Minnesota · Data centers
Structural steel for Minnesota data centers
Cold air for free cooling, water and a strong grid have brought data centers to the Twin Cities metro, from Chaska and Shakopee to Rosemount and the north suburbs. The halls carry heavy cooling plant on the roof and beside the building, generator yards outside, and in Minnesota all of it sits in snow.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail on the northern route to your Minnesota site.
- Clusters
- Twin Cities metro
- Draw
- Free cooling in cold air
- Roof
- Heavy plant in snow
- Release
- Phase by phase
Why it matters
Cold air helps; snow adds load
Free cooling cuts energy, but the cooling units and air handlers are still big and heavy, and every rooftop unit collects drift. Cable trays hang below the deck, generator and switchgear yards need platforms and shelters, and owners build campus phases one hall after another.
We design or detail hall frames, roof and yard platforms with their drift and service support steel, keep the model for the next phase, and release the steel in the sequence your crew erects.
What we design and fabricate
Steel for data centers
Hall frames
Frames and roofs for large data halls.
Roof plant
Platforms for cooling units, designed with drift.
Service supports
Cable tray and pipe support steel.
Yard steel
Platforms and shelters for generators and switchgear.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall, roof and platform design or detailing
- Service support steel coordinated with the model
- Packages released phase by phase
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Owner design standards and loads
- Engineer of Record approval and PE seal
- Permit and inspections
- Electrical, cooling and IT systems
- Erection and site work
Minnesota
What we do not claim
World Steel names no data center owner or operator as a customer and claims no completed Minnesota data center.
Minnesota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Minnesota contractors
Minnesota contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Minnesota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Minnesota project is cut, welded, inspected and packed.
Q&A
What Minnesota buyers ask
Do you design rooftop platforms for snow?
Yes. Platforms for cooling plant are designed with their own snow and drift, to your Engineer of Record’s design basis.
Can each phase repeat the last?
Yes. We keep the model and details so repeat halls are released faster.
How large a campus can you supply?
Our plant fabricates 2,500 t a month and releases large packages hall by hall.
Official sources: Minnesota Department of Employment and Economic Development
Minnesota solutions
Every Minnesota guide
Related pages
Code facts on this page summarize Minnesota practice, the Minnesota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Minnesota?
Send the drawings or the site address, size and use. We set the Minnesota design basis with your Engineer of Record, design or detail the steel to the Minnesota State Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail on the northern route to your site.