Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Oregon · Structural code

Structural steel and the Oregon Structural Specialty Code

Oregon adopts one structural code for the state. The Building Codes Division takes the IBC with Oregon amendments as the Oregon Structural Specialty Code, and the local building department or the state reviews plans and inspects the work. Oregon also adopts its own energy efficiency code, which shapes the envelope the steel supports.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Portland or Seattle–Tacoma for your Oregon site.

Office block of World Steel standing between two fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Statewide code
OSSC, IBC based
Adopted by
Building Codes Division
Plan review
Local or state
Our part
Code edition on sheet one

Why it matters

One code, a seismic state

The same structural code applies from Astoria to Ontario, but the hazards change completely across the Cascades: earthquakes govern the frame in the west, snow and wind in the east. Site class from the geotechnical report decides how strongly the ground shakes, so it is fixed before the steel is sized.

We confirm the edition, the site class and the Seismic Design Category with your Engineer of Record before modeling, state the code basis and loads on the first calculation sheet, and answer the reviewer’s questions on the steel through your team.

Design basis

What the steel design states

The items we confirm with your Engineer of Record before modeling.

ItemWhat we state
Code editionThe OSSC and the IBC edition it adopts
SeismicSite class, Seismic Design Category and the lateral system
WindASCE 7 wind speed, exposure and risk category
SnowGround snow and drift for the site
EnvelopeGirt and purlin details for the energy code

Who does what

Code work, split clearly

World Steel supplies

  • Steel design or detailing to the stated code basis
  • Calculations and drawings for plan review
  • Answers to reviewer comments on the steel
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The building permit application
  • Engineer of Record approval and PE seal
  • Geotechnical report and site class
  • Special inspections and local inspections
  • Foundations and erection

Oregon

What we do not claim

World Steel holds no Oregon approval and no Oregon engineering registration, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building department.

Oregon ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Oregon contractors

Oregon contractors: let’s win the next project together

If your next bid involves Structural Specialty Code, World Steel wants to be your long-term, win-win steel partner in Oregon. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Oregon project is cut, welded, inspected and packed.

Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Reception and lobby of the World Steel head office in Ho Chi Minh City, with the World Steel sign and framed certificates
World Steel head office, 55 Le Thuc Hoach Street, Ho Chi Minh City: where visitors meet our engineers.

Q&A

What Oregon buyers ask

Does the same structural code apply across Oregon?

Yes. The Oregon Structural Specialty Code is adopted for the state and enforced by local building departments or the state.

Why does the site class matter?

It sets how strongly the ground shakes at your address, which decides the seismic loads and often the lateral system.

Can you answer plan review comments?

Yes. We answer comments on the steel design and revise drawings through your Engineer of Record.

Official sources: Oregon Building Codes Division

Oregon solutions

Every Oregon guide

Related pages

Code facts on this page summarize Oregon practice, the Oregon Structural Specialty Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Oregon?

Send the drawings or the site address, size and use. We set the Oregon design basis with your Engineer of Record, design or detail the steel to the Oregon Structural Specialty Code and for Cascadia seismic hazard, snow and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Portland or Seattle–Tacoma for the truck to your site.