Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the blue-clad Sunpro Steel plant beside a river in Can Tho, Vietnam

Sunpro Steel plant, Can Tho, Vietnam: 5,000 t of World Steel structural steel.

Steel building packages · Large projects

Pre-engineered steel buildings, packaged for US contractors, up to 5,000 t on one job

Eighteen building packages, from one workshop to a crane-served steel plant, all designed and fabricated in our own IAS AC472-accredited plant in Vietnam and shipped to the US contractor who builds it.

Large projects

The largest packages we have delivered

Structural steel supplied by World Steel, in metric tons. One month of plant output is 2,500 t (about 2,750 short tons), and several jobs move through the shop in parallel.

  • Sunpro Steel Factory5,000 t
  • CPV Food Processing Factory2,500 t
  • Long Son petrochemical complex2,000 t
  • M&D (MD Factory)2,000 t
  • Tongwei Tien Giang feed factory, phase 11,500 t
  • New Era cold storage1,000 t
Large-project program

Projects outside the US, shown for their size; they are not US sites.

Fabrication capacity

Every package comes out of the same 2,500 t a month plant

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

Find a package

Start from what your building must do

Pick a need to narrow the eighteen packages to the ones built around it. Each package opens its own page with the uses, the frame and envelope, the add-ons, what is excluded and the projects behind it.

Filter packages by need

Showing all 18 packages. 12 packages built around: wide clear span. 3 packages built around: cranes and heavy loads. 7 packages built around: insulated or conditioned. 7 packages built around: upper floors and mezzanines. 3 packages built around: open-sided canopy. 6 packages built around: equipment and roof loads. 5 packages built around: harsh exposure.

Tall lattice columns of a crane-served industrial building during erection Photo

Industry and logistics

Manufacturing Plants with Crane Bays

Production buildings with overhead crane bays, built-up frames and room for the next production line.

Cranes and heavy loadsWide clear spanEquipment and roof loads
Open the package →
Factory frame by World Steel under erection, photographed by drone Photo

Industry and logistics

Workshop Buildings with Office

Shop buildings that combine work bays, a crane or hoist line and a front office or mezzanine under one roof.

Cranes and heavy loadsUpper floors and mezzaninesWide clear span
Open the package →
Insulated sectional door seen from inside a steel building Photo

Industry and logistics

Cold Storage Buildings

Steel frames and insulated envelopes for coolers, freezers and temperature-controlled distribution.

Insulated or conditionedWide clear spanEquipment and roof loads
Open the package →
Inside a big warehouse: steel columns carrying rafters and the roof Photo

Industry and logistics

Warehouse & Distribution Buildings

Clear-span and multi-span steel warehouses for regional distribution, e-commerce fulfillment and contractor storage.

Wide clear spanUpper floors and mezzanines
Open the package →
Warehouse frame from above, purlins and girts fixed to the rafters and columns Photo

Industry and logistics

Cross-Dock & Logistics Buildings

Narrow, long cross-dock and truck terminal buildings with dock doors on both sides and framing built for constant traffic.

Wide clear span
Open the package →
Finished feed mill with long blue metal roofs, seen from the air Photo

Industry and logistics

Data Center Shell Buildings

Steel shells for data halls, edge sites and power buildings, with the supports for cooling, power and cable paths planned in the frame.

Equipment and roof loadsInsulated or conditionedUpper floors and mezzanines
Open the package →
Rows of roof purlins and rod bracing across a steel frame Photo

Industry and logistics

Equipment Shelter Buildings

Small steel buildings that protect generators, pumps, switchgear and stored equipment.

Equipment and roof loadsHarsh exposure
Open the package →
Portal frames and roof purlins silhouetted against the sky Photo

Energy, aviation and rural

Solar & EV Charging Canopies

Steel canopies that carry solar modules over parking, with columns and conduit paths laid out around EV chargers.

Open-sided canopyHarsh exposure
Open the package →
Port structures several stories high under construction, drone view Photo

Energy, aviation and rural

Agricultural Steel Buildings

Machine sheds, hay barns, livestock and crop storage buildings for farms and ranches.

Wide clear spanHarsh exposureOpen-sided canopy
Open the package →
Open floor of a clear-span warehouse with no interior columns Photo

Energy, aviation and rural

Carport & Canopy Structures

Open steel carports, parking canopies and covered work areas, with a solar-ready option.

