Engineering & standards · BIM

One Tekla model drives every drawing, from approval set to final bolt

After the SAP2000 analysis, our detailers build your entire steel structure in Tekla Structures. Everything downstream comes out of that model: the approval set your Engineer of Record reviews, the shop drawings our plant fabricates from, the IFC file your architect and MEP engineers coordinate against, and the piece marks your ironworkers read on site.

Detailing
Tekla Structures
Analysis
SAP2000
Exchange
IFC in both directions with your design team
Inputs we take
PDF or DWG drawings, IFC from Revit and other tools, spreadsheets, hand sketches

One model, every output

Everything your team receives comes out of the same Tekla model

Because every drawing, list and file is generated from one model, they cannot disagree with each other. Change the model and every output that depends on it updates.

One Tekla model

Built from the SAP2000 design, every connection modeled, kept current to as-built.

IFC model

Every member, connection and opening, for any IFC viewer.

Architect, MEP engineers, general contractor

Approval drawings

General arrangement, frame sections, anchor rods and reactions.

Engineer of Record, plan reviewer

Shop drawings

Every weld, hole and coat for each assembly and part.

Our plant and quality inspectors

Material lists

Steel, plate, hardware and trim quantities, sorted per container.

Purchasing, packing, your contractor

Erection drawings

Where each piece mark goes, how it bolts and in what order.

Erector, special inspector

As-built record

Model and drawings updated with every approved change.

Owner, facility manager

13 answers from our engineers

BIM & Tekla questions and answers

What design teams and contractors ask about working with our Tekla model: file formats, Revit coordination, clash checks, piece marks, model ownership and changes. Every answer is open below.

Not answered here?Send your BIM & Tekla question with the drawings. An engineer replies in writing.

Files and formats 4 answers

Can you work from our Revit model?

Yes. Export it to IFC or send the drawings. We take grids, levels and openings from it and send back an IFC of the steel for coordination.

Do we get the 3D model?

Yes. Along with the drawings you get an IFC model of the steel that opens in the usual BIM viewers and design tools.

What software do you use?

SAP2000 for the structural analysis; Tekla Structures for 3D detailing, connections and drawing production.

Can you send DWG or PDF drawings as well?

Yes. Drawings are issued as PDF for review and can be exported to DWG for teams that need to overlay them. The IFC model and the PDFs come from the same revision.

Coordination and clashes 3 answers

How are clashes with MEP handled?

We swap IFC files with your architect and MEP engineers and run clash checks before the approval set goes out. Each clash is logged and closed in the model or by an RFI to the team that owns the other element.

Do you model the whole building or just the steel?

Only the steel structure and the rest of our supply. Architectural, MEP and foundation models stay with their designers; we coordinate with them through IFC.

Can you commit to a level of development such as LOD 400?

Our fabrication model is detailed enough to make every part from it. A contractual level of development is only claimed if your contract defines one and we agree to it in writing.

Piece marks and tracking 3 answers

What is a piece mark, and where do we see it?

The unique ID of every assembly. It appears on the shop drawing, on the label on the steel and on the erection drawing, so the crew finds each member without measuring.

Can the model show what has been erected?

Yes. In PEB Studio the IFC model can color members by status, from fabricated to shipped to erected, as your team scans labels on site.

Do member IDs change between the model and the site?

No. A component's ID and QR code stay the same from the model to the label to the jobsite, which is what lets records, inspections and shipping lists link up.

Changes and ownership 3 answers

What happens if the design changes after approval?

We change the model, reissue the affected drawings under a new revision and log the change, so the as-built model still matches the steel that was made and shipped.

Who owns the model at the end of the project?

You receive the IFC model and the drawing set for the building's life. Use and ownership terms for the native Tekla file are set in the contract.

Can the model help with future additions?

Yes. An as-built IFC with exact member sizes and locations makes the next addition faster to design and simpler to check under the IEBC.

More answers on every US code we design to: search all standards questions.

Why imported steel needs a model

An hour at a desk instead of weeks on site

Your steel is engineered with your team, fabricated in Vietnam and crosses an ocean before it reaches the jobsite. Discover on site that a duct hits a brace or a door is wider than its opening, and the fix has to be fabricated and shipped while the crew stands around. Discover it in the model, and an engineer moves a member before lunch.

That is why every connection is modeled, not just the main members. Think of it as the master record, not a picture: it is the source of each drawing, material list and cutting list. Change the design and the model changes, and every drawing that depends on it updates.

