Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Building package · Workshop with office

One frame. Shop on one side, office on the other.

A workshop with an office is two buildings sharing one frame: the shop side wants height, cranes and big doors; the office side wants floors, windows and insulation. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, designs both sides together and ships them to your US contractor.

Cutaway of one building

Switch sides. The frame stays the same.

The crane runway on the shop side and the office mezzanine on the other are carried by the same frames, designed together.

Show the shop side or the office side
SHOP OFFICE

Shop side: height, cranes and big doors

Office side: floors, windows and comfort

3D model of the Syncro workshop frames during erection 3D model
3D model of the Syncro office and workshop 3D model
Mautic workshop frame seen from a drone Photo

Size the shop around the biggest job

Start from the job, not from a catalogue size

A good shop is sized backwards from the biggest thing that will ever be inside it. Pick the kind of shop to see the spec sheet our engineers start from.

Kind of shop

Fleet maintenance

Sized for: The tallest truck on a lift, hood open

Doors
Drive-through bays with wide, tall doors at both ends
Crane
Monorail or jib for engines and transmissions, where you want it
Eave
Set by the raised truck and the lift
Services
Support steel for exhaust reels, lube lines and lights
Office
Service desk and parts room under a mezzanine

Steel fabrication

Sized for: The longest part under the crane hook

Doors
End doors in line with the crane bay for loading out
Crane
Overhead crane runway designed into the columns
Eave
Set by hook height over the largest part
Services
Framing for welding fume extraction and power drops
Office
Drawing office with a window onto the shop floor

Heavy and farm equipment

Sized for: A combine or a dozer coming in for repair

Doors
Extra-wide door in a gable end for wide machines
Crane
Jib or monorail over the repair bay
Eave
Set by the tallest machine and its cab
Services
Wash bay framed apart, with coating for the wet air
Office
Small office and parts counter beside the door

Contractor yard

Sized for: Trucks, trailers and stored materials

Doors
Several drive-in doors along one side
Crane
Usually none; a future runway can be planned
Eave
Set by the loaded truck and racking
Services
Open lean-to for covered storage
Office
Two-story office block for the team

Starting points, not fixed sizes. Your layout, loads, door and crane makers set the real values; your Engineer of Record approves them.

Large projects

From one workshop to a whole plant

Our own plant in Vietnam is the biggest workshop-with-office we have built for ourselves: 20,000 m² (215,000 sq ft) of fabrication halls with an office building in front. The same team frames a single workshop or a multi-building campus for a US contractor.

Drone view of the World Steel plant and office building in Tay Ninh, Vietnam Photo
World Steel’s own plant in Tay Ninh Province, Vietnam: 20,000 m² (215,000 sq ft) of workshops with an office building in front.
Office building in front of the World Steel fabrication halls Photo
The office building in front of our fabrication halls.

Fabrication capacity

One workshop or a whole campus

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

The workshop ecosystem

Two sides, meeting at one frame

Everything on the shop side and the office side hangs on the shared frame in the middle, and on the services behind it.

Real World Steel frames

Workshop frames, from bundle to roof

World Steel workshop frames on site, from delivered bundles to rafters going up. Tap a photo to open it full size.

Blue steel workshop frames with roof purlins during erection Photo JRI factory, Thailand
Crane lifting a rafter onto blue steel columns Photo Rafters going up
Blue steel members delivered to site Photo Delivered by bundle
Mautic workshop frame being clad, seen from a drone Photo Mautic workshop, about 60 t
Inside a steel building with a large sectional door Photo Big door, framed

Projects outside the US, shown for the structure type; they are not US sites.

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

Most shop owners want the bays, the lifting and the paperwork in one building. This package pairs open work bays with a front office or a mezzanine over the end bays, and puts crane runway loads into the frame design from day one. Cranes are sourced from qualified manufacturers and coordinated with our steel drawings.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Secondary Framing

Roofing System

Wall & Cladding System

Connections & Anchorage

Drainage & Weather Protection

Crane Runway & Industrial Supports

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.

Talk to an engineer

Send the layout, the crane and the door sizes.

Our engineers work in English. We design the shop side and the office side in one frame and send a written scope for the steel.

Asked by owners and contractors

Workshop questions and answers

12 answers on layout, cranes, campuses and scope.

Shop and office layout 3 answers

Can the office sit inside the workshop frame?

Yes. An office at one end of the building, on the ground floor or on a mezzanine, can share the main frames. A separate office wing can also be framed as its own structure next to the shop. We compare both for your layout.

Can the workshop carry an overhead crane?

Yes. Crane brackets, runway beams and the columns are designed for the crane you specify, and the office end is kept clear of the crane path.

What about large doors and wash bays?

Large sectional or roller doors are framed with jambs and headers sized for wind on the opening. Wash bays get coatings chosen for wet conditions.

From one building to a campus 2 answers

Can you supply several workshops and offices on one site?

Yes. A campus of workshops, stores and offices is detailed from one model and packed building by building. Our plant fabricates 2,500 t (5.5 million lb) of structural steel a month, so a multi-building site does not have to wait for a gap in production.

Can we expand the workshop later?

Yes. We can leave the end wall ready for extension, and later bays reuse the same frame and connection details from the drawings we keep.

Design and codes 2 answers

Which codes do you design to?

IBC 2024 and ASCE 7-22 by default, or your jurisdiction’s edition, with AISC 360 for hot-rolled and built-up members, AISI S100 for cold-formed members and MBMA practice for the metal building system. Crane runways follow AISC Design Guide 7 practice.

Who approves and seals the drawings?

Your Engineer of Record reviews and approves the calculations and drawings we prepare. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

Sizing the shop 3 answers

How tall should the shop be?

Tall enough for the biggest job: the tallest truck on a lift, the crane hook height over the largest part, or a tipper body raised. We work back from that to the eave height and the crane runway level.

Can the frame carry a crane later?

Yes, if it is planned now. We can design the columns and brackets for a future crane runway so the crane maker can add it later without reinforcing the frame.

How wide can the shop doors be?

Door openings are framed on their own, with headers and jambs designed for the door maker’s loads. Wide openings in a gable end or a side wall are common; we show the framing on the drawings.

Buying, shipping and erection 2 answers

Do you erect the building?

No. World Steel designs, fabricates and supplies the steel structure, and panels, doors and the crane if you want them in one package. Foundations, erection, fit-out and site work are the scope of the US contractor, our customer.

Do you publish prices?

No. Send the layout, the crane and door sizes and the site address and we return a written scope and quotation.

Keep reading

Related pages

Planning a workshop with offices?

Send the layout, the crane and door sizes and the site address. We design both sides in one frame and send a written scope for the steel, made in our plant in Vietnam.