte and the Stillwater.

Hi-Line

The Hi-Line

Wheat, grain and open wind.

East

Eastern plains

Bakken oil and chinook wind.

Ready for Montana

What a large Montana project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released area by area.

Large-project program →

Ready for the reviewer

Calculations that state the Montana code edition, the reviewing office and the loads.

Montana building code guide →

Western seismic belts

Steel designed or detailed to AISC 341 where the Seismic Design Category calls for it.

Western seismic belts guide →

Demand-critical welds

AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.

Demand-critical welds →

Accredited plant

The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.

IAS AC472 accreditation →

Shop drawings included

Tekla shop and erection drawings for every Montana project at no extra cost, ready for approval.

Shop drawings, included →

Live production tracking

Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.

PEB Studio tracking →

Rail across the Rockies

Steel packed complete in erection order and carried east by rail from Seattle or Tacoma.

Rail across the Rockies guide →

Solution advisor

Pick what you are building. We recommend the steel.

Structural steel for the project types Montana builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

The Montana ecosystem

Every product and solution a Montana project needs, board by board

Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.

Open call · Montana contractors

Montana contractors: you cover the distance, we fabricate the steel for big country

Refinery and energy work in Billings and the Bakken, mine and mill structures around Butte and the Stillwater, warehouses and plants in Missoula, Bozeman and Great Falls and wheat and cattle buildings across the plains are large steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, deliver it complete by rail and truck in erection order and back your bids with drawings and live tracking.

Where Montana partners win with us

  • Refinery and energy work in the east
  • Mine and mill structures in the west
  • Wheat and cattle buildings on the plains
You bringThe owner, EOR approval and permit, foundations and erection
We bringDesign, shop drawings, 2,500 t a month and the steel delivered

Buying steel from outside the US

Buying structural steel from outside the US? Here is what Montana buyers check.

The questions Montana owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

Real World Steel photos

Every Montana package starts in our plant in Vietnam

Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a Montana site.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.

Worry-free shipping

Steel for your Montana project, without the shipping worries

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Questions from Montana buyers

Montana questions we hear most

Which code applies to my Montana project?

Montana adopts the IBC statewide with amendments through the Department of Labor and Industry. Certified cities and counties enforce it locally, and the state Building Codes Program covers commercial work elsewhere. We confirm the reviewer and edition for your site with your Engineer of Record.

How do you design for Montana seismic and snow?

Western Montana sits in the Intermountain Seismic Belt, where the 1959 Hebgen Lake earthquake is the reference event, and many sites fall in Seismic Design Category D. Ground snow varies greatly by elevation. We design the frames, bracing and roof steel for the values your Engineer of Record sets.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.

How does steel reach a Montana site?

Our steel usually lands at Seattle or Tacoma and travels east by rail on the northern transcontinental lines or by truck on I-90 and I-94 to Missoula, Billings and beyond. Members are packed complete and in erection order.

Do you erect the steel in Montana?

No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.

Talk to an engineer

Send the address. We tell you what Montana asks of your steel.

Our engineers and project managers work in English and reply with the code, seismic, snow and delivery questions for your site.

Honest status. World Steel designs and fabricates to the Montana building code and ASCE 7. We hold no state or local approval and no Montana engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Building in Montana?

Send the drawings or the site address, size and use. We set the Montana design basis with your Engineer of Record, design or detail the steel to the Montana building code, western seismic belts and mountain snow, prepare it for plan review, and quote it made in our plant in Vietnam, packed complete in erection order and delivered by rail or truck to your site.