Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

For modular and offsite builders

Steel frames made the same way, unit after unit

A modular line runs on repetition. World Steel details your members and connections once, fabricates them in batches with inspection records for each run, and sizes them around road and container limits, at a plant output of 2,500 t a month.

  • Identical units held to repeatable tolerances
  • Frames sized for road and container limits
  • Production runs with inspection records

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

Rows of identical fabricated steel members in the World Steel plant

Large-project capacity

2,500 t of structural steel a month

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.

How large jobs run

Before and after

From the usual steel problem to the World Steel way

Tolerance driftUnit 200 has to fit like unit 1.
Detailed once, repeatedMembers and connections modeled once in Tekla and repeated.
Transport limitsRoad and container dimensions set the module.
Tolerances held in mmJigs and dimensional checks on every batch.
A line that must keep movingParts arriving by sea must arrive in time and complete.
Sized to shipFrames sized around container and road limits.
And one more thing you get:
Records per runInspection records for each production batch.

Repeat program

One unit, repeated

How a repeat program runs through our shop.

One unit, repeated

  1. Model onceOne Tekla model of the unit, its members and connections.
  2. Batch cuttingMembers cut and drilled in batches on CNC lines.
  3. Jig fit-upFit-up in jigs so every unit matches.
  4. Batch inspectionDimensional and weld checks recorded per batch.
  5. Kit packingPacked by unit or by line feed, as your plant needs.

Request a quotation · Modular Building Companies

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Explore repeat-unit steel supply
Become our partner in the US Repeat programs can run under one master supply agreement, set up for each program, with a fixed engineering contact. Contractor Partnership Program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that modular building companies use most, each with its own page to read before you call.

Ecosystem for Modular Building Companies

  • Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
  • Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What modular building companies ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Explore repeat-unit steel supply
Can you hold tolerances across a long run?

Yes. Members are fabricated in jigs and checked dimensionally per batch, with tolerances stated in mm on the drawings.

How are frames sized for transport?

Module and member sizes are set around the container and road limits you give us, before detailing starts.

Can parts be packed per unit?

Yes. Kits can be packed per unit or per production line feed.

Do you supply connections for plant or field assembly?

Yes. Bolted or welded connections are detailed for assembly in your plant or on site.

What volume can you support?

About 2,500 metric tons of structural steel a month, with batches scheduled to your production plan.

Who approves the design?

Your Engineer of Record. World Steel prepares calculations and drawings for review and approval.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.