Transfer towers: a lot of machinery on a small footprint

Where one conveyor hands its load to the next, the steel has to carry a head pulley, a drive, a chute full of moving ore, a dust collector and the hoist that services them, all several floors up. We design transfer towers as compact braced frames with floors laid out from the mechanical arrangement.

Compact, tall, heavily loaded

Why transfer towers need careful framing

A transfer tower is short on plan and long on loads. The head pulley pulls on the frame with the belt tension, the drive pushes torque into its base, and the chute carries the weight and impact of falling material. On a tall tower, wind and seismic forces add to all of that. We lay out the bracing so it misses the chutes and the maintenance drop zones, and size the floor beams for the equipment that actually sits on them.

Towers are often clad to control dust and weather. Wall and roof panels, louvers and access doors can ship with the frame, made in Vietnam, or the frame can be supplied alone for cladding by others.

Inside a tower

What the tower steel carries

Head pulley and drive floor

Heavy framing for the pulley bearings, the drive base and the belt tension.

Chute support steel

Frames that carry chutes, liners and material, with access for liner changes.

Hoist beams

Monorails and lifting beams over drop zones that run to the ground floor.

Cladding and dust control

Girts and openings for cladding, louvers and dust collection ducts.

Coordinated with the mechanical layout

Interfaces we model in Tekla

ItemWhat we coordinateWho provides the data
Belt and driveBearing positions, drive base, belt tensionConveyor designer
ChutesSupport points, weights, liner accessChute designer
Dust collectionDuct openings and equipment platformsMechanical engineer
ElectricalCable tray supports, MCC room framingElectrical engineer

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Tower, floor and hoist beam design to US codes for your EOR’s review
  • Bracing laid out around chutes and drop zones
  • Cladding and louvers when you want them
  • Shop drawings at no extra charge

The US contractor, our customer, and others

  • Conveyor drives, pulleys, chutes and dust collectors
  • Foundations and anchor rod setting
  • Erection and equipment installation
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a mine.

Columns and floor beams of a multi-story steel frame partway through erection Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Pair of red truss assemblies with bolted connection plates inside the shop Photo
Two trusses finished in red primer at World Steel in Vietnam.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Transfer towers: questions we hear

Can transfer towers ship preassembled?

Partly. Towers ship as columns, braced panels and floor framing sized for containers or flat racks, so the field work is mostly bolting. The split is agreed with your erector before detailing.

Can you design for seismic forces on a tall tower?

Yes. We design to ASCE 7-22 and, where your Engineer of Record selects a seismic system, to AISC 341, with AWS D1.8-qualified welding in our shop.

Who designs the chutes?

Chutes are usually designed by the conveyor or chute specialist. We design and fabricate the steel that carries them, and can fabricate chute steel to their drawings when agreed.

Does World Steel provide shop drawings for mining steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes, the owner’s design criteria and the equipment data govern, and your Engineer of Record confirms them for each project. World Steel has no published mining project.

Talk to our mining steel team

Send the general arrangement drawings, the owner’s structural criteria and the area you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.