Proven at scale
Jobs from 1,000 to 5,000 t, from a 2,500 t/month plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
-
5,000 t
Sunpro Steel Factory
Steel industry · about 5,500 short tons
-
2,500 t
CPV Food Processing Factory
Food processing · about 2,750 short tons
-
2,000 t
Long Son petrochemical complex
Oil and gas · about 2,200 short tons
-
2,000 t
M&D (MD Factory)
Warehouse and industrial · about 2,200 short tons
-
1,500 t
Tongwei Tien Giang feed factory, phase 1
Animal feed · about 1,650 short tons
-
1,000 t
New Era cold storage
Cold storage, phase 1 tonnage · about 1,100 short tons
Before and after
From the usual steel problem to the World Steel way
Inspection and Test Plan
An Inspection and Test Plan built around your owner
A typical extract. H = hold, the shop waits for your release. W = witness, you are invited. R = review of records.
An Inspection and Test Plan built around your owner
H HoldW WitnessR ReviewHow our quality system works →
Request a quotation · EPC & Industrial Contractors
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Discuss an industrial steel packageYour scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that epc & industrial contractors use most, each with its own page to read before you call.
Ecosystem for EPC & Industrial Contractors
Photo
Photo
Photo
Photo
Engineering guides
- Connections & Load PathEvery link from roof sheet to anchor rod
- Coastal Corrosion ProtectionCoatings picked from the real exposure
- Seismic DesignSeismic Design Category drives the details
How we work
- Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
- Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
- Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
Buildings to look at
- Southern Vietnam Petrochemical ComplexVietnam · 2022
Photo
- Thuan Bac Solar Power Plant (Trung Nam Ninh Thuan)Vietnam · 2019
Illustration
- PSA PortSingapore · 2025
Photo
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What epc & industrial contractors ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
Can World Steel work to our owner’s specification?
Yes. Send the specification and ITP template. We map each requirement to our procedures and confirm any exceptions in writing before fabrication.
What traceability do you provide?
Each member is traced by heat number to its EN 10204 3.1 mill certificate. Charpy (CVN) values can be supplied on request from Vietnam plate mills.
Can our inspector attend?
Yes. Hold and witness points can be attended in person, by your third-party inspector or by live video.
Do you exchange models?
Yes. We detail in Tekla Structures and exchange IFC models with your design team.
What is World Steel’s oil and gas reference?
The Long Son petrochemical complex: about 2,000 t of steel structures covering more than 56,000 m², completed in 2022.
Who erects and certifies the structure on site?
Your team and its Engineer of Record. World Steel designs or fabricates to your drawings, supplies the steel and its records.
Similar roles
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.