Logistics · Vietnam to your US site

Structural steel logistics for large US projects, from one plant to your gate

Packing, sailing, US ports, trade terms, customs and delivery to site: every step of moving thousands of tons of fabricated steel from our plant in Vietnam, explained and planned in one place.

Cargo manifest

Logistics planned for packages of thousands of tons

IAS AC472 plant
Shipper
World Steel plant, Vietnam
Fabrication
2,500 t a month
Export ports
Cat Lai · Cai Mep
Road leg
About 2 hours
  1. Sunpro Steel Factory

    Steel industry · Can Tho City, Vietnam · 2024

    5,000 tabout 5,500 short tons

  2. CPV Food Processing Factory

    Food processing · Dong Nai Province, Vietnam · 2020

    2,500 tabout 2,750 short tons

  3. Long Son petrochemical complex

    Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022

    2,000 tabout 2,200 short tons

  4. M&D (MD Factory)

    Warehouse and industrial · Thailand · 2024

    2,000 tabout 2,200 short tons

  5. Tongwei Tien Giang feed factory, phase 1

    Animal feed · Dong Thap Province, Vietnam · 2018

    1,500 tabout 1,650 short tons

  6. New Era cold storage

    Cold storage, phase 1 tonnage · Tay Ninh Province, Vietnam

    1,000 tabout 1,100 short tons

Logistics for a 300-ton building and for a 5,000-ton plant are not the same job. We plan the large ones lot by lot, from the erection sequence back to the production slot, and these are the packages that line has already moved.

  • Lots by erection area

    Each lot ships complete for one area of the building, so your crew is never waiting on a missing piece.

  • Marked to the drawing

    Every member carries its piece mark; every bundle and container carries a label that matches its packing list.

  • Visible as it happens

    Lots, containers, seal numbers and documents appear in PEB Studio as each one is released.

The logistics ecosystem

From our plant to your gate in six legs, each with its own guide

Who carries the road, sea and inland legs depends on the Incoterm in your contract. The first leg is always ours and the last is always yours.

  1. World Steel

    Plant in Vietnam

    Fabricated, coated, inspected and released, then packed in erection order on ISPM 15-stamped wood.

  2. By Incoterm

    Road to the export port

    About two hours by road from our plant to Cat Lai or Cai Mep, with Vietnam export clearance on the way.

  3. By Incoterm

    Across the Pacific

    Direct to the West Coast, or mostly through the Panama Canal to the Gulf and East Coasts. We give sea lanes in nautical miles, never in days.

  4. Your importer and broker

    US port and customs

    Your importer of record and customs broker file the ISF and the entry; we supply the shipper data and documents early.

  5. By Incoterm

    Truck or rail to site

    From the terminal by truck or rail ramp to your address, booked around the date your crew is ready.

  6. The US contractor, our customer

    Your jobsite

    Your team receives, unloads and erects. The handover set closes the job: packing lists, mill certificates and QC records.

Every logistics guide

Six containers, one for each question US buyers ask

Open the container that matches your question. Each page goes deep on one topic and links to the next.

US gateway ports

16 US ports on the board, sea lanes in nautical miles

Distances are illustrative sea lanes from southern Vietnam, rounded to the nearest 100 nmi, not a carrier’s routing or a transit time. Open a port for its terminals and inland reach, or play it in the simulator.

All US ports

West Coast Direct across the Pacific

Hawaii Central Pacific

Gulf Coast Through the Panama Canal

East Coast Mostly through the Panama Canal

Caribbean Through the Panama Canal · 35 ports

All Caribbean ports and routes Caribbean shipping simulator, plant to island

Clear scope

Who does what between our plant and your site

We supply the steel structure and everything the shipment needs to clear. Your importer files with US Customs. The US contractor, our customer, receives and erects.

World Steel

  • Design, shop drawings and fabrication
  • Coating, QC release and export packing
  • ISPM 15-stamped wood from certified suppliers
  • Commercial invoice, packing lists, mill certificates
  • Shipper data for your ISF
  • Containers and documents live in PEB Studio

Your importer and customs broker

  • Importer of record on the entry
  • ISF filing before loading
  • Customs entry and duties, Section 232 included
  • Bond and broker instructions
  • Freight legs your Incoterm gives you

The US contractor, our customer

  • Site readiness and laydown area
  • Receiving and checking each delivery
  • Unloading at site
  • Erection and site work
  • Drawing approval with your Engineer of Record

At our plant in Vietnam

Where every shipment starts

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Worry-free shipping

You order the building. We take care of the shipping.

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Questions

Logistics questions from US contractors

Where is the steel made, and where does it ship from?

Every member is fabricated in World Steel’s own IAS AC472-accredited plant in Vietnam. It travels about two hours by road to the export port at Cat Lai or Cai Mep and is loaded there. Our Westminster, California office coordinates; it is not a warehouse or yard.

Which US ports can you ship to?

We have a landing page for 16 US gateway ports on the West Coast, Hawaii, the Gulf and the East Coast, from Los Angeles and Seattle to Houston, Savannah and New York and New Jersey. We recommend the port and inland route that fit your site and schedule best.

How long does the ocean leg take?

We do not publish transit days, because sailings, transshipment and port conditions change. Each port page gives the illustrative sea lane in nautical miles, and your quote plans the sailing backward from the date your site needs steel.

Can a large job ship in stages?

Yes. Large packages ship in lots that follow the erection sequence, each with its own packing list, so your crew can start on the first area while later lots are still being fabricated.

Who files the ISF and the customs entry?

Your importer of record and its customs broker. We do not file on your behalf; we prepare the shipper-side data, the commercial invoice, packing lists and mill certificates early enough for your broker to file on time.

Which Incoterms do you quote?

FOB, CFR, CIF and DAP are the terms we quote routinely for US projects. DDP is case by case, and the other terms are explained for reference. The quote names the term, the importer of record and who carries any Section 232 duties.

Do you unload or erect the steel?

No. World Steel designs, fabricates, packs and ships the steel structure. The US contractor, our customer, receives it, unloads it and erects it, and works with its Engineer of Record on the drawing approval.

How do I see where my containers are?

In PEB Studio. Lots, containers, seal numbers, packing reports and shipping documents appear as each is released, so your team can plan receiving without chasing anyone by phone.

Tell us your site, we plan the route

Send the bid package or just an address and a site date. We come back with the port, the trade term and a shipping plan in lots, from a plant that fabricates 2,500 metric tons of structural steel a month.