Where it sits in the US code stack
Where it governs in your building
Design Guide 25 and Design Guide 7
Two volumes every tapered frame and crane bay is checked against
Each guide answers a question AISC 360 leaves open for metal buildings. On the left, how to check a member whose depth changes; on the right, how to design a building that carries an overhead crane.
Frame design using web-tapered members
- Tapered segments modeled as built, not as uniform members
- Stability through second-order analysis of the whole frame
- Flexure, compression and combined checks at stations along each taper
- Flange bracing points read from the purlin and girt layout
- Local buckling limits for thin webs and wide flanges
Industrial buildings: roofs to anchor rods, crane runways and crane columns
- Wheel loads, vertical impact and lateral and longitudinal crane forces
- Runway girder sizing with cap channels or heavier top flanges where needed
- Fatigue at welds that see thousands of load cycles
- Runway deflection and frame drift at crane level for the crane class
- Stepped, bracket or separate crane columns chosen by capacity
Other AISC Design Guides often cited on metal buildings
Base plate and anchor rod design
Serviceability design considerations
Extended end-plate moment connections
Flush and extended multiple-row moment end-plate connections
14 answers from our engineers
AISC Design Guides questions and answers
Questions on the two AISC Design Guides behind every pre-engineered frame and crane building: what they are, when they apply, which crane data we need and how fatigue and deflection are handled. Every answer is open below.
About the guides 4 answers
Are design guides mandatory?
No. They are AISC publications that explain accepted ways to meet AISC 360. Reviewers often cite them, and using them makes plan review faster.
Why use tapered frames at all?
A tapered member is deep where bending is high and shallow where it is low, so less steel carries the same load. Design Guide 25 is how that saving is checked safely.
Which edition of each guide do you follow?
The current AISC edition that matches the AISC 360 edition of your design basis. If your Engineer of Record asks for a particular edition, we work to it and note it in the calculation package.
Do the design guides apply to hot-rolled frames as well?
Design Guide 7 applies to any industrial building with cranes, whatever the members are made of. Design Guide 25 is specific to web-tapered members, so a frame of uniform rolled shapes is checked with AISC 360 directly.
Crane buildings 4 answers
Can a crane be added later?
Yes, if the building is designed for it from the start. Adding one to a frame that was never designed for crane loads usually means new columns or brackets and an IEBC check of the existing frame.
What crane data do you need before design?
The crane maker's data sheet: capacity, span, hook height, wheel loads and spacing, bridge and trolley weights, and the CMAA service class. Estimates are fine for pricing, but final design uses the maker's numbers.
What is the difference between CMAA 70 and CMAA 74?
CMAA 70 covers top-running bridge and gantry cranes with multiple girders; CMAA 74 covers top-running and under-running single-girder cranes. Both define service classes that drive the fatigue and deflection checks on the runway we design.
Can World Steel supply the crane runway beams?
Yes. Runway girders, cap channels, brackets and stops are fabricated in our plant with the frame. The crane itself, its rails and electrification come from the crane supplier unless agreed otherwise in our scope.
Fatigue and deflection 3 answers
Why does fatigue matter for a crane runway but not for a roof?
A roof sees its full snow load a few times in its life. A runway girder sees a loaded crane pass thousands or millions of times. Design Guide 7 has the girder and its welds checked for that repeated stress range, not just for peak strength.
How stiff does a crane runway have to be?
Deflection limits depend on the crane class: lighter for occasional-use cranes, much stricter for heavy production cranes. We use the limits Design Guide 7 recommends for your crane class unless your Engineer of Record sets tighter ones.
What happens at the column when the crane brakes?
Braking and acceleration push the runway along the building. Those longitudinal forces go into dedicated crane bracing in at least one bay, designed with the rest of the lateral system.
Tapered frames 3 answers
Are tapered frames harder to inspect or modify later?
They are inspected the same way: dimensions, welds and coatings against the shop drawings. Modifying them later, for example cutting an opening in a web, needs an engineering check because the depth changes along the member.
Is a tapered frame less stiff than a uniform one?
Not necessarily. Depth is placed where moment and stiffness matter, at the knee. Drift is checked in the analysis like any frame, and the taper is adjusted if a serviceability limit governs.
