Nebraska · Snow and drift

Structural steel for Nebraska blizzard snow and drift

Nebraska’s ground snow is moderate, but blizzard winds move it across open land and pile it against doors, lower roofs, parapets and rooftop units. Drift, not the flat roof snow, often governs the roof steel. We check drift at every step and size purlins and rafters for it.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail to Omaha for your Nebraska site.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Ground snow
Moderate, per site
Governing load
Wind-driven drift
Frost
Deep footings
Our part
Drift at every step

Why it matters

The wind moves the snow

A long warehouse roof next to a taller office, a canopy beside a dock or a cooling unit on a data hall roof all collect drift in a Nebraska blizzard. These local loads are where roof steel fails if they are missed.

We take ground snow and exposure from ASCE 7 for the site, check drift at every roof step, parapet and unit, lap and size purlins where drift collects and give your foundation engineer reactions for frost-depth footings.

What we design and fabricate

Steel for heavy snow

Purlins for drift

Z purlins lapped and sized where drift collects.

Rafters and trusses

Built-up rafters and trusses for heavy snow over long spans.

Thermal breaks

Details that keep cold out of heated and frozen spaces.

Base reactions

Clear reactions for footings set below the frost line.

Who does what

Snow and frost, split clearly

World Steel supplies

  • Roof steel designed for snow and drift to ASCE 7
  • Drift checks at steps, parapets and rooftop units
  • Thermal break details at the envelope
  • Base reactions for the foundation design
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Ground snow and exposure with the Engineer of Record
  • Engineer of Record approval and PE seal
  • Frost depth and footing design
  • Cold-weather concrete and site work
  • Erection and site work

Nebraska

What we do not claim

World Steel does not design foundations. Frost depth and footing design are your foundation engineer’s scope; we provide the base reactions they need.

Nebraska ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Nebraska contractors

Nebraska contractors: let’s win the next project together

If your next bid involves blizzard snow and drift, World Steel wants to be your long-term, win-win steel partner in Nebraska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Nebraska project is cut, welded, inspected and packed.

Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Painted beams with bolted end plates resting on stands below an overhead crane
Coated beams with end plates welded on, waiting for release in the Vietnam plant.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Rows of columns, rafters and purlins inside a large steel building
Inside a finished World Steel frame on a job abroad (location not stated).

Q&A

What Nebraska buyers ask

Is drift really the main roof load?

Often it is on open plains. We check it at every roof step and obstruction.

Do you design the footings?

No. Frost depth and footings are your foundation engineer’s scope; we provide the reactions.

Can you add a building next to an existing one?

Yes. We check drift on the lower roof where the new building meets the old.

Official sources: ASCE 7 Hazard Tool

Building in Nebraska?

Send the drawings or the site address, size and use. We set the Nebraska design basis with your Engineer of Record, design or detail the steel to the Nebraska State Building Code and to blizzard snow and plains wind, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail to Omaha for the truck to your site.