New Jersey · Data centers
Structural steel for New Jersey data centers
New Jersey sits next to the New York financial markets and the subsea cables that land on the coast, so data centers cluster in Secaucus, Piscataway, Totowa and across North and Central Jersey. Sites are tight, so halls go up more than one floor, with heavy cooling plant on the roof and generator yards beside them.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Port Newark–Elizabeth, a short drive from your New Jersey site.
- Clusters
- Secaucus, Piscataway, North Jersey
- Halls
- Often multi-story
- Roof
- Heavy cooling plant
- Yards
- Generators and switchgear
Why it matters
Heavy plant, tight sites, fast schedules
Data halls carry heavy loads from cooling units on the roof, cable trays below the deck and raised floors or slabs on grade. On tight New Jersey sites, halls stack on two or more floors, which means composite floors and heavier columns. Owners build in phases and want each phase fast.
We design or detail the hall frames and floors, roof and yard platforms and service supports, keep the model for the next phase, and release the steel in the sequence your crew erects.
What we design and fabricate
Steel for data centers
Hall frames
Frames and floors for single and multi-story halls.
Roof plant
Platforms and dunnage for cooling units.
Service supports
Cable tray and pipe support steel.
Yard steel
Platforms and shelters for generators and switchgear.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall, floor and platform design or detailing
- Service support steel coordinated with the model
- Packages released phase by phase
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Owner design standards and loads
- Engineer of Record approval and PE seal
- Municipal permit and inspections
- Electrical, cooling and IT systems
- Erection and site work
New Jersey
What we do not claim
World Steel names no data center owner or operator as a customer and claims no completed New Jersey data center.
New Jersey ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Jersey contractors
New Jersey contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in New Jersey. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Jersey project is cut, welded, inspected and packed.
Q&A
What New Jersey buyers ask
Can you supply multi-story data halls?
Yes. Composite floors, columns and girders for halls on two or more floors, to your Engineer of Record’s design basis.
Do you supply roof and yard platforms?
Yes. Platforms and dunnage for cooling plant, generators and switchgear can be part of the package.
Can each phase repeat the last?
Yes. We keep the model and details so repeat halls are released faster.
Official sources: New Jersey Economic Development Authority
New Jersey solutions
Every New Jersey guide
Related pages
Code facts on this page summarize New Jersey practice, the New Jersey Uniform Construction Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Jersey?
Send the drawings or the site address, size and use. We set the New Jersey design basis with your Engineer of Record, design or detail the steel to the Uniform Construction Code and to wind, snow and flood, and quote it made in our plant in Vietnam, packed in erection order for Port Newark and a short drive to your site.