Certificates & accreditations
IAS AC472 certificate of accreditation, valid to August 1, 2027
The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.
JPG · 172 KB · 1 page · English
20,000 m²
of plant (about 215,000 sq ft) at Hai Son Industrial Park
2,500 t
metric tons of structural steel the plant can fabricate each month
300+
people on staff in engineering, fabrication and quality control
IAS AC472Part A fabrication + Part C design, valid to Aug 1, 2027
7
welding, fabrication and management system certifications on file
140
projects published from this plant, across 14 countries
1
piece mark and QR code per member, carried from Tekla to your job site
The plant
The engineering team in Ho Chi Minh City designs each metal building system, and World Steel’s own fabrication shops at Hai Son Industrial Park, Tay Ninh Province, build it. A single IAS AC472 accreditation covers both, so the engineer sizing your rafters and the welder joining them follow the same audited procedures.
For a US job an ocean away, that discipline is the point. Your erector cannot run to a local service center for a missing clip or a misplaced hole, so the shop is set up to find mistakes before the container door closes.
Group capacity
World Steel’s own plant fabricates 2,500 metric tons of structural steel a month. Six affiliated member fabrication plants work alongside it, bringing the group’s supply capacity to more than 6,000 metric tons a month, enough to keep a large US package on schedule.
6,000+ t / month
2,500 t a month at Hai Son Industrial Park, Tay Ninh. This is the plant accredited under IAS AC472 and the one shown on this page.
Member fabrication facilities in the World Steel network add capacity when a project’s tonnage or schedule calls for more than one shop.
You deal with World Steel from quote to shipment. Your quote confirms the production plan and ship dates for your full tonnage.
Production
A member moves on only after the station before it has closed out its record, and you can open those records for your own job in PEB Studio.
Incoming plate, sections and coil from Vietnamese mills are matched to their mill certificates and logged by heat number before cutting. That record stays attached to each member for good.
Record: EN 10204 3.1 certificates, heat numbers
See how this station worksWebs, flanges and plates are cut by CNC laser, plasma and oxy-fuel machines straight from Tekla output. Our laser machines cut steel up to 100 mm (about 4 in) thick.
Record: Cut lists generated from the model
See how this station worksBolt holes are laser cut in plate up to 100 mm (about 4 in) thick, or drilled and punched on CNC machines, in end plates, base plates, clips and splices, so your erector bolts up without reaming or torch work in the field.
Record: Hole patterns taken from shop drawings
See how this station worksBuilt-up and tapered columns and rafters are welded flange to web on automatic submerged-arc (SAW) lines that lay long, uniform welds on deep sections.
Record: SAW procedures qualified beforehand
See how this station worksStiffeners, end plates, clips and bracing parts are fitted and then welded by FCAW or GMAW, using qualified procedures and welders whose qualifications are on file.
Record: WPS, PQR and welder records checked on each weld report
See how this station worksAfter welding, members are straightened and measured for length, camber, hole location and end-plate squareness against drawing tolerances.
Record: Dimensional inspection report
See how this station worksSteel is shot or grit blasted to the specified cleanliness and anchor profile, then painted with the agreed system. When the design calls for hot-dip galvanizing, we coordinate it with a galvanizer.
Record: Profile, dry film thickness and adhesion logged
See how this station worksA QC inspector signs off each member one stage at a time. Only released, coated members scan into a bundle, and bundles load in the order your erector will need them.
Record: Bundle QR, packing list, container report
See how this station worksAt 2,500 metric tons of monthly capacity, the shop runs several jobs in parallel. Your quote confirms the production slot and the ship date that line up with your schedule.
Inside the plant
All photos here were shot on World Steel’s own shop floor in Vietnam. Members pass from one area to the next only once the check for that area is logged.
Plate, shapes and coil are verified against mill certificates and racked by grade and heat number.
Cutting, built-up beam lines, fit-up and welding for columns, rafters, girders and trusses.
Shot blasting to the specified profile, followed by primer and finish coats applied and measured in the paint hall.
Released members are bundled by erection area, strapped to dunnage, tagged and loaded in erection order.
What we make
Every piece of structural steel in a World Steel building comes off this shop floor. Doors, roll-up doors and windows come from World Steel partners, and your quote names the maker of each item.
Photo
Built-up columns and rafters, tapered rigid frames, and clear-span or multi-span framing.
Photo
Beams, columns and bracing cut from mill shapes for frames and multistory structures.
Photo
Steel trusses, curved built-up rafters and long-span roof framing.
Photo
Crane runway girders and columns, equipment platforms and machine support frames.
