Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Painted members strapped into bundles and stacked for the voyage

Bundles made up for an export shipment at the Vietnam plant.

Growth opportunities

Data halls · Edge sites · Telecom · Backup power

Data Centers & Technology

Steel for dense equipment, cable paths and rooftop plant. Data halls, telecom buildings and backup power enclosures where the frame carries heavy, vibration-sensitive equipment.

Floors
Heavy-load equipment floors and platforms
Services
Cable, busway and duct support steel
Roof plant
Dunnage for cooling units
Coordination
Tekla model checked against your MEP model
Typical sectionIllustrative
Illustrative section of a data centers & technology steel buildingData hall bay 12 m (39 ft)Rooftop dunnage framesCable and busway supportsStructural steel frameGenerator enclosure

Illustrative data hall section, not a design. Equipment weights and MEP routes are fixed with your engineers.

What the frame carries

A data center frame works in layers, from the roof plant down to the slab

Technology buildings carry more than a roof. We model every support layer with the frame, so brackets and platforms arrive cut, drilled and labeled for the room they serve.

  1. Roof plant

    Dunnage frames for cooling units, designed for gravity plus ASCE 7 wind and seismic forces on equipment.

  2. Cable and busway

    Support steel for cable trays and busway, set out from your electrical model.

  3. Ducts and pipes

    Duct and pipe supports detailed with the frame so nothing is field-welded later.

  4. Equipment floors

    Floor steel and platforms sized for dense racks, switchgear and batteries.

In the US market

Hyperscale campuses get the headlines, but steady demand also comes from edge sites, telecom buildings and generator enclosures close to the communities they serve. Schedules are tight and equipment often arrives early.

What the building needs

Floors and platforms sized for dense racks and switchgear, supports for cable tray, busway and ducts, and an envelope that keeps out wind-driven rain and meets the local energy code.

How World Steel helps

Services supports are modeled with the frame in Tekla, so brackets and platforms arrive cut and drilled. Power, cooling and fire suppression systems are designed by your engineers and procured separately.

Made in our Vietnam plant

What we supply

Products · Steel buildings

Building types and the frames behind them

Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.

All steel buildings →
Finished feed mill with long blue metal roofs, seen from the air Photo

Data hall

Steel frame with heavy-load equipment floors

Starts from: Data Center Shell Buildings

Rows of roof purlins and rod bracing across a steel frame Photo

Generator building

Frame with generator and fuel tank supports

Starts from: Equipment Shelter Buildings

Warehouse frame from above, purlins and girts fixed to the rafters and columns Photo

Building packages

Planned steel building packages for the building types US owners ask for most.

See packages →

Engineering

Engineered for US codes, your site and this use

Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.

Questions your engineer will raise

  • Equipment weights, busway and cable routes and cooling units are fixed early so supports are sized once.

  • Rooftop dunnage is designed for ASCE 7 wind and seismic forces on equipment as well as gravity.

  • Platform and support tolerances are held by shop drawings checked against the MEP model.

Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.

IBC 2024ASCE 7-22AISC 360AISI S100AWS D1.1AWS D1.3

Site conditions to review

IAS AC472 accreditedWorld Steel is the first and only steel building plant in Vietnam accredited to IAS AC472 for design and fabrication inspection.

Solutions · End to end

From our plant in Vietnam to your site in the US

One partner carries your data centers & technology building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.

  1. Engineered to US codes

    Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.

    Steel building design →
  2. Made in our Vietnam plant

    Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.

    Inside the plant →
  3. Tracked live in PEB Studio

    Watch each of your members move through fabrication and QC release, in real time.

    PEB Studio →
  4. Shipped to a US port

    Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.

    Vietnam to USA →
  5. Erected by your team

    Piece marks, erection drawings and packing lists let your erector start straight away.

    How we work →

PEB Studio

Watch your building being made, in real time

Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data
Live production status

The Data Centers & Technology ecosystem

Everything that connects to your building

Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.

Questions and answers

Data Centers & Technology: what US contractors ask us

16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.

Design and coordination 4 answers

How do you avoid clashes with MEP systems?

Support steel is modeled in Tekla with the frame and checked against your MEP model before fabrication, so brackets arrive in the right place.

Can the roof carry heavy cooling equipment?

Yes. Equipment weights, screen walls and dunnage go into the analysis model early, and the roof framing is sized for them with deflection limits your mechanical engineer sets.

Can data halls be designed as essential facilities?

Yes, when your Engineer of Record sets a higher risk category. Frames, bracing and anchorage are then designed to it.

Do you supply steel for multi-story data centers?

Yes. Braced and moment frames with composite deck floors carry heavy floor loads for stacked data halls, and their connections are designed for the floor-to-floor heights you need.

What we supply 4 answers

Do you supply power or cooling equipment?

No. Power, cooling and fire suppression are designed by your engineers and procured separately. We supply the frame and the steel that supports that equipment.

Which steel packages do you supply for a campus?

Main building frames, roof and wall envelope, equipment platforms, generator and electrical yard steel, pipe and cable tray supports, canopies and stairs, all from our plant in Vietnam.

Can you repeat a design across several sites?

Yes. A standardized edge or telecom building can be fabricated again for each site, with loads re-checked for the local wind, snow and seismic values.

Do you supply raised floors or racks?

No. Raised floors, cabinets and racks come from specialist suppliers. We design the structure that supports them.

Speed, capacity and tracking 4 answers

Can your plant keep up with a hyperscale campus?

World Steel fabricates up to 2,500 metric tons (2,756 short tons) of structural steel a month. On a campus, halls are released as separate lots so the first hall can be erected while the next is in production.

How do we track steel for a fast-track schedule?

PEB Studio shows every member’s status in our Vietnam plant in real time, so your scheduler plans deliveries from actual progress instead of estimates.

Can steel be shipped in the order your crew erects it?

Yes. Members are packed by hall, grid and erection sequence and listed by container, so the site receives what the crane needs next.

Which quality records come with each lot?

Mill certificates traced to heat numbers, weld and coating inspection results and packing lists, collected in a Manufacturing Data Record under our IAS AC472 quality program.

Scope and approvals 4 answers

Does World Steel erect the data center?

No. World Steel designs, fabricates and supplies. Erection and site work are the scope of the US contractor, our customer.

Who seals the structural drawings?

Your Engineer of Record reviews and approves our calculations and drawings, and the PE seal and permits stay with the US project team.

Are shop drawings and Tekla models shared?

Shop and erection drawings are included for every project at no extra cost, and model exports can be shared for clash checks with your MEP and BIM teams.

What do you need to start?

The campus layout, hall sizes, roof equipment loads, the site address and your schedule of halls. A concept from your design team is enough to begin.

The in-depth solution

Data center steel structures, guide by guide

Data halls, heavy roof and MEP loads, equipment yards, pipe and cable racks, multi-story blocks, phased campuses, fast-track schedules, tolerance and vibration, and seismic design: how World Steel engineers and fabricates every part, with 2,500 t (about 2,750 US tons) of capacity a month.

Ready to scope your technology building project?

Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.