Resorts and villas
Meads Bay, Rendezvous Bay, Shoal Bay, West End
Hotel buildings, villas, beach restaurants and spa roofs designed for wind and salt.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Anguilla guides
Planning permission and the code basis, hurricanes after Irma, limestone ground and the Lesser Antilles arc, salt air across a narrow island, the Road Bay port, and the resort and public work that drives the market, one guide each.
Project types
The four project types behind most steel orders on the island, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Meads Bay, Rendezvous Bay, Shoal Bay, West End
Hotel buildings, villas, beach restaurants and spa roofs designed for wind and salt.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
The Valley and every district
Classrooms, clinics, offices and halls designed to serve as hurricane shelters where required.
Clear-span interior on a World Steel job in southern Vietnam.
Sandy Ground, The Valley, the airport
Clear-span warehouses, depots, water and power buildings.
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.
The Valley, Blowing Point
Terminal, hangar and cargo frames, ferry and harbour buildings.
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Fourteen districts on one long island
Anguilla has fourteen districts along a long, flat island: the resort beaches and the Road Bay port in the west, The Valley, the airport and the centre of the island, and the fishing villages and quiet tip of the east end. Each page covers the main village, the ground, the hurricane and salt conditions, the haul from Road Bay and the steel we recommend for what gets built there.
The west endThe centreThe east end
West End, Blowing Point, South Hill, Sandy Ground and North Hill: the resort beaches, the ferry to St Martin and the cargo port at Road Bay.
George Hill, The Farrington, The Valley, The Quarter, Stoney Ground and North Side: the capital, the airport, government and most homes.
Sandy Hill, Island Harbour and East End: fishing villages, Savannah Bay and the quiet eastern tip.
National symbols of Anguilla
The turquoise sea and white field of the arms, the three orange dolphins leaping in a ring for strength and endurance, the island’s sloop racing and its white beaches and salt ponds. Four symbols, and what each one means for the steel we make for Anguillian buildings.
Three orange dolphins leaping in a ring stand for strength and endurance. It is what we ask of every frame we design for the island.
The band of turquoise under the dolphins is the sea that rings Anguilla. Salt air reaches every site, so coatings are chosen for it.
Racing wooden sloops is Anguilla’s national sport, built by local hands. Every member we send is marked for local hands to erect.
White beaches and old salt ponds made the island’s name. They also set the exposure for steel, from the beachfront to the ponds.
Why World Steel
2,500 metric tons of structural steel a month from our own plant, released building by building.
Large-project program →Frames, cladding and anchors designed for the wind, after Irma showed what fails first.
Hurricane guide →Ductile frames and welds detailed for the earthquake values your engineer sets.
Ground guide →Calculations that state the code basis for your engineer and the planning authority.
Planning guide →Paint systems and galvanizing chosen for beachfront and salt-pond sites.
Coatings guide →Packed in erection order and shipped to the Road Bay cargo port at Sandy Ground.
Port delivery guide →Buy it all in one place · Anguilla
Resorts and villas, the airport, warehouses and public buildings. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Road Bay, with every piece tracked live in PEB Studio.
All solutions and products for Anguilla→Picked for Anguilla
Hurricane, salt air and earthquake guides
Also from the same plant
One desk, every step
No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.
Seeking Anguillian contractor partners
Resorts and villas on Meads Bay, Rendezvous Bay and Shoal Bay, the airport, schools, clinics, government buildings in The Valley and warehouses near Road Bay are big steel packages for a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Road Bay and back your bid with drawings and live tracking.
Hurricanes, salt air, earthquakes
A broad hazard picture for Anguilla and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.
Real World Steel photos
Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Anguilla.
Questions from Anguillian buyers
Development permission goes through the Department of Physical Planning and the Land Development Control Committee under the Physical Planning Act. Your engineer of record agrees the code basis with the authorities. We state that basis on the first sheet of our calculations.
Yes. Luis in 1995, Lenny in 1999 and Irma in 2017, which crossed the island at full strength. On a low island wind, surge and salt spray come together. We design the whole load path for the wind speed your engineer sets.
Anguilla lies near the north end of the Lesser Antilles arc, where the Atlantic plate dives under the Caribbean plate. Steel frames are designed for the seismic values your engineer sets.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Road Bay at Sandy Ground, Anguilla’s cargo port. Blowing Point is the ferry port for St Martin.
No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.
Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Anguilla and the US standards it references. We hold no approval, licence or registration in Anguilla and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.
Contact World Steel · Anguilla
WhatsApp, email or a video call with our engineers, booked at an hour that suits The Valley. Our contact page for Anguilla has the ports, the local time and the form.