Protected zones: the steel nobody may weld, drill or fasten to

In a strong earthquake a ductile frame is designed to yield in chosen places. A stray tack weld, a shot pin or a hole for a pipe hanger in that area can start a crack before the steel has done its work. AISC 341 calls these places protected zones, and keeping them clean is a job for every trade on the project.

Defined by
AISC 341-22 for each seismic system
Shown on
Design drawings, shop drawings and erection drawings
Kept clean by
Fabricator, erector and every trade that follows

Where they are

Protected zones by system

Special and intermediate moment frames

The beam ends where the plastic hinge forms, as defined for each prequalified connection in AISC 358.

Special concentrically braced frames

The parts of each brace expected to buckle and yield, and the elements that connect braces to beams and columns.

Eccentrically braced frames

The link, the short beam segment designed to yield in shear or bending.

Buckling-restrained braced frames

The yielding core of each brace and the brace connections as designated.

Ordinary moment frames

AISC 341 designates no protected zones for ordinary moment frames, which covers many tapered metal building frames.

Your drawings decide

The Engineer of Record shows every protected zone on the design drawings, and that is the boundary we fabricate to.

Not allowed in a protected zone

What stays out, unless your Engineer of Record approves it

  • ✓ Welded attachments, clips and erection aids
  • ✓ Tack welds and arc strikes
  • ✓ Holes for pipe, duct or electrical hangers
  • ✓ Powder-actuated pins and screws
  • ✓ Welded shear studs
  • ✓ Sharp notches and flame-cut gouges left unrepaired
  • ✓ Facade, partition and edge-angle connections
  • ✓ Field changes without a written repair procedure

How we keep them clean

From the design drawing to the steel on site

  1. On the shop drawings

    Protected zones are hatched on member details and erection drawings, so the shop and the field see the same boundary.

  2. In the shop

    Clips, holes and shop attachments are placed outside the zones, and QC checks every seismic member before release.

  3. Marked on the steel

    Where the specification asks for it, we mark protected zones on the member so later trades can see them.

  4. Repairs by procedure

    Any discontinuity found in a zone is repaired to a procedure your Engineer of Record accepts, and the repair is recorded.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made. Not stock images.

Quality inspector taking dimensions on a finished steel member Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Coated frame parts with welded brackets in the paint hall Photo
Frame parts with their brackets, coated and drying, World Steel, Vietnam.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Zones on every drawing

Hatched on Tekla shop and erection drawings, included at no extra charge for every project.

Shop QC check

Seismic members are checked for attachments and notches before QC release.

Photos in PEB Studio

Release photos of seismic members you can review online before shipment.

The seismic solution ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

World Steel projects: US codes, Guam, Japan and beyond

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US buyers

Protected zones: questions we hear

Does my metal building have protected zones?

If its frames are ordinary moment frames and its braces are ordinary braced frames, usually not. Special and intermediate moment frames, special braced frames and eccentrically braced frames do. Your drawings will show them.

Can the sprinkler contractor hang pipe from a protected zone?

Not without the Engineer of Record’s approval. Hangers should be placed outside the zone or on members that are not part of the seismic system.

What if someone welds in a protected zone on site?

Tell the Engineer of Record. The attachment is removed and the area repaired to an accepted procedure, then inspected.

Does World Steel provide shop drawings for seismic work?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure, and your Engineer of Record reviews and approves the calculations and drawings.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and standards govern, and your Engineer of Record confirms the criteria for each project.