Wind, snow & seismic engineering

Engineered for the loads at your address, not a national average

A distribution center in Houston, a plant in Minnesota and a warehouse in the Bay Area face different design events. We pull the ASCE 7-22 hazard values for each site and check every frame, purlin and anchor rod against the combination that controls.

  • ASCE 7-22 hazard data for your coordinates
  • Every load combination run in SAP2000
  • AISC 341 and AWS D1.8 where seismic requires
Snow + drift WindUplift Seismic Anchor rods
Drawing, not to scale: the three load families a US frame is checked for.

The engineering problem

Three load families, one frame

Across the US a steel structure is usually governed by one of three things. A light steel frame attracts far less seismic force than concrete, so wind or snow often sets member sizes, but brittle connections can still fail in an earthquake. We run every ASCE 7-22 combination and design each element for the case that governs.

Wind

Often governs in

Gulf and Atlantic coasts, the Great Plains and open exposures

What it sizes

Purlins, girts, fasteners, frames, bracing and anchorage against suction and uplift

Snow

Often governs in

Northern states, the Rockies, the Northeast and high elevations

What it sizes

Rafters, purlins and roof steps where snow piles, slides or drifts

Seismic

Often governs in

California and the West Coast, the Intermountain West, Alaska and the New Madrid zone

What it sizes

Bracing, connections, drift and anchorage, and the ductility of the whole system

Designed to: IBC ASCE 7-22 AISC 360 AISC 341 AISI S100 AWS D1.8

Our design sequence

How each load family is checked

Wind design sequence

  1. Agree the criteria first

    Risk category, basic wind speed for the site coordinates, exposure category, topographic factor and enclosure classification go into a written design basis your Engineer of Record signs off.

  2. Run the frame analysis

    Rigid frames, bracing and wind columns are modeled in SAP2000 for every ASCE 7-22 combination, including net uplift where suction beats the dead load.

  3. Zone the roof and walls

    Components and cladding pressures climb at corners, eaves and ridges, so purlin spacing, girt spacing and fastener patterns change zone by zone.

  4. Design the openings

    A failed overhead door turns an enclosed building into a partially enclosed one. Door design pressures, jamb and header framing and, in wind-borne debris regions, opening protection are part of the package.

  5. Check tornado loads where required

    ASCE 7-22 adds tornado design for Risk Category III and IV buildings in the tornado-prone regions it maps. We apply it when your occupancy and site call for it.

  6. Trace the uplift path

    Panel to purlin, purlin to rafter, rafter to column, column to anchor rod: each connection is checked, and base reactions go to your foundation engineer in kN and kips.

Snow design sequence

  1. Start from the ASCE 7-22 ground snow

    ASCE 7-22 maps ground snow by site and risk category. State or county case-study values are used where your jurisdiction requires them.

  2. Balanced and unbalanced roof snow

    Flat roof snow, exposure and thermal factors, and the unbalanced case on gable roofs are each checked against the frame.

  3. Drift at steps and parapets

    Snow drifting against a higher roof, parapet or rooftop unit is calculated and the purlins and rafters under the drift are reinforced.

  4. Sliding snow and adjacent buildings

    Snow sliding off a higher roof onto a lower one, or onto a new building beside an existing one, is added where geometry allows it.

  5. Rain-on-snow and ponding

    Low-slope roofs are checked for rain-on-snow surcharge and for ponding stability of the secondary framing.

Seismic design sequence

  1. Find the Seismic Design Category

    Mapped spectral values from ASCE 7-22, the site class in your geotechnical report and the risk category set the SDC, from A in much of the East to D, E or F near active faults.

  2. Pick a permitted system

    Ordinary or intermediate moment frames, or braced frames, are selected within the height limits and system rules ASCE 7 gives for that category.

  3. Apply AISC 341 where required

    When the system calls for seismic detailing, members and connections are proportioned so yielding happens where it was planned and connections stay stronger than the parts they join.

  4. Weld to AWS D1.8

    Demand-critical welds in seismic force-resisting frames are made with AWS D1.8-qualified procedures and welders.

  5. Check drift and P-delta

    Story drift and second-order effects are verified, with extra attention to mezzanines, crane runways and rooftop units.

  6. Size the anchorage

    Base plates, anchor rods and brace connections are designed for the larger of the wind and seismic reactions.

Analysis in SAP2000; the 3D model, connections and drawings in Tekla Structures, with an IFC export for your BIM coordination.

Across the United States

Which load tends to lead, region by region

A general guide only. The governing case on your job comes from your exact coordinates, risk category and soils report, never from a state average.