Open-sided canopyHarsh exposure
Open the package →
Finished warehouse in white wall panels with sectional doors along one side Photo

Commercial and community

Commercial & Retail Steel Buildings

Showrooms, dealerships, offices, grocery and strip-center buildings where a steel frame sits behind a finished storefront.

Wide clear spanUpper floors and mezzaninesInsulated or conditioned
Open the package →
Finished steel building in blue wall panels with a walk-in door Photo

Commercial and community

Auto Dealership & Service Buildings

Showrooms with a finished storefront and service drives with repair bays, framed as one building or two.

Wide clear spanUpper floors and mezzaninesInsulated or conditioned
Open the package →
Mobile crane lifting a member into a multi-story steel frame Photo

Commercial and community

Multi-Story Steel Buildings

Two- to several-story steel frames for offices, medical office, classrooms and mixed-use buildings.

Upper floors and mezzaninesEquipment and roof loads
Open the package →
Portal frames standing during erection on a cold site Photo

Commercial and community

Self-Storage Buildings

Single-story self-storage and flex-unit buildings with repeated bays, roll-up doors and hallway layouts.

Upper floors and mezzaninesInsulated or conditioned
Open the package →
Space-truss roof being erected over a large food processing hall Photo

Commercial and community

Churches & Assembly Buildings

Worship centers, fellowship halls and event spaces with an open sanctuary and classrooms or offices alongside.

Wide clear spanInsulated or conditioned
Open the package →
Six-story steel frame seen from the front, floor deck in place Photo

Commercial and community

Community & Recreation Halls

Steel-framed community centers, gyms, church halls and recreation buildings for towns, nonprofits and parks departments.

Wide clear spanInsulated or conditioned
Open the package →
Looking up at curved steel roof trusses spanning a wide hall Photo

Commercial and community

Sports Facilities & Indoor Arenas

Long clear spans for gyms, field houses, indoor courts and riding arenas, with no columns on the playing surface.

Wide clear spanEquipment and roof loads
Open the package →
Curved long-span trusses being set during erection Photo

Energy, aviation and rural

Aircraft Hangar Buildings

Long-span hangars for private, corporate and maintenance use at general aviation airports.

Wide clear spanCranes and heavy loadsHarsh exposure
Open the package →

Not on the list? Build a custom package or send the drawings for any structural steel job.

The written scope

What a package includes, and what it does not

Every quotation lists exactly what World Steel supplies. This is the shape of that list for any package, before it is sized to your project.

In every package

  • Primary frame: columns, rafters and bracing
  • Secondary steel: purlins, girts and eave struts
  • Roof and wall panels with trims and flashings
  • Anchor bolts, connection bolts and fasteners
  • Design calculations to US code loads
  • Shop and erection drawings at no extra charge

Added when the building needs it

  • Crane runways and crane brackets
  • Mezzanines, platforms and upper floors
  • Insulated roof and wall panels
  • Canopies, overhangs and entrance roofs
  • Overhead doors, louvers and skylights
  • Hot-dip galvanizing or a special paint system

Stays with the US contractor and other trades

  • Foundations and anchor bolt setting
  • Erection and site work
  • Drawing approval, the PE seal and the permit
  • Cranes, MEP and process equipment
  • Fire protection and specialist systems

Add-ons by package

The add-ons each building type usually carries

Every add-on can go on any package. This table shows where they are common, so you can see at a glance what a typical scope for your building type looks like.

Common on this packageAvailable on requestCranes, doors and panels are sized to each project; the Engineer of Record sets the design basis.

From package to steel on site

How a package becomes your quote

A package is a starting scope, not a fixed kit. It is sized to your layout, loads and site before anything is priced.

  1. Pick the closest package

    Each one sets out the usual uses, the frame, the envelope and the add-ons, with what is excluded.

  2. Send the layout and the site

    Size, loads, doors, equipment and the address. A sketch is enough to begin.

  3. Get a written scope and quote

    Exactly what World Steel supplies, checked against US code loads by our engineers.

  4. Approve the drawings

    Shop drawings included at no extra charge; your Engineer of Record approves them.

  5. Receive it in erection order

    Packed by building, phase or zone and shipped to your US port, tracked in PEB Studio.

Who does what

We make the steel. Your US contractor builds it.

Every package splits the same way, whichever building it is. World Steel designs, fabricates and ships; the US contractor, our customer, takes it from the port to a finished building.

