Where it sits in the US code stack
Where it governs in your building
One model, every output
Everything your team receives comes out of the same Tekla model
Because every drawing, list and file is generated from one model, they cannot disagree with each other. Change the model and every output that depends on it updates.
One Tekla model
Built from the SAP2000 design, every connection modeled, kept current to as-built.
IFC model
Every member, connection and opening, for any IFC viewer.
Architect, MEP engineers, general contractorApproval drawings
General arrangement, frame sections, anchor rods and reactions.
Engineer of Record, plan reviewerShop drawings
Every weld, hole and coat for each assembly and part.
Our plant and quality inspectorsMaterial lists
Steel, plate, hardware and trim quantities, sorted per container.
Purchasing, packing, your contractorErection drawings
Where each piece mark goes, how it bolts and in what order.
Erector, special inspectorAs-built record
Model and drawings updated with every approved change.
Owner, facility manager13 answers from our engineers
BIM & Tekla questions and answers
What design teams and contractors ask about working with our Tekla model: file formats, Revit coordination, clash checks, piece marks, model ownership and changes. Every answer is open below.
Files and formats 4 answers
Can you work from our Revit model?
Yes. Export it to IFC or send the drawings. We take grids, levels and openings from it and send back an IFC of the steel for coordination.
Do we get the 3D model?
Yes. Along with the drawings you get an IFC model of the steel that opens in the usual BIM viewers and design tools.
What software do you use?
SAP2000 for the structural analysis; Tekla Structures for 3D detailing, connections and drawing production.
Can you send DWG or PDF drawings as well?
Yes. Drawings are issued as PDF for review and can be exported to DWG for teams that need to overlay them. The IFC model and the PDFs come from the same revision.
Coordination and clashes 3 answers
How are clashes with MEP handled?
We swap IFC files with your architect and MEP engineers and run clash checks before the approval set goes out. Each clash is logged and closed in the model or by an RFI to the team that owns the other element.
Do you model the whole building or just the steel?
Only the steel structure and the rest of our supply. Architectural, MEP and foundation models stay with their designers; we coordinate with them through IFC.
Can you commit to a level of development such as LOD 400?
Our fabrication model is detailed enough to make every part from it. A contractual level of development is only claimed if your contract defines one and we agree to it in writing.
Piece marks and tracking 3 answers
What is a piece mark, and where do we see it?
The unique ID of every assembly. It appears on the shop drawing, on the label on the steel and on the erection drawing, so the crew finds each member without measuring.
Can the model show what has been erected?
Yes. In PEB Studio the IFC model can color members by status, from fabricated to shipped to erected, as your team scans labels on site.
Do member IDs change between the model and the site?
No. A component's ID and QR code stay the same from the model to the label to the jobsite, which is what lets records, inspections and shipping lists link up.
Changes and ownership 3 answers
What happens if the design changes after approval?
We change the model, reissue the affected drawings under a new revision and log the change, so the as-built model still matches the steel that was made and shipped.
Who owns the model at the end of the project?
You receive the IFC model and the drawing set for the building's life. Use and ownership terms for the native Tekla file are set in the contract.
Can the model help with future additions?
Yes. An as-built IFC with exact member sizes and locations makes the next addition faster to design and simpler to check under the IEBC.
More answers on every US code we design to: search all standards questions.
Why imported steel needs a model
An hour at a desk instead of weeks on site
Your steel is engineered with your team, fabricated in Vietnam and crosses an ocean before it reaches the jobsite. Discover on site that a duct hits a brace or a door is wider than its opening, and the fix has to be fabricated and shipped while the crew stands around. Discover it in the model, and an engineer moves a member before lunch.
That is why every connection is modeled, not just the main members. Think of it as the master record, not a picture: it is the source of each drawing, material list and cutting list. Change the design and the model changes, and every drawing that depends on it updates.
Workflow
Where the model goes during your project
-
Import your design
Your drawings or an IFC export from Revit set the grids, levels and openings.
-
Build the steel
Our detailers turn the SAP2000 design into solid steel: frames and joints first, then the purlins, girts, braces, opening framing and trim.
-
Clash and coordinate
IFC files are swapped with your architect and MEP engineers until every clash is closed, before the approval set goes out.
