From Hilton Head and Beaufort to Charleston and Myrtle Beach, the South Carolina coast sits in the hurricane-prone region of ASCE 7. Design wind speeds rise toward the shore, wind-borne debris rules apply near it, and salt air attacks exposed steel. For low, wide buildings near the coast, wind usually governs the frame, the girts and purlins, and the anchors.
Why it matters
Wind finds the weakest link
Hurricane damage to steel buildings usually starts at an opening or an edge: a door blows in, the building pressurizes and the roof lifts. Components and cladding near corners and eaves see the highest pressures, and every load has to find its way down through purlins, rafters, columns and anchors.
We design the frame, the secondary members and the anchors as one load path for the wind speed at your site, and we detail doors and openings for the pressures your Engineer of Record sets. Near the shore we choose coatings or galvanizing for salt air.
What we design and fabricate
Steel for the hurricane coast
Load path
Frames, bracing and anchors designed as one path.
Framed openings
Door jambs and headers for design pressures.
Girts and purlins
Spacing and bracing for corner and edge zones.
Coastal coatings
Paint systems or galvanizing for salt air.
Who does what
Wind design, split clearly
World Steel supplies
- Frames, girts, purlins and bracing for the site wind speed
- Anchor bolt layouts and reactions for the foundations
- Framed openings for the design pressures
- Coatings or galvanizing for the exposure
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and PE seal
- Tested doors, windows and impact protection
- Foundations, erection and site work
- Plan review and inspections
- The building permit
What we do not claim
We publish no wind rating for a building and hold no product approval for doors or cladding. Wind loads come from ASCE 7 for your site and are confirmed by your Engineer of Record.
South Carolina ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.