Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Tennessee · State code

Tennessee building codes and permits for structural steel

Tennessee adopts the International Building Code through the State Fire Marshal’s Office, which reviews plans in jurisdictions without their own program. Larger cities and counties that are exempt, including Memphis and Shelby County, Nashville and Davidson County, Knoxville and Chattanooga, adopt and enforce their own editions. Knowing which reviewer you face sets the design basis before the first calculation.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Tennessee site through the East Coast or West Coast ports.

Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Adopting body
State Fire Marshal’s Office
Exempt cities
Adopt and enforce their own editions
Loads
ASCE 7 as referenced by the adopted IBC
Our part
Code basis on the first calculation sheet

Why it matters

One state, several code editions

Two Tennessee sites an hour apart can sit under different code editions and different plan reviewers. The adopted IBC edition decides which ASCE 7 edition sets the wind, snow and seismic loads, and local amendments can add requirements for the envelope, fire protection or special inspections.

We start every Tennessee project by stating the jurisdiction, the adopted edition and the loads on the first sheet of the calculations. Your Engineer of Record confirms them, and the steel design, connections and drawings follow from there.

Who does what

The permit path, split clearly

World Steel prepares

  • Steel design to the adopted IBC and ASCE 7
  • Design calculations and drawings for review
  • Tekla shop and erection drawings, included
  • Anchor bolt layouts and foundation reactions
  • Mill certificates and fabrication records

The US contractor arranges

  • Engineer of Record review, approval and PE seal
  • Submittal to the State Fire Marshal or the city
  • Special inspections on site under IBC Chapter 17
  • Foundations, erection and site work
  • The building permit and certificate of occupancy

What we check first

Four questions before the first calculation

Which jurisdiction?

State review or an exempt city or county with its own program.

Which edition?

The IBC edition adopted there and the ASCE 7 edition it references.

Which seismic category?

Set from the soils, especially in West Tennessee.

Which inspections?

Special inspections the reviewer expects for the steel.

What we do not claim

World Steel holds no Tennessee approval, registration or engineering license. Drawing approval, the PE seal, plan review and the permit stay with the US contractor and the Engineer of Record.

Tennessee ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Tennessee contractors

Tennessee contractors: let’s win the next project together

If your next bid involves state code and permits, World Steel wants to be your long-term, win-win steel partner in Tennessee. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Tennessee project is cut, welded, inspected and packed.

Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Office block of World Steel standing between two fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Reception and lobby of the World Steel head office in Ho Chi Minh City, with the World Steel sign and framed certificates
World Steel head office, 55 Le Thuc Hoach Street, Ho Chi Minh City: where visitors meet our engineers.
Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.

Q&A

What Tennessee buyers ask

Who reviews my plans in Tennessee?

The State Fire Marshal’s Office in jurisdictions without their own program, or the exempt city or county where the site is. We confirm which applies before design starts.

Which ASCE 7 edition applies?

The one referenced by the IBC edition adopted for your site. We state it on the calculations and your Engineer of Record confirms it.

Do you provide sealed drawings?

No. We provide calculations and drawings for your Engineer of Record, who approves them and applies the PE seal.

Official sources: Tennessee State Fire Marshal’s Office: codes enforcement

Tennessee solutions

Every Tennessee guide

Related pages

Code facts on this page summarize Tennessee practice, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Tennessee?

Send the drawings or the site address, size and use. We set the Tennessee design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.