-
Approval set
Your Engineer of Record receives the general arrangement drawings, anchor rod plan and reactions, and comments are fixed in the model.
-
Shop drawings
Approval unlocks the fabrication package: the model prints every part and assembly sheet, plus the material and hardware lists the plant needs.
-
Erection and as-built
Erection drawings place every piece mark, and approved changes stay in the model so the as-built record matches what shipped.
From model to laydown yard
A piece mark that carries its own history
One mark, three places
The same piece mark appears on the shop drawing, the factory label and the erection drawing.
Linked records
PEB Studio ties each mark to its heat numbers, welds, inspections and coating readings.
Scanned when packed
QR labels are scanned as steel is loaded, so each container or bundle list is built from those same marks.
Easy to find
Your erector finds a member by its mark and label instead of tape-measuring beams in the laydown area.
After fabrication
The model travels with the steel
Tekla exports an IFC, and PEB Studio, World Steel's project platform, loads it. A member's component ID and QR code never change between model and jobsite, and the 3D view can color members by whether they are erected yet.
Demonstration data
Passport
Scan the label, read the member’s history
The QR label opens a read-only passport with identification, drawings, shop stages, bundle, container and site status. Reading it needs no login, and the code itself stores no data.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Before drawings are issued
Coordination checks we run in the model
- Each door, window and louver against the steel framing around it
- Ducts, pipes, sprinkler mains and cable trays against braces and purlins
- Hook height and clearance along any crane runway
- Interfaces with mezzanines, stairs and platforms
- Roof drains, penetrations and gutter outlets
- Rod locations compared with the footing and slab plans
- Support points for rooftop solar and equipment
- Member lengths and weights checked against the container or flat rack each one will ride in
Detailed in Tekla
US projects built from the model
Who does what with the model
The model is ours to build and yours to check
The Tekla model is the source of every drawing and list we issue. Your team does not need Tekla to use it.
World Steel
- Builds the Tekla Structures model from the approved design
- Runs clash and coordination checks in the model
- Exports drawings, bolt lists and IFC from the same model
Design team
- Sends architectural and MEP models as IFC, or drawings and sketches
- Reviews the model or its IFC export in their own software
- Returns comments on the drawings that come out of it
US contractor, our customer
- Uses the erection drawings and bolt lists from the model
- Follows each piece mark from the plant to the site in PEB Studio
- Reports field questions against piece marks
What a coordinator checks
Four model checks a coordinator looks for
Coordination is checked before the drawings go out for approval.
| The reviewer checks | Where it comes from | What our package shows |
|---|---|---|
| Clashes with other trades | IFC exchange | Steel checked against the architectural and MEP models you send. |
| Openings and embeds | Approval drawings | Door, duct and equipment openings located in the model and shown on the drawings. |
| Bolt lists match the joints | Tekla model | Bolt lists are exported from the same joints the drawings show. |
| Piece marks are unique and traceable | PEB Studio | Each piece mark links to its drawing, its material and its inspection records. |
Out of the model
Four records that come out of one model
Because they share a source, they cannot disagree.
IFC export
The steel model for your design team's software.
3D Building Explorer →Drawing set
Approval, shop and erection drawings under one revision.
Shop drawing coordination →Bolt and part lists
Every bolt and part, by bundle and joint.
RCSC bolting →Piece mark history
Each piece followed from cutting to shipping.
PEB Studio →
Real photos from World Steel
From the model in our office to bundles on the floor
Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.
BIM & Tekla never works alone
The standards and guides it works with
Each link opens the full page, with its own questions and answers.
Scope
What we model in Tekla is limited to the steel structure and the rest of our supply. Architectural, MEP and foundation models remain with their own designers, and we coordinate with them through IFC. No BIM certification or contractual level of development is claimed unless your contract sets one.
Who does what
World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.
Verified Edition: As your project specifies
Source record: https://worldsteelgroup.com/capabilities/
Last checked: November 8, 2026. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.
All US codes & standardsCoordinating steel with your Revit model?
Send an IFC export or the drawings. We build the steel in Tekla, send back an IFC for clash checks and keep the model current through approval, fabrication and as-built.