Made in Vietnam, landed at Jacksonville
Why ship your building through Jacksonville
The Jacksonville Port Authority runs three marine terminals on the St. Johns River: Blount Island and Dames Point for containers and ro-ro, and Talleyrand for breakbulk, steel and other general cargo. The federal channel was deepened to 14.3 m (47 ft) from the ocean to Blount Island in 2022.
Florida steel buildings face the toughest wind rules in the country. We design to the Florida Building Code, fabricate in World Steel’s plant in Vietnam and ship to Jacksonville, where CSX, Norfolk Southern and the Florida East Coast Railway take over for longer hauls.
-
One package, one plant
Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.
-
Accredited fabrication
World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.
-
Designed to US codes
IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.
-
Packed for this port
Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.
Port facts
Terminals, channel and connections at Jacksonville
Channel
14.3 m (47 ft) to Blount Island, completed 2022
Rail
CSX, Norfolk Southern and Florida East Coast Railway
Highways
I-95, I-10, I-295
| Terminal | Where / operator | Cargo |
|---|---|---|
| Blount Island Marine Terminal | Containers and ro-ro | Containers |
| Dames Point Marine Terminal | Container terminal operated by TraPac | Containers |
| Talleyrand Marine Terminal | Breakbulk, steel and general cargo | Breakbulk |
Source: JAXPORT: cargo facilities, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.
From our plant to Jacksonville
How your steel gets here
Through the Panama Canal and up the Atlantic coast to the St. Johns River on most services.
Your shipment to Jacksonville, leg by leg
Run the full simulation →By road
About 2 hours
World Steel pays
By sea · via Panama
≈ 11,500 nmi illustrative lane
Split between us
Customs, truck or rail
Planned with your trucker
You pay
Risk passes to you when the steel is on board the vessel at the named Vietnamese port.
Inland reach
Where steel goes from Jacksonville
I-95 runs the length of the Atlantic coast and I-10 runs west to the Panhandle; I-4 links to Orlando and Tampa. CSX, NS and the Florida East Coast Railway serve the region by rail.
Designed for the region
Site conditions we design for around Jacksonville
Hurricane Coast Steel Buildings
Florida Building Code wind design and wind-borne debris protection apply across much of the state.
How we design for itHigh-Wind Steel Buildings
Components and cladding pressures drive panel and fastener choices.
How we design for itCoastal Corrosion Protection
Coastal and humid sites need the right coating system.
How we design for itOn arrival
Receiving your steel at Jacksonville
Florida product approvals
Some cladding needs Florida product approval; we confirm what your jurisdiction asks for.
Oversize members
Long members can discharge as breakbulk at Talleyrand.
Hurricane season
Brace partly erected frames from June to November.
Documents sent ahead to your broker
- Commercial invoice and packing list per container
- Bill of lading and certificate of origin
- Container packing report with seal number and VGM
- EN 10204 3.1 mill certificates
- Shipping marks with a QR link to each member’s passport
What the quote states for Jacksonville
- The Incoterm, for example FOB Vietnam, CFR or CIF Jacksonville
- Who acts as importer of record
- Containers, flat racks or breakbulk for oversize members
- Delivery to the port or to a named US place, if offered
No prices, freight rates or duty estimates are published.