Made in Vietnam, landed at Mobile
Why ship your building through Mobile
The Alabama Port Authority runs the public terminals at Mobile, including the APM Terminals container terminal and a large general cargo complex that handles steel, forest products and project cargo. The Terminal Railway Alabama State Docks connects the docks to five Class I railroads.
For jobs in Alabama, Mississippi, the Florida Panhandle and Tennessee, Mobile keeps the inland leg short. Your steel is made in World Steel’s plant in Vietnam, shipped through the Panama Canal and discharged at Mobile for your broker to clear.
-
One package, one plant
Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.
-
Accredited fabrication
World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.
-
Designed to US codes
IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.
-
Packed for this port
Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.
Port facts
Terminals, channel and connections at Mobile
Channel
15.2 m (50 ft) ship channel, completed 2025
Rail
Five Class I railroads via the Terminal Railway Alabama State Docks
Highways
I-10, I-65, I-165
| Terminal | Where / operator | Cargo |
|---|---|---|
| APM Terminals Mobile | Container terminal on Choctaw Point | Containers |
| Alabama State Port Authority general cargo docks | Steel, project and breakbulk cargo | Breakbulk |
Source: Alabama Port Authority, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.
From our plant to Mobile
How your steel gets here
Across the Pacific, through the Panama Canal and north across the Gulf of Mexico into Mobile Bay.
Your shipment to Mobile, leg by leg
Run the full simulation →By road
About 2 hours
World Steel pays
By sea · via Panama
≈ 11,400 nmi illustrative lane
Split between us
Customs, truck or rail
Planned with your trucker
You pay
Risk passes to you when the steel is on board the vessel at the named Vietnamese port.
Inland reach
Where steel goes from Mobile
Trucks serve the Gulf Coast on I-10 and run north on I-65 toward Birmingham and Tennessee. The Terminal Railway connects to the Class I railroads for longer hauls.
Designed for the region
Site conditions we design for around Mobile
Hurricane Coast Steel Buildings
Coastal Alabama is hurricane-prone; debris and opening rules may apply.
How we design for itOn arrival
Receiving your steel at Mobile
Mix boxes and breakbulk
Heavy members can discharge at the general cargo docks while panels come in containers.
Rail north
Ask about the Terminal Railway for Birmingham or Tennessee sites.
Storm season planning
Keep a storm plan for partly erected frames from June to November.
Documents sent ahead to your broker
- Commercial invoice and packing list per container
- Bill of lading and certificate of origin
- Container packing report with seal number and VGM
- EN 10204 3.1 mill certificates
- Shipping marks with a QR link to each member’s passport
What the quote states for Mobile
- The Incoterm, for example FOB Vietnam, CFR or CIF Mobile
- Who acts as importer of record
- Containers, flat racks or breakbulk for oversize members
- Delivery to the port or to a named US place, if offered
No prices, freight rates or duty estimates are published.