Photo
Mezzanine framing, work platforms, floor support steel and multistory frames.
Photo
C and Z purlins, wall girts, eave struts and framed openings.
Photo
Base plates, gussets, connection plates, brackets, clips and stiffeners.
Photo
Zinc-rich primers plus epoxy and polyurethane systems, applied and checked inside the plant.
Engineering into production
SAP2000 handles the analysis and Tekla Structures the detailing. Once you approve the model, it goes to PEB Studio as IFC, where the bill of materials, cut lists and a unique piece mark and QR code for each member are generated. Fabricators work from that data, never from hand-copied spreadsheets.
Welding & quality control
Bureau Veritas certifies the plant’s fusion welding to the comprehensive quality level of EN ISO 3834-2. Before a member advances, its weld report in PEB Studio is matched to the procedure, the procedure qualification record and the welder’s own qualification.
All held by World Steel Construction JSC. Each row shows whether we confirmed it with the issuer or are listing it as World Steel published it.
| Certification | What it covers | Issuer | Valid until | Status |
|---|---|---|---|---|
| IAS AC472 — Metal Building Systems | Two parts are accredited. Part A covers the Hai Son Industrial Park plant, where structural weldments and welded cold-formed products are ma... | International Accreditation Service (IAS) | Aug 1, 2027 | Verified |
| EN ISO 3834-2 Welding QualityINY-CER/23/1056 Rev.0 | Fusion welding quality managed at the comprehensive level defined by ISO 3834. | Bureau Veritas Vietnam | — | Details confirmed in quote |
| EN 1090 EXC3 (CE marking)2797 CPR 827443 | Covers design, manufacture with welding, and installation of structural steel components in execution classes up to EXC3. | BSI Group The Netherlands B.V. (NB 2797) | — | Details confirmed in quote |
| AS/NZS 5131 CC3BMP 827566 | Structural steel work in construction category CC3: fabrication and welding, surface preparation, erection and modification of members. | BSI Group ANZ (Benchmark, JAS-ANZ accredited) | Jul 31, 2030 | Details confirmed in quote |
| ISO 9001:2015786902 | Company-wide quality management. | Guardian Independent Certification Ltd (UKAS accredited) | Sep 5, 2029 | Details confirmed in quote |
| ISO 14001:2015799559 | Company-wide environmental management. | Guardian Independent Certification Ltd (UKAS accredited) | Sep 5, 2029 | Details confirmed in quote |
| ISO 45001:2018721070 | Workplace health and safety management across the company. | Guardian Independent Certification Ltd (UKAS accredited) | Sep 11, 2029 | Details confirmed in quote |
World Steel holds no AISC or CSA W47.1 certification and does not claim one. What IAS AC472 means for US jobs
Coating shop
A Gulf Coast warehouse, a Midwest barn breathing ammonia and a parking structure soaked in de-icing salt need different protection. We pick the system for your site’s ISO 12944 corrosivity category, apply it in the shop over a blasted surface, and measure it before QC release.
Prepare
Shot or grit blast to the specified cleanliness grade and anchor profile.
Apply
Zinc-rich primer with epoxy and polyurethane coats, or hot-dip galvanizing and duplex systems via a galvanizer.
Measure
Anchor profile, dry film thickness and adhesion entered in the coating inspection report.
No coating life is promised: ISO 12944 durability classes are for planning only, and actual performance depends on exposure, field touch-up and upkeep.
Coastal and corrosive-site protection →
See it for yourself
The Inspection and Test Plan is agreed before fabrication starts. Its hold and witness points set when you look; you decide how.
Dial in from your desk. Our QC inspector carries the camera to the member, takes whatever measurements you call for, and sends you the recording.
Book an online audit →Engage a third-party inspection firm. They get advance notice of each hold and witness point, and their findings are filed against the members inspected.
Owners, EORs and contractors can visit Hai Son Industrial Park for a witness point, a pre-shipment review or a full process audit.
Book a plant visit →Separate from anything you arrange, Smith-Emery Laboratories (IAS AA-554) inspects the plant as the agency named in its IAS AC472 in-plant inspection program.
PEB Studio
World Steel manages its own production in PEB Studio. Fabricators scan a member’s QR code to log each operation, the app blocks steps taken out of sequence, and QC releases each stage separately. Your client account shows the same progress, quality history and packing data once released, through a weekly report or any time you log in.
Demonstration data
Production
Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Photos
Every image is World Steel’s own plant in Vietnam, its shops and members ready to ship. Nothing is stock photography.
