Indiana · RV plants
Structural steel for Indiana RV and trailer plants
Elkhart County and its neighbors build most of the recreational vehicles made in the United States, along with trailers and specialty vehicles. Their plants are long halls where units move down a line and leave through large doors, often with cranes overhead and offices on mezzanines. Lake-effect snow sits on the roofs every winter.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port, rail and truck to your Indiana site.
- Cluster
- Elkhart, LaGrange, Kosciusko
- Buildings
- Long production halls
- Key details
- Large doors, crane rails
- Our part
- Expandable frames
Why it matters
Long lines, big doors, quick expansions
An RV line needs length and clear width, and every finished unit leaves through a large door. Many openings in the walls change how the frame and bracing work, so door positions are fixed before the steel is designed.
Demand in the RV industry rises and falls quickly, so plants expand in bursts. We design end walls to come off and frames to extend, and release added bays fast when the next expansion comes.
What we design and fabricate
Steel for RV plants
Large openings
Framed openings with reinforcement for big doors.
Crane rails
Runways for light cranes along the line.
Mezzanines
Offices and parts storage above the floor.
Snow-rated roofs
Purlins and frames for the northern snow.
Who does what
RV plant steel, split clearly
World Steel supplies
- Frame, crane rail and mezzanine design or detailing
- Framed openings for every door
- End walls designed for future expansion
- Steel released in erection order
- Tekla shop and erection drawings, included
The US contractor arranges
- Line layout and door schedule from the owner
- Slab, pits and foundations
- Engineer of Record approval and PE seal
- Design release and local permit
- Erection and site work
Indiana
What we do not claim
World Steel names no RV or trailer maker as a customer and claims no completed Indiana plant.
Indiana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Indiana contractors
Indiana contractors: let’s win the next project together
If your next bid involves RV and trailer plants, World Steel wants to be your long-term, win-win steel partner in Indiana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Indiana project is cut, welded, inspected and packed.
Q&A
What Indiana buyers ask
Can you frame many large doors in one wall?
Yes. We design the openings and their reinforcement with the frame and bracing so the wall still carries wind.
Can a plant be extended later?
Yes. We design end walls and frames so new bays bolt on, with the added loads allowed for.
Can you add a light crane along the line?
Yes. We design or detail runway beams and brackets for the crane data you provide.
Official sources: Indiana Economic Development Corporation
Indiana solutions
Every Indiana guide
Related pages
Code facts on this page summarize Indiana practice, the Indiana Building Code, the state Construction Design Release, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the reviewing authority confirm the code and edition in force for your project.
Building in Indiana?
Send the drawings or the site address, size and use. We set the Indiana design basis with your Engineer of Record, design or detail the steel ready for the state design release and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.