Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trinidad and Tobago steel solutions

Structural steel for large Trinidad and Tobago projects, from Point Lisas to Scarborough

Trinidad and Tobago gave the world the steelpan, the only acoustic instrument invented in the twentieth century, hammered from oil drums. Steel has been part of the islands’ story ever since: the energy plants of Point Lisas and Point Fortin, warehouses on the East-West Corridor, malls in Chaguanas and hotels in Tobago. We design the steel for the islands’ earthquakes, clay soils and salt air in our own plant in Vietnam and ship it to Port of Spain or Point Lisas.

Together we aspire, together we achieve

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to Port of Spain or Point Lisas

Seaside industrial site with a steel warehouse at its center, wide drone shot
Wide aerial of a World Steel warehouse on a seaside site outside the US.

Fourteen municipal corporations and Tobago

Pick your municipality. Each one has its own steel page.

Trinidad is run by 14 municipal corporations, from the city of Port of Spain to the regions of the south and east. Tobago has its own House of Assembly. Each page covers the towns, the ground, the seismic and wind conditions, the road from the port and the steel we recommend for what gets built there.

NorthCentralSouthTobagoSelected

North

Port of Spain, the East-West Corridor, the Northern Range and the north-east.

Central

Chaguanas, Couva and Point Lisas, the cane lands and the east coast at Mayaro.

South

San Fernando, the oil belt, Point Fortin and the southern peninsula.

Tobago

The sister island: Scarborough, the resorts and the Tobago House of Assembly.

National symbols of Trinidad and Tobago

Built with respect for Trinidad and Tobago

Red for the fire of the people and the sun, white for the sea, black for strength and unity. Four national symbols, and what each one means for the steel we make for Trinbagonian buildings.

The steelpan

Born in the yards of Port of Spain from discarded oil drums. Steel, shaped with skill, became music; we shape it into structures.

Scarlet ibis

The national bird of Trinidad, flying home to the Caroni Swamp at dusk. Red like the flag and the primer on our frames.

Cocrico

Tobago’s national bird, the rufous-vented chachalaca, loud and proud. We think steel should be as dependable as its morning call.

Chaconia

The wild poinsettia blooms red at Independence. Its colour runs through this page and our partner invitation.

Why World Steel

What a large Trinbagonian project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released area by area.

Large-project program →

Earthquake design

Seismic frames and connections, AWS D1.8-qualified welders for demand-critical welds.

Earthquake guide →

Petrochemical experience

Long Son petrochemical complex, 2,000 t: pipe racks and process steel at scale.

Energy and petrochemical guide →

Ready for approval

Calculations that state the code basis for your engineer and the municipal corporation.

Building approvals guide →

Coated for salt and industry

Paint systems and galvanizing for coastal and industrial air.

Coatings guide →

Shipped to two ports

Packed in erection order and shipped to Port of Spain or Point Lisas.

Port delivery guide →

Project types

What Trinidad and Tobago builds in steel, and where

The four project types behind most steel orders on the two islands, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Stiffened heavy plate girders resting on shop supports

Energy and petrochemical

Point Lisas, Point Fortin, La Brea, Mayaro

Pipe racks, process structures, compressor houses and workshops for gas, ammonia, methanol and LNG.

Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Top-down drone shot of an open steel warehouse frame

Logistics and light industry

East-West Corridor, Piarco, Chaguanas

Clear-span warehouses, distribution centers and light industrial units with docks and mezzanines.

Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

Buy it all in one place · Trinidad and Tobago

Everything your project in Trinidad and Tobago needs in steel, from one desk

Point Lisas energy plants, port logistics, offices in Port of Spain and Tobago hotels. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Port of Spain, with every piece tracked live in PEB Studio.

All solutions and products for Trinidad and Tobago

Picked for Trinidad and Tobago

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF Port of Spain
  9. Your contractor erectsClearance at Port of Spain, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFPort of Spain, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Trinbagonian contractor partners

Trinbagonian contractors: you win the job, we fabricate the steel

Plants and pipe racks at Point Lisas, warehouses on the East-West Corridor, malls in Chaguanas, offices in Port of Spain and resorts in Tobago are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Port of Spain or Point Lisas and back your bid with drawings and live tracking.

  • Energy and petrochemical works at Point Lisas
  • Logistics along the East-West Corridor
  • Hotels and public buildings in Tobago

Hurricanes, salt air, earthquakes

Steel for Trinidad and Tobago’s storms and sea

A broad hazard picture for Trinidad and Tobago and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every Trinidad and Tobago package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Trinidad or Tobago.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Caribbean logistics

Ports for Trinidad and Tobago: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Trinbagonian buyers

Trinidad and Tobago questions we hear most

Which building rules apply to steel buildings in Trinidad and Tobago?

Projects need planning permission from the Town and Country Planning Division and building approval from the municipal corporation; in Tobago the Tobago House of Assembly handles approvals. Structural design commonly references the IBC and ASCE 7 with local seismic and wind values. We state the code basis your engineer of record sets on the first calculation sheet.

Is Trinidad and Tobago an earthquake zone?

Yes. The islands sit near the boundary of the Caribbean and South American plates, with active faults to the north and the strong 2018 earthquake off Venezuela felt across the country. Steel frames are designed and welded for the seismic category your engineer sets.

Do hurricanes reach Trinidad and Tobago?

Trinidad lies south of the main hurricane belt, but tropical storms and hurricanes have struck Tobago. We design for the wind speed and exposure your engineer sets for each island and site.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t, which is the kind of plant Point Lisas builds.

Which port do you ship to?

Port of Spain for the north and most building projects, Point Lisas for central and southern industrial sites, and Scarborough for Tobago.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the municipality and the plan. We tell you what the islands ask of your steel.

Our engineers and project managers work in English and reply with the code, seismic, wind and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Trinidad and Tobago and the US standards it references. We hold no approval, licence or registration in Trinidad and Tobago and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · Trinidad and Tobago

Talk to us about steel for Trinidad and Tobago

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port of Spain. Our contact page for Trinidad and Tobago has the ports, the local time and the form.