Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Arkansas · Farm buildings

Structural steel for Arkansas Delta farm and rice buildings

The Arkansas Delta grows more rice than any other state, plus soybeans, cotton and corn, on flat, open land along the Mississippi. Farms and mills there need storage halls, dryer buildings, machine sheds and shops. We design and fabricate their steel to ASCE 7.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New Orleans or Houston for your Arkansas site.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Crop
First in US rice
Buildings
Storage, dryers, sheds
Loads
Open wind, soft soil
Coatings
Galvanized options

Why it matters

Flat land, open wind, soft soil

A rice storage hall near Stuttgart stands on flat, open land with deep soft soil and sometimes a flood zone, and it carries dust, moisture and wide equipment doors.

We design the frames, purlins and door framing for the site wind, give your foundation engineer clear base reactions and choose galvanized or duplex coatings where the exposure calls for them.

What we design and fabricate

Steel for farm and ranch buildings

Machine sheds

Clear spans for combines, sprayers and trucks.

Storage and processing

Buildings for grain, hay, feed and produce.

Coatings for barn air

Galvanized or duplex steel for livestock exposure.

Big doors

Framing for wide equipment doors.

Who does what

Farm steel, split clearly

World Steel supplies

  • Frames, purlins and girts designed to ASCE 7
  • Coating systems for livestock and wet exposure
  • Door framing for equipment
  • Packing for the truck to the farm
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site, pad and foundations
  • Engineer of Record approval and PE seal where required
  • Ventilation and equipment
  • Doors, panels and fasteners
  • Erection and site work

Arkansas

What we do not claim

Many farm buildings are exempt from local building codes, but World Steel still designs them to ASCE 7 for wind and snow unless the owner directs otherwise. Your engineer confirms what the county requires.

Arkansas ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Arkansas contractors

Arkansas contractors: let’s win the next project together

If your next bid involves delta farm buildings, World Steel wants to be your long-term, win-win steel partner in Arkansas. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Arkansas project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Q&A

What Arkansas buyers ask

Are farm buildings exempt from codes?

Often they are. We still design them to ASCE 7 unless the owner directs otherwise.

Can you supply rice mill buildings?

Yes. We fabricate process and storage buildings to the owner’s specifications.

Do you supply grain bins and dryers?

No. Bins and dryers come from their suppliers; we supply the buildings and support steel.

Official sources: Arkansas Farm Bureau

Arkansas solutions

Every Arkansas guide

Related pages

Code facts on this page summarize Arkansas practice, the Arkansas Fire Prevention Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Arkansas?

Send the drawings or the site address, size and use. We set the Arkansas design basis with your Engineer of Record, design or detail the steel to the Arkansas Fire Prevention Code, New Madrid seismic rules and storm loads, and quote it made in our plant in Vietnam, packed in erection order and delivered through New Orleans or Houston to your site.