Building package · Equipment shelter

One kit design. Every site.

An equipment shelter is small, but a program of them is not. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, designs one bolted kit around your equipment, adapts it to each site’s loads and packs a separate, labelled kit for every site your US contractor builds.

ROOF PANELS FRAMES · PURLINS · GIRTS WALL + LOUVER ANCHOR BOLTS

Shipping label

Ship from
World Steel plant, Vietnam
Contents
Frames, girts, purlins, panels, louvers, bolts
Packed
One kit per site, labelled
Capacity
2,500 t (5.5 million lb) a month

What are you sheltering?

Start from the equipment, not the building

Each kind of equipment asks something different of the steel: air, access, a wide door or a coating for a wet site. Pick yours and open the parts behind it.

Steel members strapped in bundles and loaded for shipping at the World Steel plant Photo · Our plant

Bolted, marked, packed

Every member has a mark, every mark is on the drawing.

The frames, girts, purlins, panels and bolts for one shelter are packed as one kit and listed on its packing list. The crew on site opens one kit and builds one shelter.

How our shop drawings work →

The equipment shelter ecosystem

Which parts each shelter usually takes

A starting point, not a rule. Column heads open each product; the final list comes from your equipment data and site.

Parts usually included for each kind of equipment shelter
EquipmentRigid frameLouversRoof ventilatorsWide doorGalvanizingAnchor bolts
Generators Usually included Usually included Often added Often added Often added Usually included
Switchgear and transformers Usually included Often added Often added Not usual Not usual Usually included
Pumps and wells Usually included Often added Usually included Often added Usually included Usually included
Compressors and blowers Usually included Usually included Usually included Often added Often added Usually included
Vehicles and stored gear Usually included Not usual Often added Usually included Often added Usually included

Before we design

The site sheet behind every shelter

A shelter is small, but its site can be anywhere: a windy ridge, a snowy pass, a salty coast. These are the lines we fill in for each site, and what each one changes in the steel.

Shelter site sheetOne per site
  • Wind speed and exposureSets the frame, the girts and the door design.
  • Ground snow loadSets the roof members and drifting at equipment.
  • Seismic dataSets bracing and the anchorage of heavy equipment.
  • Equipment weights and footprintsSets floor framing, platforms and hung loads.
  • Doors and the swap-out pathSets openings sized for the largest unit.
  • Louvers and ventilationSets framed openings in the walls and roof.
  • Cable and conduit entriesSets entry plates and wall penetrations.
  • Exposure and coatingSets paint or hot-dip galvanizing for the site.

Send the site list and the equipment schedule; we return the loads we used for each site with the quotation.

Large projects

Many sites? One approved design.

A utility, telecom or data center program needs the same shelter in many places. We design it once, adapt it to each site’s wind, snow and seismic loads, and pack every site’s kit on its own, from a plant that fabricates 2,500 t (5.5 million lb) of steel a month.

Bundled steel members lifted by an overhead crane in the shop Photo Bundled by the set
Stacked steel members on a trailer ready to leave the plant Photo Ready to leave
Blue steel members packed tightly inside a shipping container Photo Packed in the container
Blue primed members stacked and tagged before packing Photo Tagged member by member

Projects outside the US, shown for the packing; they are not equipment shelters or US sites.

Fabrication capacity

A whole shelter program, from one plant

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

Real World Steel frames

Small frames, built like big ones

Built-up members welded from plate and primed in our plant, then bolted up on site. Tap a photo to open it full size.

Crane lifting a steel roof frame onto columns of a small building Photo Frame by crane
Blue primed steel columns and rafters laid out in the shop Photo Blue frames in the shop
Row of blue built-up steel members on the shop floor Photo Built-up and primed
Small clad steel building beside houses seen from a drone Photo A small building, finished
Steel portal frames standing on a snowy site Photo Up in the snow

Projects outside the US, shown for the structure type; they are not US sites.

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

The worry: “Will steel designed overseas pass US plan check?”

Designed to US codes, ready for your engineer’s review

We design to the code your jurisdiction enforces: IBC 2024 and ASCE 7-22 by default, AISC 360 and AISC 341 for steel, plus state codes such as the California Building Code. Our calculations and drawings go to your Engineer of Record for review and approval, and the PE seal and permit stay with the US contractor, our customer.

The worry: “I can’t see the quality from across the Pacific.”

An accredited plant you can inspect, live

Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, with written inspection procedures audited by IAS. Your special inspector or owner’s representative can visit, or inspect remotely over live video, and every QC release is logged with photos.

The worry: “Will the materials be traceable to the grade on the drawings?”

