Chemical and energy plants
The Kanawha and Ohio valleys
Process buildings, platforms and equipment steel to owner specifications.
GPPD Energy factory, Vietnam: plant steel by World Steel
Six seams on the map
From the chemical plants of the Kanawha Valley and the warehouses of the Eastern Panhandle to the river towns of the Ohio Valley and the southern coalfields, West Virginia’s large projects gather in six places. Each has its own buildings and its own weather.
Chemical plants, energy and public work.
Distribution centers on I-81.
University, research and gas industry.
Steel, chemicals and river industry.
River port, plants and health care.
Mine structures and prep plants.
Chemical plants and the capital.
Logistics on I-81 near Washington.
Plants and river industry.
Morgantown research and gas.
Mines and prep plants.
Heavy snow and steep roads.
West Virginia guides
One guide per West Virginia condition: the state code, snow and floods, steep sites, the port and mountain road route, and the chemical, manufacturing, logistics and mine projects that drive the market.
Ready for West Virginia
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations that state the West Virginia code edition, local adoption and the loads.
State Building Code guide →Roof steel for highland snow and drift, with flood elevations coordinated for valley sites.
Mountain snow and floods guide →Hot-dip galvanizing and paint systems from Jotun, PPG, Carboline, Hempel, Nippon and International Paint.
Hot-dip galvanizing →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every West Virginia project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Steel through Baltimore or Norfolk, in bundles sized for the roads to your site.
Ports and mountain roads guide →Solution advisor
Structural steel for the project types West Virginia builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
The Kanawha and Ohio valleys
Process buildings, platforms and equipment steel to owner specifications.
GPPD Energy factory, Vietnam: plant steel by World Steel
Martinsburg and Inwood
Clear-span frames, dock walls and phased releases on I-81.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Parkersburg, Weirton and Huntington
Production halls, crane bays and heavy runway girders.
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
The southern and northern coalfields
Process buildings, conveyor steel and crane bays to owner specifications.
Hoa Phat factory, Vietnam: heavy plant steel by World Steel
Wheeling and the Northern Panhandle
Process buildings and crane bays.
Interlink factory, Thailand: plant steel by World Steel
Morgantown, Charleston, Huntington
Composite floor framing and braced frames for tight sites.
College of Medicine, Philippines: multi-story steel frame by World Steel
The Eastern Panhandle
Freezer warehouses with thermal breaks.
New Era cold storage, Vietnam: 1,000 t of World Steel structural steel
The Eastern Panhandle and north central
Repeat halls, roof plant platforms and phased releases.
Nitto Denko factory, Vietnam: plant steel by World Steel
The West Virginia ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large West Virginia structures, beyond metal buildings.
Complete buildings engineered for West Virginia sites.
Members and parts made in our Vietnam plant.
The design basis your building official checks.
How you buy and follow your steel.
From the plant in Vietnam to your West Virginia site.
Open call · West Virginia contractors
Chemical and energy plants in the Kanawha and Ohio valleys, distribution centers in the Eastern Panhandle, manufacturing plants along the Ohio River and mine and prep plant structures in the coalfields are large steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, pack it for mountain roads in erection order and back your bids with drawings and live tracking.
Where West Virginia partners win with us
Buying steel from outside the US
The questions West Virginia owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a West Virginia site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from West Virginia buyers
The West Virginia State Building Code, based on the IBC and adopted by the State Fire Commission. It is enforced where a city or county has adopted it, and the State Fire Code applies statewide. We confirm the edition and reviewing office with your Engineer of Record.
We take ASCE 7 ground snow by site elevation, which rises quickly in the eastern highlands, and check drift at every roof step. In valley flood zones we coordinate floor level and anchorage with your engineer for the design flood elevation.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.
Our steel usually lands at Baltimore or Norfolk and travels by truck on I-81, I-64, I-77 and I-79 or by rail. Bundles are sized for mountain roads and packed in erection order, so each truck carries one area.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, snow, flood and delivery questions for your site.
Honest status. World Steel designs and fabricates to the West Virginia State Building Code and ASCE 7. We hold no state or local approval and no West Virginia engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the West Virginia design basis with your Engineer of Record, design or detail the steel to the West Virginia State Building Code, mountain snow and valley floods, prepare it for plan review, and quote it made in our plant in Vietnam, packed in erection order for mountain roads and delivered through Baltimore or Norfolk.