World Steel

  • Design and calculationsDesigned to IBC and ASCE 7 loads with AISC 360 and AISI S100, or the basis your Engineer of Record sets.
  • Shop drawingsErection and shop drawings for every package, issued for your approval.
  • Fabrication in our own plantCut, drilled and welded in Vietnam, with laser cutting of plate up to 100 mm thick.
  • Tracking in PEB StudioShop progress, drawings and quality records online, in real time.
  • Packing and shippingPiece-marked and packed in erection order, shipped to the US port that suits your site.

The US contractor, our customer

  • Drawing approvalReviews and approves the design and shop drawings with the Engineer of Record.
  • PE seal and permitArranges the PE seal and the building permit in the project state.
  • Foundations and erectionBuilds the foundations and erects the steel from our erection drawings.
  • Site and inland logisticsRuns the site, receives the loads and coordinates the inland leg with us.
How the contractor partnership works →

Real World Steel photos

Every package is fabricated on the same shop floor

Built-up members, trusses, columns and frames for every building type go through one plant in Vietnam: fitted, welded, checked, coated, packed and loaded.

Operator checking web and flange plates set in blue H-beam assembly jigs Photo
Crew assembling a large steel truss on the shop floor Photo
Quality inspector taking dimensions on a finished steel member Photo
Primed column with its bolted end plate set on painting stands Photo
Coated frame parts with welded brackets in the paint hall Photo
Fabricated members lined up along a railed walkway Photo
Rows of labeled steel bundles ready to leave the plant Photo
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air Photo

Asked by US contractors

Steel building package questions and answers

Choosing a package 3 answers

What is a steel building package?

A starting scope for one building type: the steel frame, the roof and wall envelope and the usual add-ons, with what is excluded. It is not a fixed kit; we size it to your layout, loads and site and send a written scope and quotation.

How do I choose the right package?

Start from what the building must do: span, cranes, temperature, upper floors, open sides or harsh exposure. The finder on this page narrows the list. If two packages fit, send the layout and we propose the one that suits it.

Can a package be changed?

Yes. Sizes, loads, bay spacing, doors and add-ons are all set for each project. A package only gives the scope a starting point.

Large projects and campuses 3 answers

Can World Steel supply several buildings or a whole campus?

Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month, several projects move through the shop in parallel, and buildings are packed and shipped building by building or phase by phase, with production slots confirmed in the quote. Our largest single job so far is about 5,000 t.

Can one project mix several packages?

Yes. A plant with a warehouse, an office wing and a truck canopy is quoted as one project, with one design team and one set of details across the buildings.

How is a large job shipped?

Steel is packed by building, phase or erection zone, labeled to the erection drawings and shipped to the US port nearest your site. Progress is visible in PEB Studio from the shop floor to the vessel.

Scope, codes and approvals 3 answers

Do you erect the buildings?

No. World Steel designs, fabricates and supplies the steel. Foundations, erection and site work are the scope of the US contractor, our customer, and the trades they hire.

Who approves and seals the drawings?

Your Engineer of Record reviews and approves the calculations and drawings we prepare. The PE seal and the permit belong to the US contractor and their engineer. World Steel designs and fabricates; it does not seal drawings.

Which codes are the packages designed to?

IBC 2024, ASCE 7-22 and AISC 360 by default, or the edition your jurisdiction uses, with AISC 341 where seismic design calls for it.

Quotes and partnership 3 answers

What do you need for a quote?

The building type, a layout or sketch with the main sizes, the loads you know, doors and equipment, and the site address. A sketch is enough to begin.

Do you publish prices or lead times?

No. Each building is quoted on its own layout, loads and site. Send what you have and we return a written scope and quotation.

We are a US contractor. Can we work with you on more than one job?

Yes. That is what our contractor partnership is for: we set up the details, drawing standards and shipping once, then reuse them on your next job. Become a partner and tell us about the work you have in view.

Open call · US contractors

World Steel is looking for US contractor partners

General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.

You bring

  • Your market and owners
  • EOR approval and permit
  • Foundations and erection

We bring

  • 2,500 t a month, own plant
  • IAS AC472, first in Vietnam
  • Engineering and shop drawings

Have a building or a campus in mind?

Send the layout, the building types and the site address. We match each building to its package, size the steel and send a written scope, made in our plant in Vietnam.

Download center

Documents to download

All documents

Brochures & catalogs