“Which port, and how does it get to my site?”
Cargo manifest

Steel industry · Can Tho City, Vietnam · 2024
5,000 tabout 5,500 short tons

CPV Food Processing Factory
Food processing · Dong Nai Province, Vietnam · 2020
2,500 tabout 2,750 short tons

Long Son petrochemical complex
Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022
2,000 tabout 2,200 short tons

M&D (MD Factory)
Warehouse and industrial · Thailand · 2024
2,000 tabout 2,200 short tons

Tongwei Tien Giang feed factory, phase 1
Animal feed · Dong Thap Province, Vietnam · 2018
1,500 tabout 1,650 short tons

New Era cold storage
Cold storage, phase 1 tonnage · Tay Ninh Province, Vietnam
1,000 tabout 1,100 short tons
Logistics for a 300-ton building and for a 5,000-ton plant are not the same job. We plan the large ones lot by lot, from the erection sequence back to the production slot, and these are the packages that line has already moved.
Each lot ships complete for one area of the building, so your crew is never waiting on a missing piece.
Every member carries its piece mark; every bundle and container carries a label that matches its packing list.
Lots, containers, seal numbers and documents appear in PEB Studio as each one is released.
The logistics ecosystem
Who carries the road, sea and inland legs depends on the Incoterm in your contract. The first leg is always ours and the last is always yours.
Fabricated, coated, inspected and released, then packed in erection order on ISPM 15-stamped wood.
About two hours by road from our plant to Cat Lai or Cai Mep, with Vietnam export clearance on the way.
Direct to the West Coast, or mostly through the Panama Canal to the Gulf and East Coasts. We give sea lanes in nautical miles, never in days.
Your importer of record and customs broker file the ISF and the entry; we supply the shipper data and documents early.
From the terminal by truck or rail ramp to your address, booked around the date your crew is ready.
Your team receives, unloads and erects. The handover set closes the job: packing lists, mill certificates and QC records.
Every logistics guide
Open the container that matches your question. Each page goes deep on one topic and links to the next.
WSVN ROU 001307
“Which port, and how does it get to my site?”
WSVN PLA 002614
“Who watches the shipment, and how do I see it?”
WSVN PAC 003921
“How will the steel arrive?”
WSVN TER 005228
“Where does your job end and mine begin?”
WSVN IMP 006535
“What does US Customs need from us?”
WSVN COS 007842
“What will it cost landed, and what do I keep?”
US gateway ports
Distances are illustrative sea lanes from southern Vietnam, rounded to the nearest 100 nmi, not a carrier’s routing or a transit time. Open a port for its terminals and inland reach, or play it in the simulator.
Incoterms® 2020
The term decides who books the freight, who insures it, who imports it and where risk passes. Dark cards are the terms we quote routinely for US projects.
Clear scope
We supply the steel structure and everything the shipment needs to clear. Your importer files with US Customs. The US contractor, our customer, receives and erects.
At our plant in Vietnam
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions
Every member is fabricated in World Steel’s own IAS AC472-accredited plant in Vietnam. It travels about two hours by road to the export port at Cat Lai or Cai Mep and is loaded there. Our Westminster, California office coordinates; it is not a warehouse or yard.
We have a landing page for 16 US gateway ports on the West Coast, Hawaii, the Gulf and the East Coast, from Los Angeles and Seattle to Houston, Savannah and New York and New Jersey. We recommend the port and inland route that fit your site and schedule best.
We do not publish transit days, because sailings, transshipment and port conditions change. Each port page gives the illustrative sea lane in nautical miles, and your quote plans the sailing backward from the date your site needs steel.
Yes. Large packages ship in lots that follow the erection sequence, each with its own packing list, so your crew can start on the first area while later lots are still being fabricated.
Your importer of record and its customs broker. We do not file on your behalf; we prepare the shipper-side data, the commercial invoice, packing lists and mill certificates early enough for your broker to file on time.
FOB, CFR, CIF and DAP are the terms we quote routinely for US projects. DDP is case by case, and the other terms are explained for reference. The quote names the term, the importer of record and who carries any Section 232 duties.
No. World Steel designs, fabricates, packs and ships the steel structure. The US contractor, our customer, receives it, unloads it and erects it, and works with its Engineer of Record on the drawing approval.
In PEB Studio. Lots, containers, seal numbers, packing reports and shipping documents appear as each is released, so your team can plan receiving without chasing anyone by phone.
Send the bid package or just an address and a site date. We come back with the port, the trade term and a shipping plan in lots, from a plant that fabricates 2,500 metric tons of structural steel a month.