Oklahoma · Agriculture and food
Structural steel for Oklahoma agriculture and food plants
Oklahoma raises cattle and hogs and grows winter wheat across the plains and the panhandle, and the meat, feed and grain plants that serve them are large buildings. Food plants need washable steel in the process areas and insulated cold rooms; farm and grain buildings need wide spans. All of them face wind, hail and ice.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Houston and trucked north to your Oklahoma site.
- Clusters
- Panhandle and the plains
- Plants
- Meat, feed and grain
- Cold rooms
- Insulated, thermal breaks
- Storms
- Wind, hail and ice
Why it matters
Clean, cold and storm-proof
In process rooms, ledges and pockets collect product and water, so the steel is detailed to drain and to clean. Cold rooms need insulated panels and thermal breaks where steel passes through the envelope, or frost and condensation follow.
Our plant built steel for Hai Dai feed plants in Vietnam, a repeat customer. On the plains, we design the frame, doors and canopies for the site wind and ice, and specify galvanizing for barns, feed and wet areas.
What we design and fabricate
Steel for agriculture and food plants
Washable details
Sealed and sloped details in wet process areas.
Cold rooms
Insulated panels and thermal breaks at the envelope.
Farm buildings
Wide-span barns, grain and equipment buildings.
Coatings
Galvanizing for barns, feed and wash-down areas.
Who does what
Food plant steel, split clearly
World Steel supplies
- Process hall, barn and grain building frames
- Insulated envelope and thermal break details
- Coating systems for wet and farm areas
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Food safety design with the owner
- Engineer of Record approval and PE seal
- Local permit and inspections
- Refrigeration and process equipment
- Erection and site work
Oklahoma
What we do not claim
World Steel names no meat, feed or food company in Oklahoma as a customer and holds no food safety certification for the buildings it supplies; food safety design is set with the owner.
Oklahoma ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Oklahoma contractors
Oklahoma contractors: let’s win the next project together
If your next bid involves agriculture and food plants, World Steel wants to be your long-term, win-win steel partner in Oklahoma. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oklahoma project is cut, welded, inspected and packed.
Q&A
What Oklahoma buyers ask
Can you detail steel for wash-down areas?
Yes. We detail process area steel to drain and to clean, and specify galvanizing or epoxy coatings.
Do you supply farm and grain buildings?
Yes. Wide-span barns, grain and equipment buildings designed for the site wind, hail and ice.
Have you built feed plants?
Yes. Our plant supplied steel for Hai Dai feed plants in Vietnam, published on our projects page.
Official sources: Oklahoma Department of Agriculture, Food and Forestry
Oklahoma solutions
Every Oklahoma guide
Related pages
Code facts on this page summarize Oklahoma practice, the IBC as adopted by the Oklahoma Uniform Building Code Commission, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oklahoma?
Send the drawings or the site address, size and use. We set the Oklahoma design basis with your Engineer of Record, design or detail the steel to the statewide code and to tornado, hail, ice and seismic loads, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.