Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022 · more than 56,000 m²
Long Son petrochemical complex
2,000 tabout 2,200 short tons
Steel structure designed, fabricated and supplied by World Steel.
What makes this project type different
On a refinery, gas processing or petrochemical project, the building code is only the floor. The owner’s engineering standards and the EPC contractor’s specification add their own rules for steel grades, Charpy toughness, coating systems, bolt assemblies, inspection and the documents that must arrive with the steel. A fabricator is judged on how completely it follows them.
Process sites are also crowded. Steel arrives while piping, equipment and electrical contractors are already working, so pieces must be marked, sequenced and packed by area. Our scope covers pipe racks, process and maintenance buildings, equipment structures, platforms, shelters and their stairs and access steel. We do not fabricate oil and gas modules.
Material, welding, coating and inspection requirements that sit above the code, often with project-specific forms.
Vessels, exchangers, pumps and pipe supports bring heavy point loads, operating and test cases.
Coastal and chemical exposure sets the surface preparation, the coating system and the dry film thickness.
Blast, thermal and hydrocarbon fire cases, where the owner requires them, are set by the owner’s engineers.
Every member traced to its heat number, with mill certificates, weld and coating records in one handover file.
Long, repeated rack bents and struts, with pipe, cable tray and thermal loads set by the piping engineers.
Structures and systems
Your Engineer of Record chooses the systems. These are the ones we see most often in this type of project, all fabricated in our plant in Vietnam.
| Structure | Typical system | What we fabricate |
|---|---|---|
| Pipe racks | Multi-tier braced or moment frames along the plant’s piping corridors | Columns, tier beams, longitudinal struts, bracing, walkways |
| Process buildings | Braced or rigid frames with crane or monorail beams | Frames, crane beams, bracing, cladding supports |
| Equipment structures | Multi-level braced frames with grated floors | Columns, beams, bracing, platforms and stairs |
| Warehouses and workshops | Clear-span frames for maintenance and stores | Frames, purlins, girts and canopies |
| Access steel | Platforms, ladders, stairs and handrails | Access steel, galvanized or coated |
Our advice before you bid
Owner and EPC standards change the price more than the tonnage does. A complete set lets us quote what you will actually be held to.
Hold points, witness points and the documents for each are written into the ITP before fabrication.
Coastal and chemical sites need the system, thickness and inspection your owner specifies, applied in our covered paint hall.
Agree the area and sequence codes, and every bundle arrives labeled for the crew that needs it.
Mill certificates, weld maps, NDT and coating records in the format the owner wants, from the first shipment.
World Steel projects of this type
Steel designed, fabricated and supplied by World Steel. Photos are from our project archive and open full size.
Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022 · more than 56,000 m²
2,000 tabout 2,200 short tons
Steel structure designed, fabricated and supplied by World Steel.
Real photos
World Steel’s own shop floors and jobs, where the steel for US projects is made: 2,500 metric tons of structural steel a month. Not stock images.
Inside our factory
How World Steel supports this
Manufacturing Data Record
Mill certificates, weld and coating records traced to each member.
EN 10204 3.1 on request
Plate mills in Vietnam can supply 3.1 certificates with Charpy results.
Third-party inspection
Smith Emery is our inspection partner; your inspector gets remote access on request.
The structural steel ecosystem
The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.
Photo
Photo
Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.
Standards on this page
Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.
Keep reading
Questions from US contractors
Yes. At the Long Son petrochemical complex in Vietnam we designed, fabricated and supplied about 2,000 metric tons of steel structures covering more than 56,000 m² (about 600,000 sq ft).
Yes. Send the owner and EPC specifications with the bid. We confirm each requirement, or tell you before award where we need an alternative approved.
We fabricate pipe racks: columns, tier beams, struts, bracing and walkways, packed by rack segment. We do not fabricate oil and gas modules.
The fire protection system is set by the owner’s specification. We prepare and prime the steel for it, and where agreed apply a listed product in our paint hall.
Yes. Shop drawings come with every project at no extra charge, from one Tekla Structures model of the whole job. Your Engineer of Record reviews and approves the structural drawings.
No. World Steel designs, fabricates and supplies the steel structure. Erection, the PE seal, the permit and site work are the scope of the US contractor, our customer.
A plain-English guide for US contractors, not engineering advice for a specific site. Ranges are typical, the adopted codes govern, and your Engineer of Record sets the design criteria for each project.
Send the drawings, the specification and the schedule. Our estimators take off the tonnage, confirm the production slot we can hold for it and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.