Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

West Coast · California

Steel buildings for Northern California, through the Port of Oakland

Oakland is the gateway for the Bay Area, Sacramento, the Central Valley and northern Nevada. We ship your building here in containers, clear it through your broker and hand it to drayage or rail for the last leg.

Channel depth
15.2 m (50 ft) channel and berths
Rail
UP and BNSF intermodal yards at the port
Ocean route
Direct across the Pacific
Our plant → OaklandWest Coast
Illustrative sea route from the World Steel plant in Vietnam to the Port of Oakland, across the Pacific. World Steel plant · Vietnam Oakland
  • Made in our IAS AC472 plant, Vietnam
  • Port of Oakland
  • Illustrative route; set per booking
Location
Oakland, California
Port authority
Port of Oakland
Highways
I-880, I-80, I-580

Made in Vietnam, landed at Oakland

Why ship your building through Oakland

The Port of Oakland sits on the east side of San Francisco Bay, close to the Central Valley’s farms, food plants and distribution centers. Its container terminals are on a 15.2 m (50 ft) channel, and both UP and BNSF run intermodal yards next to the harbor.

Steel for Northern California is fabricated in World Steel’s plant in Vietnam, packed by erection sequence and loaded in Vietnam. Oakland is usually the right discharge port when the site is north of the Tehachapi Mountains, because it saves the long truck run up from Los Angeles.

  • One package, one plant

    Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.

  • Accredited fabrication

    World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.

  • Designed to US codes

    IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.

  • Packed for this port

    Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.

Port facts

Terminals, channel and connections at Oakland

Channel

15.2 m (50 ft) channel and berths

Rail

UP and BNSF intermodal yards at the port

Highways

I-880, I-80, I-580

TerminalWhere / operatorCargo
Oakland International Container TerminalSSA Marine, Berths 55–60Containers
TraPacBerths 25–33Containers
Everport TerminalBerths 35–38Containers
Matson TerminalBerths 61–63, operated by SSAContainers
Project cargo by arrangementOversize pieces are planned case by case with the terminal and carrierBreakbulk

Source: Port of Oakland: seaport facilities, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.

From our plant to Oakland

How your steel gets here

Direct transpacific service from southern Vietnam to San Francisco Bay, sometimes after a Los Angeles or Long Beach call on the same rotation.

Your shipment to Oakland, leg by leg

Run the full simulation →
Our plantTay Ninh, Vietnam

By road

About 2 hours

World Steel pays

Cai Mep / Cat LaiPort of loading

By sea

≈ 6,900 nmi illustrative lane

Split between us

OaklandOakland, California

Customs, truck or rail

Planned with your trucker

You pay

Your siteErected by the US contractor
Under FOB explained

Risk passes to you when the steel is on board the vessel at the named Vietnamese port.

Inland reach

Where steel goes from Oakland

Drayage covers the Bay Area and Sacramento; the Central Valley and Reno are a day’s truck run. UP and BNSF intermodal ramps at the port serve longer hauls east over the Sierra.

Map of the United States with the Port of Oakland, California highlighted, and the states it also serves: Nevada, Utah and Oregon. CA OR UT NV
Port stateAlso served from OaklandPort of Oakland

Designed for the region

Site conditions we design for around Oakland

Seismic Design

The Bay Area sits on active faults, so seismic detailing to AISC 341 is common.

How we design for it

Snow Load Steel Buildings

Sites toward Lake Tahoe and the Sierra foothills need ASCE 7 ground snow loads and drift checks.

How we design for it

Coastal Corrosion Protection

Bay-front sites get coatings chosen for salt air.

How we design for it

On arrival

Receiving your steel at Oakland

Use the port’s rail yards

For Nevada and Utah jobs, ask your logistics provider about the UP or BNSF ramps next to the terminals.

Sequence by harvest season

Central Valley sites are busiest at harvest; plan crane days around it.

Keep the packing list handy

Your broker needs the packing list and commercial invoice before the vessel arrives.

Documents sent ahead to your broker

  • Commercial invoice and packing list per container
  • Bill of lading and certificate of origin
  • Container packing report with seal number and VGM
  • EN 10204 3.1 mill certificates
  • Shipping marks with a QR link to each member’s passport

What the quote states for Oakland

  • The Incoterm, for example FOB Vietnam, CFR or CIF Oakland
  • Who acts as importer of record
  • Containers, flat racks or breakbulk for oversize members
  • Delivery to the port or to a named US place, if offered

No prices, freight rates or duty estimates are published.

PEB Studio · real-time tracking

Follow every bundle from our shop floor to Oakland

Watch production stage by stage, open the container packing report when the seal goes on, and scan a member’s QR tag at the port or on site to see what it is and where it goes.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Built near Oakland

Industries and buildings this port serves

World Steel in the US

Projects we have shipped to the United States

All projects

Asked by US buyers

Oakland shipping questions

Should a Sacramento job ship via Oakland or Los Angeles?

Usually Oakland: it is close to Sacramento and the Central Valley. We confirm the port when the sailing is booked.

How deep is the Oakland channel?

The federal channel and most container berths are 15.2 m (50 ft), enough for the large ships in the Asia trade.

Can you deliver to Reno through Oakland?

Yes. Steel for northern Nevada usually crosses the Sierra on I-80 by truck, or by rail from the port’s intermodal yards.

Keep reading

Related pages

Other West Coast ports

Building within reach of Oakland?

Send the site address and what the building is for. Our engineers confirm the design basis, suggest the gateway port and Incoterm, and return a written scope for steel made in our Vietnam plant.