Rickhouses and distilleries
Nelson, Franklin, Anderson and Marion counties
Barrel warehouses framed for rack loads and repeated across the campus, plus still houses and bottling halls.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Six barrels, six markets
From barrel warehouses in the Bourbon Trail counties to battery halls on I-65 and mills on the Ohio River, Kentucky’s large projects come in six kinds. Each has its own loads, spans and schedule.
Distilleries and rickhouses, vehicle plants, an air hub and distribution on I-64, I-65 and I-71.
Vehicle and supplier plants around Georgetown, horse farms and distillery campuses.
Air cargo and distribution near the Cincinnati airport, across the river from Ohio.
Battery and vehicle plants, aluminum and distribution on I-65.
Chemical plants and river industry close to the New Madrid seismic zone.
Mills, energy and plants on the river and in the hills, with snow and steep sites.
Kentucky guides
One guide per Kentucky condition: the code and state plan review, seismic, tornado and ice, and the rickhouse, auto, battery, air cargo, heavy industry and equine projects that drive the market.
Ready for Kentucky
Solution advisor
Structural steel for the project types Kentucky builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Nelson, Franklin, Anderson and Marion counties
Barrel warehouses framed for rack loads and repeated across the campus, plus still houses and bottling halls.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Georgetown, Louisville and Bowling Green
Long-span assembly halls, crane bays, stiff mezzanines and heavy roof plant, planned for the next program.
JRI new factory, Thailand: plant steel by World Steel
Glendale, Bowling Green and the I-65 corridor
Cell and pack halls with stiff floors, heavy roof plant and utility steel, released hall by hall.
GPPD Energy factory, Vietnam: plant steel by World Steel
Louisville, Shepherdsville, Hebron and Florence
Clear-span sort and distribution buildings with long dock walls, tall clear heights and fast area releases.
Pegasus warehouse, Thailand: clear-span World Steel frames
Ghent, Lewisport, Calvert City and the Ohio River
Heavy crane runways, built-up columns, process structures and platforms to owner specifications.
Hoa Phat factory, Vietnam: heavy plant steel by World Steel
Lexington, Paris and the Bluegrass
Long clear-span arenas, barns and pavilions with natural light and ventilation.
SQM factory, Thailand: long-span steel by World Steel
Western Kentucky and the Pennyrile
Process halls, grain buildings and cold rooms with washable details.
Haid Vinh Long feed factory, Vietnam: plant steel by World Steel
Louisville, Lexington and Covington
Multi-story steel frames with composite floors and braced cores, coordinated with your Engineer of Record.
Southgate Tower, Vietnam: multi-story steel by World Steel
The Kentucky ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Kentucky structures, beyond metal buildings.
Complete buildings engineered for Kentucky sites.
Members and parts made in our Vietnam plant.
The design basis behind every Kentucky review.
How you buy and follow your steel.
From the plant in Vietnam to your Kentucky site.
Open call · Kentucky contractors
Rickhouse campuses in the Bourbon Trail counties, battery and vehicle plants on I-65 and I-75 and air cargo buildings at Louisville and Northern Kentucky are large, repeatable steel packages. You win the job and run the site; World Steel designs and fabricates the structural steel, 2,500 t a month from its own plant, with documents ready for state plan review.
Buying steel from outside the US
The questions Kentucky owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant, plate intake, the saw station, beam line control, member checks, blasting, painting and stacked bundles. None is shown as a Kentucky site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Kentucky buyers
The Kentucky Building Code, the IBC with Kentucky amendments, adopted by the state and applied statewide. We confirm the edition with your Engineer of Record and design the steel with ASCE 7 loads for your site.
The Department of Housing, Buildings and Construction reviews many commercial projects, and some local jurisdictions review under their own programs. Your design team submits; we provide steel drawings and calculations ready for that review.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to follow your erection sequence.
Through Norfolk, Savannah or Charleston and then by rail or truck, or through a West Coast port and by rail to Louisville. Members are packed in erection order.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, plan review, seismic, storm and delivery questions for your site.
Honest status. World Steel designs and fabricates to the Kentucky Building Code edition in force at your site and ASCE 7, with documents ready for state or local plan review. We hold no state or local approval and no Kentucky engineering license, and we do not submit plans; that, the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the Kentucky design basis with your Engineer of Record, design or detail the steel ready for plan review and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.