Texas · Warehouses, data centers, plants

Structural steel for the Texas Triangle’s biggest buildings

Dallas–Fort Worth, Houston, Austin and San Antonio add more industrial space each year than most countries. Distribution campuses, data center halls and new plants are bought as large, repeated steel packages, often in phases. We fabricate them in volume and ship them building by building.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Texas port.

Long-span warehouse inside an industrial campus, seen by drone
World Steel building abroad, from the air (location not stated).
Markets
DFW, Houston, Austin, San Antonio, the Laredo corridor
Structures
Long-span frames, data halls, crane bays, mezzanines
Supply
Phased packages, packed per building
Capacity
2,500 t of structural steel a month

What Texas builds

Three building types, one plant

Distribution campuses

Several large buildings on one site, with repeated bays fabricated in sequence and packed per building.

Data centers

Data hall frames, heavy roof equipment framing, pipe and cable racks, released per phase.

Manufacturing plants

Crane-served built-up frames, runway beams, mezzanines and equipment platforms.

Long-span buildings

Hangars, arenas and large clear spans with trusses or built-up frames.

How we keep pace

Large Texas jobs, run as a sequence

Big packages are split so the first buildings ship while later ones are still in the shop.

StageWhat we doWhat you see
DesignRepeated bays and connections optimized once, used everywhereFewer unique pieces and faster approvals
ReleaseShop drawings released building by buildingApproval in step with your site plan
FabricationParallel lines in our plant in VietnamProgress in PEB Studio, member by member
ShippingPacked per building and erection sequenceContainers that match the erection plan

What we do not claim

We claim no completed Texas project. Our references are large jobs elsewhere, such as Sunpro Steel at 5,000 t and M&D in Thailand at 2,000 t, fabricated in the same plant.

Texas ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Texas project is cut, welded, inspected and packed.

Tall columns and rafters inside a clear-span building with roof sheeting on
Clear-span interior on a World Steel job in southern Vietnam.
Tall lattice columns of a crane-served industrial building during erection
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.

Q&A

What Texas buyers ask

Can you supply a campus of several buildings?

Yes. We release and pack the steel building by building, so erection can start on the first while later buildings are in the shop.

Do you supply data center steel?

Yes: data hall frames, roof equipment framing, pipe and cable racks and equipment platforms. Our data center guides cover each part.

Can you fabricate crane runway beams?

Yes. Crane runway beams, brackets and crane columns are designed for the crane loads your crane supplier gives us.

Texas solutions

Every Texas guide

Related pages

Code facts on this page summarize Texas rules, the International Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Texas?

Send the drawings or the site address, size and use. We set the Texas design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.