Made in Vietnam, landed at Baltimore
Why ship your building through Baltimore
The Maryland Port Administration owns the public terminals. Containers are handled at Seagirt Marine Terminal, operated by Ports America Chesapeake on a 15.2 m (50 ft) berth, and Dundalk Marine Terminal handles ro-ro and breakbulk. CSX finished the Howard Street Tunnel project in 2026, opening double-stack rail from the port to the Midwest.
The Francis Scott Key Bridge, which collapsed in 2024, is being rebuilt; the shipping channel reopened in 2024. Your building is fabricated in World Steel’s plant in Vietnam and reaches Baltimore through the Panama Canal on most services.
-
One package, one plant
Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.
-
Accredited fabrication
World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.
-
Designed to US codes
IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.
-
Packed for this port
Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.
Port facts
Terminals, channel and connections at Baltimore
Channel
15.2 m (50 ft) channel and Seagirt berths
Rail
CSX double-stack via the Howard Street Tunnel; Norfolk Southern
Highways
I-95, I-695, I-895, I-70
| Terminal | Where / operator | Cargo |
|---|---|---|
| Seagirt Marine Terminal | Ports America Chesapeake | Containers |
| Dundalk Marine Terminal | Ro-ro, breakbulk and project cargo | Breakbulk |
Source: Maryland Port Administration: Seagirt Marine Terminal, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.
From our plant to Baltimore
How your steel gets here
Through the Panama Canal and up the Atlantic coast, then north up the Chesapeake Bay to the Patapsco River.
Your shipment to Baltimore, leg by leg
Run the full simulation →By road
About 2 hours
World Steel pays
By sea · via Panama
≈ 12,100 nmi illustrative lane
Split between us
Customs, truck or rail
Planned with your trucker
You pay
Risk passes to you when the steel is on board the vessel at the named Vietnamese port.
Inland reach
Where steel goes from Baltimore
Trucks reach Washington, Philadelphia and central Pennsylvania within hours. CSX double-stack trains now run from the port west toward Ohio and Chicago.
Designed for the region
Site conditions we design for around Baltimore
Snow Load Steel Buildings
Maryland and Pennsylvania sites need ASCE 7 snow and drift loads.
How we design for itHigh-Wind Steel Buildings
The Bay shore and Eastern Shore see coastal wind exposure.
How we design for itEnergy Code Building Envelopes
Mid-Atlantic energy codes set insulation for walls and roofs.
How we design for itOn arrival
Receiving your steel at Baltimore
DC-area jobs
Baltimore is often closer to Washington-area sites than any other container port.
Winter erection
Plan for snow and cold-weather bolting procedures.
Federal projects
Check foreign-steel rules with the contracting officer first.
Documents sent ahead to your broker
- Commercial invoice and packing list per container
- Bill of lading and certificate of origin
- Container packing report with seal number and VGM
- EN 10204 3.1 mill certificates
- Shipping marks with a QR link to each member’s passport
What the quote states for Baltimore
- The Incoterm, for example FOB Vietnam, CFR or CIF Baltimore
- Who acts as importer of record
- Containers, flat racks or breakbulk for oversize members
- Delivery to the port or to a named US place, if offered
No prices, freight rates or duty estimates are published.