Arkansas · Building code
Structural steel and the Arkansas Fire Prevention Code
Arkansas adopts its building rules through the Arkansas Fire Prevention Code, which takes IBC-based building provisions statewide under the State Fire Marshal. Cities enforce it and may add local rules. We confirm the edition for your site before we model and state it on the calculations.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New Orleans or Houston for your Arkansas site.
- Statewide code
- Fire Prevention Code
- Base
- IBC provisions
- Administered by
- State Fire Marshal
- Our part
- Code stated on sheet one
Why it matters
One state code, local enforcement
The building volume of the Fire Prevention Code applies across Arkansas, but Little Rock, Fayetteville, Bentonville and other cities run their own plan review and may add local rules. Seismic and wind values still change from one end of the state to the other.
We confirm the edition and local rules with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The Arkansas Fire Prevention Code edition and any local rules |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
Arkansas
What we do not claim
World Steel holds no Arkansas approval and no Arkansas engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
Arkansas ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Arkansas contractors
Arkansas contractors: let’s win the next project together
If your next bid involves Fire Prevention Code, World Steel wants to be your long-term, win-win steel partner in Arkansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Arkansas project is cut, welded, inspected and packed.
Q&A
What Arkansas buyers ask
Does Arkansas have a statewide building code?
Yes. Building provisions based on the IBC are adopted through the Arkansas Fire Prevention Code.
Who reviews my plans?
Usually the city building department, or the state where no local office reviews. We confirm it early.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: Arkansas State Fire Marshal
Arkansas solutions
Every Arkansas guide
Related pages
Code facts on this page summarize Arkansas practice, the Arkansas Fire Prevention Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Arkansas?
Send the drawings or the site address, size and use. We set the Arkansas design basis with your Engineer of Record, design or detail the steel to the Arkansas Fire Prevention Code, New Madrid seismic rules and storm loads, and quote it made in our plant in Vietnam, packed in erection order and delivered through New Orleans or Houston to your site.