Buildings fabricated in this plant
Completed projects →
Export
Bundles are grouped by erection area and sequence, tagged and loaded at the plant into 20′ or 40′ containers, open-tops or flat-racks, or shipped breakbulk, on ISPM 15 treated dunnage. Each box sails from Cat Lai or Cai Mep with an ISO 17712 seal, a declared verified gross mass and a packing report with photos and video.
Bundle weights and lengths are planned for the inland leg too, whether your steel goes from Long Beach by rail or from Savannah on a flatbed.
Photo
Photo
US state markets we serve from this plant
Vietnam → United States
Ordering steel from Vietnam puts you in good company. The federal government’s own trade figures for all goods show imports from Vietnam climbing fast enough to rank it among the biggest sources of US imports.
2023
$114.4B
US$ billion
-10.3% vs 2022
#7 US import source
2024
$136.3B
US$ billion
+19.2% vs 2023
#6 US import source
2025
$193.9B
US$ billion
+42.2% vs 2024
2026 (Jan–Sep)
$204.8B
US$ billion
+45.7% vs Jan–Sep 2025
Already above all of 2025
Values are goods imports in nominal dollars without seasonal adjustment. Each rank is the position Vietnam held by import value in that year’s Census Bureau top-partner table. The 2026 row is January through September only. Sources: Census Bureau: US trade in goods with Vietnam, by year; Census Bureau: 2023 ranking of US trading partners; Census Bureau: 2024 ranking of US trading partners; USTR: Vietnam trade summary.
FAQ
Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An), Vietnam, a short drive west of Ho Chi Minh City. The engineers who design your building work at 55 Le Thuc Hoach Street in Ho Chi Minh City.
No. All structural steel for US orders is fabricated in this plant in Vietnam and shipped to a US port. World Steel USA’s Westminster, California location is an office for quotes, coordination and support, not a factory. Your team follows production live in PEB Studio instead of visiting a local shop.
Mainly from mills in Vietnam, with Japan, Korea, Indonesia or Thailand when the specification calls for it. Plate, sections and coil are matched to their mill certificates on arrival and traced to each finished member.
Yes. World Steel works as the OEM manufacturer for your project, and piece labels, bundle tags and product labels can carry your brand and project information.
World Steel Construction JSC is accredited under IAS AC472 for metal building systems. Part A covers fabrication at Hai Son and Part C covers design at the Ho Chi Minh City office, and an IAS-accredited inspection agency audits the plant under the program. The current record and expiry date are on our IAS AC472 page.
No. Hold and witness points can be attended live on Zoom or Microsoft Teams, with the recording sent afterward, or covered by a third-party inspector you hire. Plant visits are welcome if you prefer to see it in person.
Fabrication capacity is 2,500 metric tons of structural steel a month, on a 20,000 m² (about 215,000 sq ft) site staffed by more than 300 people. Your quote confirms the production slot and ship date for your tonnage, and after signing you watch progress in PEB Studio.
All structural steel: built-up and tapered frames, hot-rolled members, trusses, crane and mezzanine steel, purlins and girts, plates and connection parts, along with their shop coating. Doors, roll-up doors and windows come from World Steel partners and optional systems from specialist makers; the quote names the source of each line.
No, and we do not say otherwise. For metal building systems the plant holds IAS AC472 accreditation, which relates to the IBC Chapter 17 special inspection provisions. Your building official decides how it applies to your permit.
Members are bundled in erection order and loaded at the factory into containers, onto flat-racks or as breakbulk, then shipped from Cat Lai or Cai Mep to a US gateway port. Every container comes with a packing report listing its seal number and verified gross mass, with photos and video.
Open call · US contractors
General contractors, design-build and EPC firms, erectors and dealers who need structural steel: let’s build a long-term, win-win partnership. You win and build the project in your market. Our plant in Vietnam designs, fabricates and supplies the complete steel structure, with 2,500 metric tons a month behind your bids.
You bring
We bring
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.
Download center
Certificates & accreditations
The certificate in force today: Part A and Part C, with Smith-Emery still conducting the plant inspections.
JPG · 172 KB · 1 page · English
Certificates & accreditations
World Steel's quality management system, audited and found to conform to ISO 9001:2015. Certified since September 2023.
PDF · 327 KB · 1 page · English
Certificates & accreditations
World Steel's environmental management system, audited and found to conform to ISO 14001:2015. Certified since September 2023.
PDF · 337 KB · 1 page · English
Certificates & accreditations
World Steel's occupational health and safety system, audited to ISO 45001:2018. Certified since September 2023.
PDF · 331 KB · 1 page · English