Oil and gas · petrochemical · process industry

Oil, gas and petrochemical: steel to the owner’s specification, every piece traced

Process plants are built to owner and EPC specifications that go well beyond the building code: material toughness, coating systems, inspection levels and documentation for every member. Our flagship here is the Long Son petrochemical complex: about 2,000 metric tons of steel structures over more than 56,000 m².

Flagship
Long Son petrochemical complex, about 2,000 t
Covered area
More than 56,000 m² (about 600,000 sq ft)
Built to
The owner and EPC specification, on top of the code
Long Son petrochemical complex, structural steel by World Steel World Steel reference 2,000 t of structural steel Long Son petrochemical complex Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022 · more than 56,000 m²
Oil, gas and petrochemical at a glanceTypical ranges · not design values
Typical spans
18 to 40 m (60 to 130 ft) for process and warehouse buildings
Heights
Multi-level equipment structures and tall process halls
Structural systems
Pipe racks, braced and moment frames, multi-level equipment structures
Loads that size the steel
Equipment, piping and vessel loads, blast or wind cases set by the owner
Codes and standards
Owner and EPC specifications, AISC 360, ASCE 7-22, AWS D1.1
Coating and exposure
Corrosive and coastal atmospheres; epoxy, polyurethane or galvanized systems

What makes this project type different

What sizes the steel in oil, gas and petrochemical

On a refinery, gas processing or petrochemical project, the building code is only the floor. The owner’s engineering standards and the EPC contractor’s specification add their own rules for steel grades, Charpy toughness, coating systems, bolt assemblies, inspection and the documents that must arrive with the steel. A fabricator is judged on how completely it follows them.

Process sites are also crowded. Steel arrives while piping, equipment and electrical contractors are already working, so pieces must be marked, sequenced and packed by area. Our scope covers pipe racks, process and maintenance buildings, equipment structures, platforms, shelters and their stairs and access steel. We do not fabricate oil and gas modules.

The owner’s specification

Material, welding, coating and inspection requirements that sit above the code, often with project-specific forms.

Equipment and piping loads

Vessels, exchangers, pumps and pipe supports bring heavy point loads, operating and test cases.

Corrosive atmosphere

Coastal and chemical exposure sets the surface preparation, the coating system and the dry film thickness.

Special load cases

Blast, thermal and hydrocarbon fire cases, where the owner requires them, are set by the owner’s engineers.

Traceability

Every member traced to its heat number, with mill certificates, weld and coating records in one handover file.

Pipe rack runs

Long, repeated rack bents and struts, with pipe, cable tray and thermal loads set by the piping engineers.

Structures and systems

The structures in a typical package, and what we fabricate

Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.

Typical structures and systems for Oil, gas and petrochemical
StructureTypical systemWhat we fabricate
Pipe racksMulti-tier braced or moment frames along the plant’s piping corridorsColumns, tier beams, longitudinal struts, bracing, walkways
Process buildingsBraced or rigid frames with crane or monorail beamsFrames, crane beams, bracing, cladding supports
Equipment structuresMulti-level braced frames with grated floorsColumns, beams, bracing, platforms and stairs
Warehouses and workshopsClear-span frames for maintenance and storesFrames, purlins, girts and canopies
Access steelPlatforms, ladders, stairs and handrailsAccess steel, galvanized or coated

Our advice before you bid

Decisions that save steel, time and rework

  • Send the full specification with the bid

    Owner and EPC standards change the price more than the tonnage does. A complete set lets us quote what you will actually be held to.

  • Agree the inspection and test plan early

    Hold points, witness points and the documents for each are written into the ITP before fabrication.

  • Match the coating to the real exposure

    Coastal and chemical sites need the system, thickness and inspection your owner specifies, applied in our covered paint hall.

  • Pack by plant area, not by member type

    Agree the area and sequence codes, and every bundle arrives labeled for the crew that needs it.

  • Define the handover file

    Mill certificates, weld maps, NDT and coating records in the format the owner wants, from the first shipment.

World Steel projects of this type

Built by World Steel, from our own plant

Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.

Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022 · more than 56,000 m²

Long Son petrochemical complex

2,000 tabout 2,200 short tons

Steel structure designed, fabricated and supplied by World Steel.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.

Inside our factory
Plate and coil strip racked by grade and heat number in the store Photo
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Inspector walking a line of painted built-up members on the shop floor Photo
Final look at coated members before they are released to packing, World Steel plant in Vietnam.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Manufacturing Data Record

Mill certificates, weld and coating records traced to each member.

EN 10204 3.1 on request

Plate mills in Vietnam can supply 3.1 certificates with Charpy results.

Third-party inspection

Smith Emery is our inspection partner; your inspector gets remote access on request.

The structural steel ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

The industry behind this guide

World Steel projects of this type

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US contractors

Oil, gas and petrochemical: questions we hear

Have you supplied steel for oil and gas projects?

Yes. At the Long Son petrochemical complex in Vietnam we designed, fabricated and supplied about 2,000 metric tons of steel structures covering more than 56,000 m² (about 600,000 sq ft).

Can you work to an owner’s engineering standards?

Yes. Send the owner and EPC specifications with the bid. We confirm each requirement, or tell you before award where we need an alternative approved.

Do you fabricate pipe racks and modules?

We fabricate pipe racks: columns, tier beams, struts, bracing and walkways, packed by rack segment. We do not fabricate oil and gas modules.

Who provides fire protection on process steel?

The fire protection system is set by the owner’s specification. We prepare and prime the steel for it, and where agreed apply a listed product in our paint hall.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.

Does World Steel erect the steel?

No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.

A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.

Bidding oil, gas and petrochemical?

Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.