Steel solutions by state
RegionWindSnowSeismicWhat to watch
Gulf Coast and Florida ●● ○ ○ Hurricane winds and wind-borne debris regions
Atlantic seaboard ●● ● ○ Coastal wind, with snow in the mid-Atlantic and New England
Great Plains and Texas Panhandle ●● ● ○ Open exposure; tornado loads for critical facilities
Upper Midwest and Great Lakes ● ●● ○ Ground snow and drift at roof steps
Rocky Mountains and high elevations ● ●● ● Heavy snow; elevation and site studies matter
California and the Pacific Northwest ● ● ●● High seismic design categories near active faults
New Madrid and Charleston zones ● ● ●● Seismic detailing in otherwise moderate climates

●● often governs · ● often checked · ○ rarely leads

Lessons from damage surveys

Six weak spots we design out

Engineering reviews after US hurricanes, tornado outbreaks and heavy snow winters keep finding failures in the same places.

Roof corners and edges

Tighter purlin spacing and added fasteners in high-suction zones, with eave and rake trims fixed so they cannot start a peel.

Overhead and sliding doors

Doors specified for the same design pressure as the building, and framed openings designed for the door reactions.

Snow drifts at steps

Drift loads at parapets, roof steps and adjacent buildings are calculated, and framing is reinforced where the drift lands.

Corroded fasteners

Coatings and fastener finishes chosen for coastal air, de-icing salts or process exposure, because a corroded screw has lost capacity.

Missing bracing

Every brace rod, flange brace and connection is shown with its piece mark on the erection drawings, so nothing is left in the crate.

Undersized anchorage

Anchor rod plans and base reactions are issued early, so the foundation is designed for real uplift and shear.

Curved long-span trusses being set during erection Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.

Transparency

Inputs listed in your calculation package

We do not publish one wind speed, snow load or seismic value for a state, because each depends on the exact site and risk category. Your calculations name every input and its source.

Design basis · input registerASCE 7-22
Code edition and local amendmentsIBC 2024 with ASCE 7-22, AISC 360 and AISI S100 by default, or the edition your jurisdiction has adoptedEngineer of Record with the building department
Basic wind speed and exposureASCE 7-22 hazard data for the site coordinates and risk categoryEngineer of Record
Ground snow loadASCE 7-22 snow data for the site, plus any state or county case-study valuesEngineer of Record
Seismic ground motions and site classASCE 7-22 mapped values and your geotechnical reportEngineer of Record and geotechnical engineer
Collateral and equipment loadsYour brief: ceilings, sprinklers, HVAC, solar arrays, cranes, mezzaninesOwner and design team
Exposure for coatingsDistance to salt water, de-icing salt use, process environmentOwner and Engineer of Record

What we will not claim

We never sell a building as hurricane-proof, tornado-proof or earthquake-proof. Real performance depends on the design criteria, the foundation, the erection work and the maintenance that follows.

World Steel designs, fabricates and supplies the steel structure. Your Engineer of Record reviews and approves our calculations and drawings, and the US contractor, our customer, handles the PE seal, the permit, the foundations and the erection.

Asked by US contractors

Questions on wind, snow & seismic design

Which wind speed will you use for my building?

The ASCE 7-22 basic wind speed for your site coordinates and the building’s risk category, confirmed by your Engineer of Record. A fire station and a warehouse on the same road can carry different values.

Do you design for snow drift as well as flat roof snow?

Yes. Ground snow load, flat roof snow, drift at steps and parapets, sliding snow, unbalanced loads and rain-on-snow are all checked where ASCE 7-22 requires them.

What software do your engineers use?

SAP2000 for structural analysis and Tekla Structures for the 3D model, connections, shop drawings and erection drawings. An IFC export is available for your BIM coordination.

Can the calculations go into my permit submittal?

Yes. We prepare the calculation package and drawings for your permit set. Your Engineer of Record reviews and approves them, and the PE seal and the submittal stay with the US contractor, our customer.

Do you handle high seismic regions?

Yes. Where the system requires seismic detailing, members and connections follow AISC 341, and seismic frames are welded with AWS D1.8-qualified procedures and welders.

Will a lighter frame still meet code?

Value engineering starts from the governing load case, not from a safety margin added everywhere. Every alternative comes with calculations, and your Engineer of Record decides.

Keep reading

Next in how we work

World Steel designs, fabricates and supplies the steel structure. You, the US contractor and our customer, erect it, and with your Engineer of Record approve the drawings and handle the PE seal and the permit.

Send your address, get loads that fit it

Share the site address, occupancy and drawings. Our engineers set out the ASCE 7-22 design basis for your Engineer of Record and size the steel to the case that controls.