Mill certificates by heat number

Steel is ordered to the ASTM grades you specify, mainly from mills in Vietnam. Plate and sections are stored by grade and heat number, and you receive EN 10204 type 3.1 mill certificates traced to the members they went into, with Charpy V-notch results when your project asks for them.

The worry: “What if pieces don’t fit when they reach the site?”

Modeled, approved, then measured

Every member is modeled in Tekla Structures and cut only after you approve the shop drawings, which are included at no extra charge. QC checks dimensions, holes and end plates against the drawing before a piece is released.

The worry: “How will I know where my order really is?”

Real-time tracking in PEB Studio

You follow your own members through cutting, welding, coating, QC release, packing and loading in PEB Studio, online, at any hour. No waiting for a weekly email to find out what happened.

The worry: “Ocean freight scares me: damage, missing pieces, a port I don’t know.”

Packed in erection order, listed per container

Steel is bundled and tagged in your erection sequence, with a packing list and photos for every container or breakbulk load. The quote names the US port of discharge, and the shipment is planned backward from your site date.

The worry: “Who handles customs and duties?”

Incoterm and importer of record in writing

Every quote states the Incoterm and who acts as importer of record, so nobody is surprised at the port. Our Section 232 page explains how US import rules apply to fabricated steel, from official sources only.

The worry: “Time zones and language will slow everything down.”

One English-speaking project manager

Our engineers and project managers work in English and in US units on request. One project manager owns your job from approval drawings to the last container, and our US office is in Westminster, California.

The worry: “Who erects it, and who stands behind the field work?”

Your US contractor erects, with our drawings

World Steel supplies the steel structure only; we never erect. Our customers are US contractors: erection and field work are their scope, done from our erection drawings and piece marks, with our engineers on call for questions from the field.

The worry: “Who is responsible for the design?”

Scope split agreed before you sign

We put the split in writing: full design by World Steel, or a delegated design such as connections under your Engineer of Record, who keeps overall responsibility. You see exactly what we design and what stays with your team.

  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

Generators, switchgear and pumps need a roof and walls that stay put in the storm the equipment is there for. These shelters are small, fully bolted and quick to set on a pad. We pick louvers, access doors and the coating system from what the shelter protects and the exposure at the site.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Secondary Framing

Roofing System

Wall & Cladding System

Connections & Anchorage

Corrosion Protection

Drainage & Weather Protection

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.

Talk to an engineer

Send the equipment list and the sites.

Our engineers work in English. We design one kit around your equipment, check it for each site and send a written scope for the steel.

Asked by utilities and contractors

Equipment shelter questions and answers

12 answers on equipment, remote sites, programs and scope.

Design for equipment 3 answers

How do you handle air for generators and compressors?

The mechanical engineer gives us the louver areas and where they go. We frame the openings, add girts around them and can supply louvers and roof ventilators with the building.

Can equipment be swapped out later?

Yes, if it is planned in. A wide door, a removable wall bay or a roof opening can be framed so a unit can come out without cutting steel. Tell us how the equipment will be replaced.

Do you supply the generator, switchgear or pumps?

No. The equipment and its installation belong to their own contractors. We supply the steel building around it.

Exposed and remote sites 2 answers

Can the frame be galvanized for coastal or wet sites?

Yes. Hot-dip galvanized framing is available on request, and the coating system is set for the site’s exposure.

Is the kit easy to erect on a remote site?

Every member is bolted, marked and listed on the erection drawings, and the kit for each site is packed on its own, so the crew opens one set and builds one shelter.

Many sites, one design 1 answer

Can you supply shelters for many sites at once?

Yes. Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month. A utility or telecom program can use one approved design, adapted for each site’s wind, snow and seismic loads, with each kit packed and labelled for its own site and production slots confirmed in the quote.

What we need for each site 3 answers

What do you need to quote a shelter program?

A list of sites with addresses, the equipment in each shelter with weights and footprints, door and ventilation needs, and any utility or owner standards. From each address we take the wind, snow and seismic loads for that site.

Can one design cover sites with different wind and snow?

Yes. One base design can be checked for the worst site, or a small set of variants made for groups of sites, so most parts stay the same across the program. Your Engineer of Record approves the approach.

Can cable entries and wall openings be planned?

Yes. Cable entry plates, conduit openings and wall penetrations are framed where the electrical design puts them, so no girts are cut on site.

Codes, buying and erection 3 answers

Which codes do you design to?

IBC 2024, ASCE 7-22 and AISC 360 by default, or your jurisdiction’s edition. Your Engineer of Record approves the drawings, and the PE seal and permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

Do you erect the shelter?

No. World Steel designs, fabricates and supplies the steel building. Foundations, erection, equipment setting and site work are the scope of the US contractor, our customer.

Do you publish prices?

No. Send the equipment list, the size and the site addresses and we return a written scope and quotation.