How does a tapered frame affect shipping from Vietnam?
Lighter members mean fewer tons to ship, and tapered rafters nest well in containers and on flat racks. Member lengths and splice points are set in Tekla against the container or flat rack each piece will ride in.
More answers on every US code we design to: search all standards questions.
Two guides, two jobs
What each guide covers in your building
Design Guide 25: tapered frames
How stability, buckling and combined forces are checked when web depth changes from knee to ridge. This is what lets a tapered rafter put steel only where the moment is.
Design Guide 7: crane buildings
Runway girder design, crane column and bracket layout, lateral and longitudinal crane forces, fatigue at the welds, and the deflection limits a crane needs to run smoothly.
Serviceability for cranes
Runway deflection and frame drift at crane level are checked against limits suited to the crane class, so wheels track and rails stay aligned.
Fatigue at the welds
Runway girders see thousands of load cycles. Weld details are chosen and inspected with fatigue in mind, not strength alone.
Send us this
Crane data we need before sizing a runway
| Item | Why it matters |
|---|---|
| Crane type and capacity | Sets the wheel loads and the class of service |
| Span and hook height | Fixes the runway elevation, column steps and frame height |
| Wheel loads and spacing from the crane maker | The design uses real wheel loads, not estimates |
| Duty class (CMAA 70 or 74) | Drives fatigue checks and deflection limits |
| Number of cranes per bay | Two cranes in one bay change the governing load case |
How we apply them
From analysis model to shop floor
-
Analysis
Frames are modeled in SAP2000 with tapered segments as they will be built, not as uniform members.
-
Checks
Each segment is checked to AISC 360 using the Design Guide 25 approach; crane members follow Design Guide 7.
-
Detailing
Plate thicknesses, stiffeners and brackets are detailed in Tekla so the shop builds exactly what was checked.
-
Welding
Web-to-flange welds run on automated submerged arc lines to AWS D1.1, inspected to your plan.
Who does what with the design guides
Crane bays and tapered frames need data from three places
Design Guide 25 and Design Guide 7 are methods, not loads. The method is ours; the crane data and the approvals come from your side.
World Steel
- Checks tapered frames by the methods of Design Guide 25
- Designs crane runways, brackets and crane columns by Design Guide 7
- Fabricates the built-up members on automated lines
US contractor and crane supplier
- Supply the crane maker's wheel loads, capacity, span and duty class
- Confirm the rail type and the runway tolerances
- Erect the runway and align it to the tolerances on the drawings
Engineer of Record
- Confirms the crane criteria and serviceability limits
- Reviews the frame and runway design
- Approves the drawings
What a reviewer asks
Four questions on crane bays and tapered frames
Each one is answered with the crane data or the stations along the taper.
Where did the crane loads come from?
The crane maker's data sheet is attached, with impact and lateral loads derived from it.
Was fatigue checked on the runway?
Fatigue checks for the runway beam and its welds, for the duty class you confirm.
How was the tapered member checked?
Checks at stations along each taper, with the governing station reported.
What deflection limits apply to the runway?
Vertical and lateral deflection limits for the crane class, listed and checked.
Go deeper
Four pages behind a crane bay
The members the guides check, each on its own page.
Crane runway beams
Runway girders and brackets we fabricate.
Crane runway beams →Crane supporting columns
Stepped and laced columns for crane bays.
Crane supporting columns →Built-up steel sections
Plate girders and tapered members made on our lines.
Built-up steel sections →Steel design
The specification the guides work within.
AISC 360 →
Real photos from World Steel
Tapered frames and crane-bay steel in production
Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.
AISC Design Guides never works alone
The standards and guides it works with
Each link opens the full page, with its own questions and answers.
Scope
The crane itself is designed by its maker to CMAA 70 or 74. World Steel designs the building, runway and brackets that carry it, and can supply overhead cranes made by World Steel with the frame.
Who does what
World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.
Details confirmed in quote Edition: Current editions, as your Engineer of Record accepts
Source record: https://www.aisc.org/publications/design-guides/
Last checked: —. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.
All US codes & standardsPlanning a building with an overhead crane?
Send the crane maker's data sheet, span and hook height. We design the frame, runway and brackets to AISC Design Guide 7 and show every crane load case in the calculations.