Workflow

Where the model goes during your project

  1. Import your design

    Your drawings or an IFC export from Revit set the grids, levels and openings.

  2. Build the steel

    Our detailers turn the SAP2000 design into solid steel: frames and joints first, then the purlins, girts, braces, opening framing and trim.

  3. Clash and coordinate

    IFC files are swapped with your architect and MEP engineers until every clash is closed, before the approval set goes out.

  4. Approval set

    Your Engineer of Record receives the general arrangement drawings, anchor rod plan and reactions, and comments are fixed in the model.

  5. Shop drawings

    Approval unlocks the fabrication package: the model prints every part and assembly sheet, plus the material and hardware lists the plant needs.

  6. Erection and as-built

    Erection drawings place every piece mark, and approved changes stay in the model so the as-built record matches what shipped.

From model to laydown yard

A piece mark that carries its own history

One mark, three places

The same piece mark appears on the shop drawing, the factory label and the erection drawing.

Linked records

PEB Studio ties each mark to its heat numbers, welds, inspections and coating readings.

Scanned when packed

QR labels are scanned as steel is loaded, so each container or bundle list is built from those same marks.

Easy to find

Your erector finds a member by its mark and label instead of tape-measuring beams in the laydown area.

After fabrication

The model travels with the steel

Tekla exports an IFC, and PEB Studio, World Steel's project platform, loads it. A member's component ID and QR code never change between model and jobsite, and the 3D view can color members by whether they are erected yet.

PEB Studio digital passport for a steel member with engineering, shop and logistics data (demonstration data) Demonstration data

Passport

Scan the label, read the member’s history

The QR label opens a read-only passport with identification, drawings, shop stages, bundle, container and site status. Reading it needs no login, and the code itself stores no data.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Before drawings are issued

Coordination checks we run in the model

  • Each door, window and louver against the steel framing around it
  • Ducts, pipes, sprinkler mains and cable trays against braces and purlins
  • Hook height and clearance along any crane runway
  • Interfaces with mezzanines, stairs and platforms
  • Roof drains, penetrations and gutter outlets
  • Rod locations compared with the footing and slab plans
  • Support points for rooftop solar and equipment
  • Member lengths and weights checked against the container or flat rack each one will ride in

Who does what with the model

The model is ours to build and yours to check

The Tekla model is the source of every drawing and list we issue. Your team does not need Tekla to use it.

World Steel

  • Builds the Tekla Structures model from the approved design
  • Runs clash and coordination checks in the model
  • Exports drawings, bolt lists and IFC from the same model

Design team

  • Sends architectural and MEP models as IFC, or drawings and sketches
  • Reviews the model or its IFC export in their own software
  • Returns comments on the drawings that come out of it

US contractor, our customer

  • Uses the erection drawings and bolt lists from the model
  • Follows each piece mark from the plant to the site in PEB Studio
  • Reports field questions against piece marks

What a coordinator checks

Four model checks a coordinator looks for

Coordination is checked before the drawings go out for approval.

The reviewer checksWhere it comes fromWhat our package shows
Clashes with other tradesIFC exchangeSteel checked against the architectural and MEP models you send.
Openings and embedsApproval drawingsDoor, duct and equipment openings located in the model and shown on the drawings.
Bolt lists match the jointsTekla modelBolt lists are exported from the same joints the drawings show.
Piece marks are unique and traceablePEB StudioEach piece mark links to its drawing, its material and its inspection records.

Real photos from World Steel

From the model in our office to bundles on the floor

Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.

Office block of World Steel standing between two fabrication halls Photo
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Space-truss roof being erected over a large food processing hall Photo
Space-truss roof under erection on a World Steel job in southern Vietnam.
Steel bundles stacked high on a packing frame awaiting loading Photo
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Packing hall with steel bundles, timber dunnage and loading racks Photo
Timber dunnage and bundles in the packing hall at the Vietnam plant.

BIM & Tekla never works alone

The standards and guides it works with

Each link opens the full page, with its own questions and answers.

Scope

What we model in Tekla is limited to the steel structure and the rest of our supply. Architectural, MEP and foundation models remain with their own designers, and we coordinate with them through IFC. No BIM certification or contractual level of development is claimed unless your contract sets one.

Who does what

World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.

Verified Edition: As your project specifies

Source record: https://worldsteelgroup.com/capabilities/

Last checked: November 8, 2026. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.

All US codes & standards

Coordinating steel with your Revit model?

Send an IFC export or the drawings. We build the steel in Tekla, send back an IFC for clash checks and keep the model current through approval, fabrication and as-built.