Oil field plants and yards
Hobbs, Carlsbad and Artesia
Process buildings, equipment shelters and galvanized steel.
GPPD Energy factory, Vietnam: plant steel by World Steel
Six flags on the high desert
From the oil field of the Permian and the studios of Albuquerque to the labs of Los Alamos and the dairies of the eastern plains, New Mexico’s large projects gather in six places. Each has its own buildings and its own weather.
Sound stages, plants, distribution and public work.
Labs, research and high-altitude snow.
Chip and advanced manufacturing plants.
Border logistics, aerospace and food.
Oil field yards, plants and equipment shelters.
Dairies, cheese plants and feed.
Albuquerque plants, stages and the rift.
Santa Fe, Los Alamos and mountain snow.
Las Cruces, the border and Santa Teresa.
The Permian oil field.
Dairies, cheese and feed on the plains.
Farmington energy and the Four Corners.
New Mexico guides
One guide per New Mexico condition: the state code, Rio Grande seismic, altitude snow, the rail and truck route, and the oil field, sound stage, dairy and lab projects that drive the market.
Ready for New Mexico
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations that state the New Mexico Commercial Building Code edition, the reviewing office and the loads.
Commercial Building Code guide →Steel designed or detailed to AISC 341 where the Seismic Design Category calls for it.
Rio Grande rift seismic guide →AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.
Demand-critical welds →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every New Mexico project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Steel packed in erection order through Los Angeles–Long Beach or Houston and inland by rail or truck.
Rail and truck inland guide →Solution advisor
Structural steel for the project types New Mexico builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Hobbs, Carlsbad and Artesia
Process buildings, equipment shelters and galvanized steel.
GPPD Energy factory, Vietnam: plant steel by World Steel
Albuquerque and Santa Fe
Column-free stages with heavy grid and catwalk loads.
Hangar, Thailand: long-span World Steel frames
Los Alamos, Albuquerque and Santa Fe
Stiff floors, interstitial steel and heavy roof plant.
Boss Pharmacere factory, Thailand: plant steel by World Steel
Rio Rancho and Albuquerque
Long-span production halls and utility steel.
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
Clovis, Portales and Roswell
Processing halls, washdown coatings and cold rooms.
CPV Food processing plant, Vietnam: 2,500 t of World Steel structural steel
Santa Teresa and Las Cruces
Clear-span warehouses and cross-docks near the border.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Albuquerque and the eastern plains
Freezer warehouses with thermal breaks.
New Era cold storage, Vietnam: 1,000 t of World Steel structural steel
Farmington and Albuquerque
Process buildings and crane bays to owner specifications.
Interlink factory, Thailand: plant steel by World Steel
The New Mexico ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large New Mexico structures, beyond metal buildings.
Complete buildings engineered for New Mexico sites.
Members and parts made in our Vietnam plant.
The design basis your building official checks.
How you buy and follow your steel.
From the plant in Vietnam to your New Mexico site.
Open call · New Mexico contractors
Oil field yards and plants around Hobbs and Carlsbad, sound stages and plants in Albuquerque, labs and advanced manufacturing near Santa Fe and Rio Rancho and dairy and food plants on the eastern plains are large steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, deliver it in erection order and back your bids with drawings and live tracking.
Where New Mexico partners win with us
Buying steel from outside the US
The questions New Mexico owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a New Mexico site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from New Mexico buyers
The New Mexico Commercial Building Code, based on the IBC and adopted statewide by the Construction Industries Division. Some cities, such as Albuquerque, run their own permit programs. We confirm the edition and reviewing office with your Engineer of Record.
Parts of it are. The Rio Grande rift gives central New Mexico, from Socorro through Albuquerque to Santa Fe, moderate seismic hazard. Your Engineer of Record sets the site class and Seismic Design Category, and we design and detail the steel to AISC 341 where it applies.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.
Our steel usually lands at Los Angeles–Long Beach or Houston and travels by rail or truck on I-40, I-25 and I-10 to Albuquerque, Las Cruces or the Permian. Members are packed in erection order.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, seismic, snow and delivery questions for your site.
Honest status. World Steel designs and fabricates to the New Mexico Commercial Building Code and ASCE 7. We hold no state or local approval and no New Mexico engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the New Mexico design basis with your Engineer of Record, design or detail the steel to the New Mexico Commercial Building Code, Rio Grande seismic rules and altitude snow, prepare it for plan review, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail or truck to your site.